Forwards Insp Rept 50-267/86-08 on 860303-07 & Notices of Violation & Deviation
ML20198D188
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/19/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Walker R
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20198D195 List:
References
NUDOCS 8605230180
Download: ML20198D188 (2)


See also: IR 05000267/1986008

Text

,

s 'i

In Reply Refer To:

Docket: 50-267/86-08

Public Service Company of Colorado

ATTN: Mr. - R. F. Walker, President

P. O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

This refers to the inspection conducted by Messrs. M. E. Skow, W. R. Bennett,

and W. M. McNeill of this office during the- period March 3-7, 1986, of

activities authorized by NRC Operating License DPR-34 for Fort St. Vrain

Nuclear Generating Station, and to the discussion of our findings with

Mr. L. W. Singleton, and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included Quality Assurance, Offsite Review

Comittee, Offsite Support Staff, Onsite Review Committee, and Tests and

Experiments - Program. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the inspectors. These findings are documented

in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

During this inspection, it was also found that certain of your activities

appeared to deviate from a' commitment to an industry standard made to the NRC

in your FSAR. This item and reference to the comitment is identified in the

enclosed Notice of Deviation. You are requested to respond to this deviation

in writing. Your response should be based on the specifics contained in the

Notice of Deviation enclosed with this letter.

r 5 :P

SEow:/A f PB/A

WR8ennett [ T/k

cNeil

R /A

Jpaudon

RPB

JEGagl

-

do

/g/86 } $/g/86 Wy/($/86

s g/86 f/f

f

8605230180 860519 th

PDR ADOCK 05000267

G PDR

.

. ..

- Public Service Company of Colorado -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - Notice of Deviation

3. Appendix C - NRC Inspection Report

50-267/86-08

cc w/ enclosures:

J. W. Gahm, Manager, Nuclear

Production Division

Fort St.- Vrain Nuclear Station

16805 WCR 19 1/2

Platteville, Colorado 80651

L. Singleton, Manager, Quality

Assurance Division

(Same Address)

Colorado Radiation Control Program Director

bec distrib. by RIV:

  • RPB R. D. Martin, RA
  • Resident Inspector *R&SPB
  • SectionChief(RPB/A) *RSB
  • SectionChief(RPB/ES) RIV File
  • M. Skow, RPB/A *RSTS OPERATOR
  • MIS System DRSP

DMB (IE01) *W. R. Bennett, RPB/A

  • w/766 *W. M. McNeill, RPB/A