ML20198B501

From kanterella
Jump to navigation Jump to search
Forwards App to SALP Rept 50-483/85-01,errata Sheet & Corrected Sections of Rept
ML20198B501
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/22/1985
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20198B505 List:
References
NUDOCS 8511060507
Download: ML20198B501 (2)


See also: IR 05000483/1985001

Text

DC.$} RSb (880&

'

..

. . .

,

i

OCT 2 21985

Docket No. 50-483

Union Electric Company

ATTN: Mr. Dorald F. Schnell

Vice President - Nuclear

Post Office Eox 149 - Mail Code 400

St. Louis, M0 63166

Gentlemen:

.

!

This refers to the NRC's Systematic Assessment of Licensee Performance (SALP) 5

Board Report for the Callaway Nuclear Plant, our meeting of August 28, 1985,

which discussed in detail the contents of the report, and your written comments

dated September 11, 1985, relative to the report.

We have reviewed and evaluated your comments and have reached the conclusions

presented in the Appendix to this letter.

Based on our discussions during the meeting on August 28, 1985, and further

reiterated in your letter of response, certain portions of the SALP Board

Report have been modified as described in the attached Errata Sheet.

Corrected page(s) are included herein to update your copy of the SALP Board

Report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter with the

referenced attachments, will be placed in the NRJ's Public Document Room.

No reply to this letter is required; however, shoW.d you have questions on the

basis of conclusions reached by NRC, or if you need clarification on the

changes made to the SALP Report, please let us know and we will be pleased to

discuss them with you.

.

Sincerely,

Orl0 nd @-# kl

l

4

J.: es G. M;pler

James G. Keppler

Regional Administrator

Attachments:

1.

Appendix to SALP 5 Board

i

Report No. 50-483/85001

2.

Errata Sheet

.

'

3.

Corrected Page(s) to SALP

Board Report

See Attached List For Distribution

-

-

-

r

',

$. .

00T 2 2 085

Union Electric Company

2

Distribution

cc w/ attachments:

W. P. Weber, Manager, Nuclear

Construction

S. E. Miltenberger, Plant Manager

R. L. Powers, Assistant Manager

Quality Assurance

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Region IV

K. Drey

Chris R. Rogers, P.E.

Utility Division, Missouri

Public Service Commission

SNUPPS

J. M. Taylor, Director, IE

H. R. Denton, Director, NRR

Regional Administrators

RI, RII, RIV, RV

N. J. Palladino, Chairman

J. K. Asselstine, Commissioner

F. M. Bernthal, Commissioner

L. W. Zech, Commissioner

T. Alexion, NRR Project Manager

H. L. Thompson, Jr., NRR

J. Axelrad, IE

RIII PRR

RIII SGA

State Liaiscn Officer, State

of Missouri

INP0

RIII

RIII

RIII

RIII

RIII

RIII

'Oh

JFf

MV

IELc) V

h\\

Nor()d Pius

,

,at on/pg

Schweibinz

Suerpann

Hehjl

hris otimos

to \\d

IG' } 7- 6 n f f

On

(s, I

n

periello

9(

D vis

K6plg

v

0/17/85

g

'ho

in All

,

'

s