_.-_-___--___ - -
l GPU Nuclear. inc.
(
U S Route #9 South NUCLEAR
?**'0"'** * *
- Forked River.W J731-0388 Tel 609-9714000 December 29,1997 6730-97-2278 U. S. Nuclear Regulatory Commission Attention: Document ControlDesk Washington,DC 20555 Gentlemen:
Subject:
Oyster Creek Nuclear Generating Station (OCNGS)
Docket No. 50-219/ License No. DPR 16 Long Range Planning Program (LRPP)
Annual Update ofIntegrated Schedule "ABC" Projects Listing - December,1997 Pursuant to condition 2.C.(10) of dperating License DPR-16, GPU Nuclear has implemented the Long Range Planning Program for OCNGS. As required by Section V.A of the Plan, the following attacturents are submitted to provide the annual project list update:
1.
Attachment A contains a new project list of Category / B and C projects, annotated by an asterisk (*) to identify nee projects.
Completed projects have been removed from the schedule Itang. Also noted by a double asterisk (") are budget activity numbering changes.
2.
Attachment B contains a summary of Category A, B, and C prcject-which have been completed, deleted, defmed, changed in scope.
Category A and B projects which have had schedule changes are provided with explanations, as appropriate.
i P
PDR (1%.)\\
9001070207 9712R9
,m PDR ADOCK 05000219
.x 1
jj U
a i
11
.l.lR, i.lI!Il0. 0.111.
c
f 6730 2278-
- Page 2 Pursuant to the LRPP for Oyst r Creek, it will be assumed tiat you are in agreement with.
~ the actud Category B changes above if you do not respond to this submitts.1 within 15 days "ofreceipt i
Sincerely, y __
4..
Michael B. Roche 3
Vice President and Director Oyster Creek i
d cc:
Director, Project Directorate I-4 Oyster Creek NRC Project Manager Senior NRC Resident Inspector, OCNGS J
h 4
i 4
Y-.
k -
O a
a 4
i ATTACHMENT A PROJECT LISTING INTEGRATED SCHEDULE ANNUAL UPDATE (DECEMBER 1997) s
.m E
ABC Classifications a)
Meet NRC Requirements (NRR)- Activities that a) must be carried out to ful611 specific NRC requirements or b) have been committed to the NRC by the company or c) are such that if not accomplished would result in an NRC non-compliance even though the specific activity is not required by the NRC.
b)
Meet Environmental Requirements (ERR)- Activities that a) are specifically required by environmental regulatory agencies (State & Federal) or b) have been committed to environmental agencies by the Company or c) are such that if not accomplished would result in regulatory non-compliance even though the specitic activity is not required by an environmental regulatory agency.
c)
Meet other Requirements (ORR)- Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, court order er lawsuit settlement, or other guidance to which the Company is committed or if not accomplished would result in a violation of that ordinance, code or guidance, court order, etc.
d)
Inglease Safety Margins (ISM)- Activities that, ifimplemented, will improve nuclear plant or personnel safety but are neither required by regulatory compliance nor required by safety regulations, codes or guidance.
e)
Rtcmse Environmental EfTects (E)- Activities that, ifimplemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes or guidance, f)
Imorove Radiological Conditions (RAD)- Activities that,ifimplemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste control / reduction be. are neither required for regulatory compliance not required by radiological regulations, codes or guidance.
s g)
Maintain Reliability /Capapility (MRC)- Activities that, ifimplemented, will maintain power production at existing levels by preventing deterioration of plant systems or equipment. Includes activities in' response to national codes and standards, insurance policies, equipment vendor specifications or nuclear industry high unavailability dat without which the plant could not operate pmdently.
t h)
Imorove Reliabilitv/Caoability (REL)-- Activities that,ifimplemented, will increase the power generation by improving availability or capacity factor to maximize energy output.
i)
Improve Operational EfTectiveness (IOE)- Activities that, ifimplemented, will improve staff e 1iciency or provide a direct economic payback in terms of reduced 5
operating / maintenance costs.
