ML20198B501
| ML20198B501 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 10/22/1985 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20198B505 | List: |
| References | |
| NUDOCS 8511060507 | |
| Download: ML20198B501 (2) | |
See also: IR 05000483/1985001
Text
DC.$} RSb (880&
'
..
. . .
,
i
OCT 2 21985
Docket No. 50-483
Union Electric Company
ATTN: Mr. Dorald F. Schnell
Vice President - Nuclear
Post Office Eox 149 - Mail Code 400
St. Louis, M0 63166
Gentlemen:
.
!
This refers to the NRC's Systematic Assessment of Licensee Performance (SALP) 5
Board Report for the Callaway Nuclear Plant, our meeting of August 28, 1985,
which discussed in detail the contents of the report, and your written comments
dated September 11, 1985, relative to the report.
We have reviewed and evaluated your comments and have reached the conclusions
presented in the Appendix to this letter.
Based on our discussions during the meeting on August 28, 1985, and further
reiterated in your letter of response, certain portions of the SALP Board
Report have been modified as described in the attached Errata Sheet.
Corrected page(s) are included herein to update your copy of the SALP Board
Report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter with the
referenced attachments, will be placed in the NRJ's Public Document Room.
No reply to this letter is required; however, shoW.d you have questions on the
basis of conclusions reached by NRC, or if you need clarification on the
changes made to the SALP Report, please let us know and we will be pleased to
discuss them with you.
.
Sincerely,
Orl0 nd @-# kl
l
4
J.: es G. M;pler
James G. Keppler
Regional Administrator
Attachments:
1.
Appendix to SALP 5 Board
i
Report No. 50-483/85001
2.
Errata Sheet
.
'
3.
Corrected Page(s) to SALP
Board Report
See Attached List For Distribution
-
-
-
r
',
$. .
00T 2 2 085
Union Electric Company
2
Distribution
cc w/ attachments:
W. P. Weber, Manager, Nuclear
Construction
S. E. Miltenberger, Plant Manager
R. L. Powers, Assistant Manager
Quality Assurance
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Region IV
K. Drey
Chris R. Rogers, P.E.
Utility Division, Missouri
Public Service Commission
SNUPPS
J. M. Taylor, Director, IE
H. R. Denton, Director, NRR
Regional Administrators
RI, RII, RIV, RV
N. J. Palladino, Chairman
J. K. Asselstine, Commissioner
F. M. Bernthal, Commissioner
L. W. Zech, Commissioner
T. Alexion, NRR Project Manager
H. L. Thompson, Jr., NRR
J. Axelrad, IE
RIII PRR
RIII SGA
State Liaiscn Officer, State
of Missouri
INP0
RIII
RIII
RIII
RIII
RIII
RIII
'Oh
JFf
MV
IELc) V
h\\
Nor()d Pius
,
,at on/pg
Schweibinz
Suerpann
Hehjl
hris otimos
to \\d
IG' } 7- 6 n f f
On
(s, I
n
periello
9(
D vis
K6plg
v
0/17/85
g
'ho
in All
,
'
s