ML20198B515
| ML20198B515 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/21/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20198B521 | List: |
| References | |
| NUDOCS 8511060511 | |
| Download: ML20198B515 (2) | |
See also: IR 05000413/1985041
Text
O ek
x.
.
.
O
OCT 211985
Duke Po
Company
ATT .
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NOS. 50-413/85-41 AND 50-414/85-40
On August 26 - September 25, 1985, NRC inspected activities authorized by NRC
Operating License No. NPF-35 and Construction Permit No. CPPR-117 for your
Catawba facility.
At the conclusion of the inspection, the findings were
discussed with those members of your staff identified in the enclosed inspection
report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of tin inspection, no violations or deviations were identified.
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL SIGNED Oy
VIRGIL L PROWNLEE
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Disision of Reactor Projects
j
Enclosure:
i
Inspection Report Nos. 50-413/85-41
i
and 0-414/85-40
i
i
w/ c1:
!
. Dick, Vica President - Construction
.
i
. W. Hampton, Station Manager
'
.
l
bec w/ enc 1:
(See page 2)
,
{
!
!
l
i
>
,
. . . ,
OCT C 1 1985
.
'
Duke Power Company
2
bcc w/ encl:
G. Johnson, ELD
K. N. Jabbcur, NRR
Document Control Desk
State of South Carolina
.
RIIf'.h
RII
J
CB
r:bhg
HCDapce
10// 7/85
10/l1/85