a
ABC Classifications (continued) j)
- Improve Personnel Facilities (FAC)- Activities that, ifimplemented, will improve working conditions and the usefulness of personnel facilities.
k)
Etovide Contingency /Bla@gt (CUI)- Activities that, ifimplemented, will provide management flexibility to respond I a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair e.inor items essential to support routine operations.
s
{
1) improves Heat Rate Performance (HKP)- Activities that, ifimplemented, will increase power production by enhancing the heat rate efficiency.
m)
General Workinn Conditionj (GWC)- Activities, tc.ols and equipment that if implemented will improve working conditions, but v/ill not demonstrate a direct economic payback.
\\
h 4
ATTACHMENT B OYSTER CREEK NUCLEAR GENERATING STATION NRC INTEGRATED SCHEDULE ANNUAL UPDATE CATEGORY "A" PROJECTS -
None t
)
0
/-
c-
- +..
CATEGORY "B" PROJECTS Additions:
i As denoted by
- next to the Project Title in Attachment A Completions:
- None
- Schedule Change None s
o d
a 4
to-N4
.m-..m__m
i CATEGORY "C" PROJECTS Additions:
As denoted by
- next to the Project Title in Attaclunent A Completions:
402980 Confinuration Management - DBD C2-97 Deletions:
312000 Spent Fuel Trans to Interim Storage 312600 Valve Reliability & Maintenance - 17R & 18R Other Changes
-32696G Outage ISI This project has been combined with 320003 for Cycle 17R,18R and 19R.
408957 Valve Reolacement1 Retirement - 17R This Project has been changed to 400023 - Rx Safety & EMRV Exchange-17R.
1 e
I t
y t
CDEFK.
.'P R O J'E C T
'L I S T.I N G O Y S T E R"_'
r LEGEND NRC-I N T E 'i R A T E D.
S C H E D U L,E"
-.___c e..'NEW PROJECTS:..
L**u.BA NUMBER CHANGE-CATEGORY'*BC PROJECTS
- STATUS' AS OF.12/22/1997 '
. SORT.BY CATEGORY / CYCLE /BAl CYCLE /
CLASSIFICATION-OB?
BA' DESCRIPTION
~
YEARS NUMEER
.............a..............
........._....._...........__u................_..................... ___....
16 NRR:
1..403042 J THERMO-LAG FIRE BARPIER-MODIFICATIONS REPAIR'TSI THERMO-LAG FIRE BARRIERS IN
' THE 480V SWGR ROOM TO MEET THE APPROPRIATE FIRE REQUIREMENTS 16 NRR-2 '403092
- SEISMIC. QUALIFICATION MODS' PHASE II
'DGB' DW - RB. TBM IMPLEMElfr SQUG MODS TO CORE SPRAY MAIN PUMPS,' CORE SPRAY BOOSTER PUMP 2A, CONT SPRAY PUMPS 1B,1C & ID & RBEDT PLATFORM 1 3' 320005
- - RX. VESSEL INTERNAL INSPECTICN -17R 17R-NRR 119' VISUAL INSP. OF INTERNAL ~ COMPONENTS AND i
SURFACES AS REQUIRED BY ASME'& GPUN,'&
- LPRM HOUSING REFURB, CS PIPE INSPECTION 17R. OUTAGE ISI & RCS AUGMENTED IGSCC INS 17R NRR
~
i 4 '320016 ALL i
- INSdECT VARIOUS COMPONENTS TO SECTIION
- l C
XI REQUIREMENTS & INSPECT PIPING WELDS
,j
- (MANUAL)"PER NUREG 0313 REV. 2 1
5 ;400017 RWCU LOCA DETECT & ISOLATE (SIL604)'
17R NRR INSTALL TEMPERATURE SENSOKS AND ASSOC IDGIC TO ISOLATE THE StWCU SYSTEM FOR PIPE BREAK IDCA OUTSIDE DRYWELL 17R MRC G 403048 ECCS SUCTION STRAINERS TOR INSTALL NEW 3UCTION STRAINERS TO THE ECCS SYSTEM IN THE TORUS AS RECOMM.
