Forwards Insp Rept 50-278/85-32 on 850909-13 & Notice of Violation
ML20198C247
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 11/05/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20198C255 List:
References
NUDOCS 8511120030
Download: ML20198C247 (2)


See also: IR 05000278/1985032

Text

__

7

MSIGHktig ogyn, M

  • ,. p* M'og x *I UNITED STATES cy

+1 fg ,T:UCLEAR REOULATCRY COMMISSi6g fled 3 7

g E REGION I __

%[ In f 631 PAR K ' AVENUE g

KING OF PRUS$1 A, PENNSYLV ANI A 19406

!

.....

NOV 051995 ,

Docket No. 50-278 .

'

Philadelphia E1lctric Company s . -

ATTN: Mr. S. L: Daltreff i '

.-

Vice Pre;ident .

-

'

Electric! Production

i

2301 Market Street s

Philadelphia, Pennsylvania 19101 ,

,

-

Gentlemen:

Subject: Inspection Report No. 50-278/85-32 . ,

This refers to the routine inspection conducted by Mr. S. Kucharski of this

office on September 9-13, 1985, at Peach Bottom Atomic Power Station, U_ nit 3,

Delta, Pennsylvania, of activities authorized by NRC License No. DPR-56 and to'

the discussions of our findings held by Mr. Kucharski with Mr. R. S. Fleischmann

and other members of your staff at the conclusion of the inspection. t

Areas examined during this inspection are described in the NRC Region I '

Inspection Report which is e. closed with this letter. Within these areas, the

% ,. inspection consisted of selective examinations of procedures-and representa+.ive

records, interviews with personnel, and observations by the inspector ,

' ' ' Based on the results of this inspection, it appears that certain of your

- activities were not conducted in full compliance with NRC requirements, as set

t - forth in the Notice of Violation, enclosed herewith as Appendix A. These vio-

's

"

lations have been categorized by severity level in accordance with the revised

NRC Enforcement Policy (10 CFR 2, Appendix C) publithed in the Federal Register

Notice (49 FR 8583) dated March 8, 1984. You are required to respond to this

letter and in preparing your response, you should follow the instructions in

Appendix A.

'

The responses directed by this letter and the accompanying Notice are not '

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter _is appreciated. .j

_ Sincerely, '

"s e

,

~

\

w $-

Stewart C. Ebnetsy, Director

Division of React 0c Safety

8511120030 >

,,

'

'h g oI

.

,

~

. .- -

.

. -

/ ,

.

Philadelphia Electric Company 2

/

Enclosures:

1. Appendix A, Notice of Violation

2.

NRC Region I Inspection Report No. 50-278/85-32

cc w/encis: 4

R. S. Fleischmann, Station Superintendent

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner, Jr. , Esquire

A.Electric

J. Pietrofitta, General Manager, Power Production Engineering, Atlantic

Raymond L. Hovis, EsquireEugene J. Bradley, Esquire, Assistant General Cou

Public Document Room (POR) Thomas Magette, Power Plant Siting, Nuclea

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

HRC Resident Inspector

Commonwealth of Pennsylvania