ML20198E005

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-414/85-48 on 851007-10.No Violations or Deviations Noted
ML20198E005
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 10/29/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20198E009 List:
References
NUDOCS 8511130112
Download: ML20198E005 (1)


See also: IR 05000414/1985048

Text

0;

,

c

'

OcTE9le

Duk'e Power Company-

'/TTN: -Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

. Charlotte,-NC 28242

Gentlemen:

SUBJECT:

REPORT NO. 50-414/85-48

On October 7-10,1985, NRC inspected activitf es authorized by NRC Construction

Permit No. CPPR-117 for your Catawba facility._ At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

  • '

Sincerely,

M

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-414/85-48

cc w/ enc 1:

W . L. Dick, Vice President - Construction

'

d . W. Hampton, Station Manager

w/ encl:

$ 113O g 05 g

gf. N

our NRR

ACResidentInspector

o

PDR

Document Control Desk

State of South Carolina

f

'

RII

RII

RI

gp

JHaVris:Jw

T onicn

AHerdt

10Al/85

10p(/85

10/J/85

i

l

A ?I$ a