BY NRC, CONTING. ON ACCEPT. PESIGN OITTAGE ISI & AUG IOSCC INSP - 1sR 18R NRR 4
'.7 320003 g.
A INSPECT VARIOUS COMPONENTS TO SECTION XI REQUIREMENTS & INSPECT PIPING WELDS PER NUREG,0313 REQUIREMENTS.
e a
=
f y
2
.y OYSTFR CREEK P "1 O J E C T LISTING
~ LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - + - -
' ** 'EA NUMBER CHANGE CATEGORY
- B' PROJECTS SORT BY CATEGO2t/ CYCLE /BA STATJS AS OF 12/22/1997 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION
'NUM3ER' YEARS
...............-..............-.............-.......--...............-..............+-...............................--..............
8 320005 RX. VESSEL INTERNAL INSPECTION -189 18R NRR 119*
VISUAL INSPECTION cF SELECTED INTERNAL cot 4PONENTS AND SURFACES AS REQUIRED 3Y ASME CODES 9 320011 GENEPIC LETTER 96-06 MODFICATIONS 18R NRR
~
MODIFY PIPING IN FIVE DRYWELL PENETRATIONS TO RESOLVE OVER-PRESSURE CONCERNS 10 326216 RX. VESSEL BELTLINE INSPECTION 18R NRR 119 (TT ACCESSIBLE WELD SEAMS IN THE RPV BELTLINE REGION. INSPECTIONS WILL BE DONE RMOTELY. ASME SECT. XI REQUIREMENTS 11 328030 CONTROL ROOM HUMAN FACTORS DESIGN REVIEW 18E NRR CR R.' PAINT, REFURBISH & RELABEL CR PANELS 1R THRU 10R,6XR,11XR,12R,12XR,14R,14XR, 16R AND 11F,9XR&11R. NUREG 0737 SUP 1 12 400018
' ANTICIPATORY SCRAM BYPASS IDGIC IMPROVEM 18R IOE CR TB REPLACE 4 ANTICIPATORY SCRAM AUTOMATIC BYPAS?: PRESS. SWITCHES WITH MORE PRECISE SWITCHES.
13 403042 THERMO-LAG FIRE BARRIER MODIFICATIONS 13R NRR REPAIR THE REMAINING TSI THERMO. LAG FIRE BARRIERS TO MEET THE APPROPRIATE FIRE REQUIREMENTS 14 403092 SEISMIC QUALIFICATICN MODS - PHASE II 18R NRR DGB DW RB TBM IMPLEMENT SOUG MODIFICATIONS AS NECESSARY 4
.4
--a.
ru O Y.S T E R~ iC R.E E K PROJECT -LISTING
-z-i LEbEND'
-t N R.C
. INTEGRATED SCHEDULE
- "'.g
~*
.NEN PROJECTS-4
._ee.2BA NUMBER CHANGE s
CATEGORY
'B' PRCL'ECTS
' SORT BI'CATEGORT/ CYCLE /BA'-
STATUS AS'OF 12/22/19971
-CBS4 EA DESCRIPTION CYCLE /--
CLASSIFICATION-YEARS 3....' NUMBER.-
15 D NA ;
SEVERE ACCIDENT MANAGEMENT PROGRAM 18R NRR'
' GENERIC LETTER 88-20.
DEVEIDP AND IMPLEMENT SEVERE ACCIDENT GUIDELINES s16 320003.
OUTACE'IST & AUG-IGSCC INSP - 19R 19R
- NRP ALL' INSFECT VARIOUS COMPONENTS TO.SECTION
.XI REQUIREMEYrS & 2NSPEr"r PIPING WELDS
' PER NURE3 0313 REQUIRE, TENTS.
RX. VE'SEL INTERNAL INSPECfION -19R 19R NRR'-
- 17 '320005-
.119'
]
VISUAL INSPECTION'OF SELECTED INTERNAL COMPONENTS AND SURFA"ES AS REQUIRED BY ASME CODES t
.~
l' r
k f
=
}..
