ML20198C247
| ML20198C247 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 11/05/1985 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20198C255 | List: |
| References | |
| NUDOCS 8511120030 | |
| Download: ML20198C247 (2) | |
See also: IR 05000278/1985032
Text
7
__
MSIGHktig ogyn, M
x
UNITED STATES
cy
- I
p* M'og
+1
fg
,T:UCLEAR REOULATCRY COMMISSi6g fled 3
,.
7
g
E
REGION I
__
%[
In
f
631 PAR K ' AVENUE
!
g
KING OF PRUS$1 A, PENNSYLV ANI A 19406
.....
NOV 051995
,
Docket No.
50-278
.
'
Philadelphia E1lctric Company
s
. -
ATTN: Mr. S. L: Daltreff
i
.-
'
-
Vice Pre;ident
.
Electric! Production
'
i
2301 Market Street
s
Philadelphia, Pennsylvania 19101
,
,
Gentlemen:
-
Subject:
Inspection Report No. 50-278/85-32
.
,
This refers to the routine inspection conducted by Mr. S. Kucharski of this
office on September 9-13, 1985, at Peach Bottom Atomic Power Station, U_ nit 3,
Delta, Pennsylvania, of activities authorized by NRC License No. DPR-56 and to'
the discussions of our findings held by Mr. Kucharski with Mr. R. S. Fleischmann
and other members of your staff at the conclusion of the inspection.
t
'
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is e. closed with this letter. Within these areas, the
% ,. inspection consisted of selective examinations of procedures-and representa+.ive
records, interviews with personnel, and observations by the inspector
,
' Based on the results of this inspection, it appears that certain of your
' '
activities were not conducted in full compliance with NRC requirements, as set
-
t -
forth in the Notice of Violation, enclosed herewith as Appendix A.
These vio-
's
lations have been categorized by severity level in accordance with the revised
"
NRC Enforcement Policy (10 CFR 2, Appendix C) publithed in the Federal Register
Notice (49 FR 8583) dated March 8, 1984. You are required to respond to this
letter and in preparing your response, you should follow the instructions in
Appendix A.
The responses directed by this letter and the accompanying Notice are not
'
'
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter _is appreciated.
.j
Sincerely,
'
_"s
e
,
\\
~
$-
w
Stewart C. Ebnetsy, Director
Division of React 0c Safety
8511120030
>
,,
'h
'
g oI
.
,
. .-
-
~
.
/
.
-
,
Philadelphia Electric Company
2
.
/
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report No. 50-278/85-32
cc w/encis:
4
R. S. Fleischmann, Station Superintendent
John S. Kemper, Vice President, Engineering and Research
Troy B. Conner, Jr. , Esquire
A. J. Pietrofitta, General Manager, Power Production Engineering, Atlantic
Electric
Raymond L. Hovis, EsquireEugene J. Bradley, Esquire, Assistant General Cou
Public Document Room (POR) Thomas Magette, Power Plant Siting, Nuclea
local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
HRC Resident Inspector
Commonwealth of Pennsylvania
-