Forwards MORs for Nov 1998 for Songs,Units 2 & 3.Pressurizer Safety Valves Not Challenged for Either Unit
ML20198C334
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/14/1998
From: Scherer A
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198C340 List:
References
NUDOCS 9812220046
Download: ML20198C334 (1)


Text

-..

g p se _ m o,o -

ggsa-Se EDISON s-~~ ~ ras An (IENO.V IN71RM{ TION 4L*' Conynny December 14,1998 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for November 1998 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Southern California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Enclosures 1 and 2 provide the October 1998 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.

If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.

Sincerely, Enclosures

. T.1 E. W. Merschoff, Regional Administrator, NRC Region IV cc:

r J. W. Clifford, NRC Project Manager, San Onofre Units 2 & 3 g

Q J. A. Sloan, NRC Senior Resident inspector, SE.n Onofre Units 2 & 3 J MDOCK 05000361[

9812220046 981214 PDR R

PDR l P. O.11ox 128 San C1cmente. CA 92674 0128 949468-750 t Fax 949463 7515