.(
t Jr I
i r
m 4
r
+
y
-r e-
+
w 4wr--
w y
W e *,e m=
4-i e
+r
m..
~.
..m 0:Y S T E R EC R E'E K P R O J E C T' IfI'S T I D G
, _...J
............................L.............................
' ~
G~
'y
......J N R C-IN'TEGRATED S,C H E D U L Ec'
- - NEN PROJECTS-BA'. NUMBER CHANGE:
, ' f.l
~
CATEGORY
- C' PROJECTS SORT.BY CATEGGRY/ CYCLE /BA STATUS AS OF 12/22/1997!
-.OBS 1BA-
' DESCRIPTION CYCLE /:
CLASSIFICATION-i NUMBER YEARS SPENT FUEL POOL CLEANUP 17 REL
<17 -328404 119'
. COMPACT MATERIAL IN THE SPEh? FUEL ~ POOL INTO SHIPPING LINERS f
'18 400009-
- DEPLETED' ZINC INJECTION 17.
-RAD s
INSTALL A SYSTEM TO II JECT DEPLETED ZINC INTO THE FEEINATrit STREAh.
INJECTION OF 7INC IS TO REDUCE SOURCE TEPM BUIIT-UP
. i.
.19 -31'2600
.CRD HCU REBUILD - 17R 17R' MRC PERFORM CORRECTIVE MAI!rrhNANCE ON CRD HYDRAULIC CONTROL UNITS-120 312600 SCAFFOLD & INSULATION - 17R 17R MRC b
INSTALI: SCAFFOLD TO SUPPORT PPtOJtCTS &
.[
MAINTENANCE DURING THE OUTAGE 7
CONSENSA?E DEMIN UNDER DRAIN REPIJ.3 MEN 17R REL 21 '320008
.TBM -
.REPL. NEVA. CLOG GCREEN L OCREEN SUPPORT
' 2'y
-REPLACE WITH W1 MYSTEM OF SS LATERAL IN EPOXY & SAND.
- EGATE IN 7 VESSELS 22 320010 REACTOR DISASSEMBL. LFASSEMBLY -~17R 17R.
MFC d-I19' TASKS ASSOCIATED WITH REACTOR DISASSEMBLY AND REASSEMBLY AND SUPPCRTING AC'TIVITIES 17R TURBINE OVERHAUL PROJECT 17R
,MRC
. 23 320012 y
CBAY TOP
' INSPECT MISCRLLANEOUS 1URBINE RELATED, 1i COMPONENTS.FOR NHL REQUIREMENTS AND-MANUFACTURER SUGGESTION i
'h
.i t --
O a.
OYSTER CREEK PROJECT LISTINO LEGEND NRC INTEGRATED SCHEDULE
~~------~~--------------------------~~------
NEM PROJECTS
- 'BA NUMBE2 CHANGE CATEGORY
'C' PROJECTS STATUS AS OF 12/22/1997 SORT BY CATEGORY / CYCLE /BA I
CYCLE /
CLASSIFICATION DESCRIPTION OBS BA YEARS NUMBER GL 89-10 ISOLATION CONDENSER LM IC PdODIF 17R NRR 24 320017 REPLACE SIX RELAYS JM EACH ISOLATION CONDENSER SYSTEM TO SUPPORT 89-10 EVALUATIONS 25 328378 PIPS NALL THINNING - 17R 17R ISM REMOVE INSULATION,FREP SURF?.CES &
PERFORM UT ON SELECTED PIPING SYSTEMS.
POSSIBLE REPLACEMENT OF FITTINGS / PIPING GENERIC LLTTER 89-10 17R MODIFICATIONS 17R ISM 26 400001 ALL PERFORM MODIFICATIONS TO SUPPORT GENERIC LETTER 89-10 REQUIREMENTS IN 17R.
