y TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ot 5 DNl8 NII~ll October 10, 1985 U.S. Nuclear Regulatory Comission Region II Attn:
Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Dear Dr. Grace:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - SEISMIC QUALIFICATION OF B&W EQUIPMENT IN TVA PANELS NCR BLN BLP 8011 - THIRTEENTH INTERIM REPORT i
The subject deficiency was initially reported to NRC-0IE Inspector i
R. W. Wright on November 24, 1980 in accordance with 10 CFR 50.55(e). This was followed by our interim reports dated December 23, 1980 and April 23 and October 28, 1981, February 18, May 18, July 16, and September 24, 1982, February 7 and September 7, 1983, and June 28 and December 17, 1984 and 4
July 2, 1985. Enclosed is our tt.leteenth interim report. We expect to submit our next report no later than six months before fuel loading.
1 If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.
i Very truly yours, 1
TENNESSEE VALLEY AUTHORITY
, N.
. W. Hufham, Ma'n Licensing and Risk Protection Enclosure cc:
Mr. James Taylor, Director (Enclosure)
Office of Inspection and Enforcement U.S Nuclear Regulatory Commission j
Washington, D.C.
20555 Mr. H. B. Barkley (Enclosure) 205 Plant Project Services P.O. Box 10935 Lynchburg, Virginia 24506-0935 Records Center (Enclosure)
Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 i
A S
i\\
An Equal Opportunity Employer g
~
w ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 SEISMIC QUALIFICATION OF B&W EQUIPMENT ON TVA PANELS NCR BLN BLP 8011 10 CFR 50.55(e)
THIRTEENTH INTERIM REPORT Description of Deficiency A number of Babcock and Wilcox (B&W) supplied instruments are intended for installation on TVA's freestanding, open, local instrument panels. Because of imprecise specifications in a TVA procurement document, the instrumentation listed below and supplied by B&W has not been seismically qualified to a response spectra that is compatible with the response spectra for TVA local instrument panels. Consequently, the responsibility for this deficiency is TVA's.
A list of the instruments to be qualified follows:
Type of Device Vendor Vendor ID No.
Differential pressure transmitter Bailey Meter Co.
Type N1BQ86221 Differential pressure transmitter Bailey Meter Co.
Type N2BQ74221 Differential pressure transmitter Bailey Meter Co.
Type N2BQ76221 Differential pressure transmitter Bailey Meter Co.
Type N2BQ85221 Differential pressure transmitter Bailey Meter Co.
Type N2BQ86221 Pressure transmitter Bailey Meter Co.
Type N2KS69221 Indicator meter Bailey Meter Co.
ES-342 Operator station Bailey Meter Co.
TT-10 Interim Progress As reported in our previous responses, the equipment in question was seismically tested to the higher "g" values of the correct response spectra.
The results showed that all equipment is qualified except the N2BQ74221 and N2BQ86221 transmitters and the TT-10 operator station. A contract was set up with Wyle Laboratory to retest the three devices. The results of Wyle's test were scheduled to be submitted to TVA on August 1, 1985. However Wyle did not meet this schedule, and they have rescheduled submission of the test results to October 18, 1985. TVA must evaluate these results and determine if the devices successfully passed the seismic test and are seismically qualified, and take appropriate corrective action if they are not qualified.
TVA will provide a final report on this deficiency upon completion, but no later than six months prior to fuel loading.