In Reply Refer To:
Docket: 50-267/86-08
Public Service Company of Colorado
ATTN: Mr. - R. F. Walker, President
P. O. Box 840
Denver, Colorado
80201-0840
Gentlemen:
This refers to the inspection conducted by Messrs. M. E. Skow, W. R. Bennett,
and W. M. McNeill of this office during the- period March 3-7, 1986, of
activities authorized by NRC Operating License DPR-34 for Fort St. Vrain
Nuclear Generating Station, and to the discussion of our findings with
Mr. L. W. Singleton, and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included Quality Assurance, Offsite Review
Comittee, Offsite Support Staff, Onsite Review Committee, and Tests and
Experiments - Program. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations by the inspectors. These findings are documented
in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
During this inspection, it was also found that certain of your activities
appeared to deviate from a' commitment to an industry standard made to the NRC
in your FSAR. This item and reference to the comitment is identified in the
enclosed Notice of Deviation. You are requested to respond to this deviation
in writing. Your response should be based on the specifics contained in the
Notice of Deviation enclosed with this letter.
T/k
R /A
RPB
[
Wy/($/86
5 : P
f
PB/A
SEow:/A
r
-
cNeil
Jpaudon
JEGagl
do
WR8ennett
/g/86
}
$/g/86
s
g/86
f/f
f
th
8605230180 860519
ADOCK 05000267
G
.
.
..
- Public Service Company of Colorado
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - Notice of Deviation
3.
Appendix C - NRC Inspection Report
50-267/86-08
cc w/ enclosures:
J. W. Gahm, Manager, Nuclear
Production Division
Fort St.- Vrain Nuclear Station
16805 WCR 19 1/2
Platteville, Colorado
80651
L. Singleton, Manager, Quality
Assurance Division
(Same Address)
Colorado Radiation Control Program Director
bec distrib. by RIV:
- RPB
R. D. Martin, RA
- Resident Inspector
- R&SPB
- SectionChief(RPB/A)
- RSB
- SectionChief(RPB/ES)
RIV File
- M. Skow, RPB/A
- RSTS OPERATOR
- MIS System
DRSP
DMB (IE01)
- W. R. Bennett, RPB/A
- w/766
- W. M. McNeill, RPB/A
L