17R RRR' RX SAFETY & EMRV EXCHANGE - 17R 27 400023 DW51 REMOVE AND RE-INSTALL CEVEN SAFETIES AND
'TNO EMRVS 1
18 REL SPENT FUEL POOL CLEANUP l
28 328404 i
119' SHIP LINERS FROM SPENT FUEL POOL 29 312600 CRD HCU REBUILD - 18R 18R MRC PEROFRM CORRECTIVE MAINTENANCE ON CRD HYDRAULIC CONTROL UNITS 30 312600 SCAFFOLD & INSULATION - 18R 18R MRC INSTALL SCAFFOLD TO SUPPORT PROJECTS &
MAINTENANCE DURING THE OUTAGE 4
+
a 1
y OLY.S T E C'
~ CREEK PROJECT-L'I S T I C Gi
- k.
1 n
~. LEGEND-4 N R' C INTEGRA'TED S C H E D U L E.-
p-
.*- 1NEW PROJECTS e*; BA NUMBE3 CHANGE-
-CATEGORY
'C' PROJECTS 3 SORT BY CATEGORY / CYCLE /BAo STATUS AS OF;12/22/19971 t___..
10BS' J BA.
DESCRIPTION CYCLE /
CIASSIFICATION NUMBER-YEAoS-
. REACTOR DISASSEMBLY / REASSEMBLY - 18R 18R MRC
.i 31)f320010'. **'
l 119':
TASKS ASSOCIATED NITH REAC'MR
- DISASSEMBLY AND REASSEMBLY AND i -
a-SUPPORTIN(J ACTIVITIES t
. TURBINE INSP.-18R 18R MRC-
' 323LO3 '
- 32
+
TB '
. INSPECT HP' AND LPA AND OTHER IURBINE RELATED COMPONENTS FOR NML NML' REQUIREMENTS. AND MANUF. SUGGESTION 33 '328378 PIPE NALL THINNING - 18R 18R a
REMOVE INSULATION, PREP SURFACES &
PERFORM UT ON SELECTED PIPING SYSTEMS.
POSSIBLE REPIACEMENT OF FITTINGS / PIPING 34 408957 VALVE REPLACEMENT / RETIREMENT-18R 18R REL
'RB
'TB CBAY DN s
' REPLACE SELECTED VALVES ID2NTIFIED AS HAVING DEFICIENCIES t
35- '312600
. SCAFFOLD & IRSULATION. 19R 19R MRC-
~
INSTALL' SCAFFOLD TO SUPPORT. PROJECTS &
a MAINTENANCE DURING THE OUTAGE 36 312600 CRD HCU REBUILD - 19R-19R MRC
'PERPORM' CORRECTIVE MAINTENANCE ON CRD HCU REACTOR DISASSEMBLY / REASSEMBLY - 19R 19R MRC 320010 119'-
TASKS ASSOCIATED WITH REACTOR DISASSEMBLY AND REASSEMBLY AND SUPPORTING ACTIVITIES n
3 i-7-
f
,--p--
g 4 Y
.f-r r
p
,a w<,w
%-r' rf*-
---rf w
-OYSTER
.CREEE PROJECT-L I S.T I IJ G LEGEND 4
~
SCHEDULE
-N R C.
INTEGRATED-NEN PROJL..S
-** 'BA NUMBER CHANGE.
CATEGORY
'C' PROJECTS STATUS'AS'OF 12/22/1997 SORT BY CATEGORY / CYCLE /BA-
- OSS' BA-
- DESCRIPTION CYCLE /-
CIASSIFICATION,
w,esER-YEARS VALVE REPLACEMENT / RETIREMENT-19R' 19R' REL 38' 408957 RB - TB CBAY DW
- REPLACE SELECTED VALVES IDENTIFIED AS HAVING DEFICIENCTES
~
- 33. 328370-
. VESSEL & INTERNALS PROJECT (BWR VIP) 94-99
..NRR EVALUATE THE REACTOR AND INTERNALS FOR POTENTIAL CRACKING AND DEVEIDP METHODS FOR INSPECTION / MITIGATION /REPATR 40' 409307' REPLICATOR SIMULATOR MODS - 1997/99 97/99 NRR UPGRADE THE SIMULATOR TO MATCH PLANT MODS AS APPLICABLE i