ML20197K227

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Nov 1998 for CPSES, Units 1 & 2.No Failures of Challenges to PORVs of SVs Occurred During Reporting Period
ML20197K227
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/11/1998
From: Terry C, Walker R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20197K233 List:
References
TXX-98261, NUDOCS 9812160125
Download: ML20197K227 (1)


Text

.

b 4

E-7UELECTRIC Log # TXX 98261 File # 10010.2 Ref. # 10CFR50.36 c.14.c. T.ny Senior 11ce President

& PrincipalNuclear Of)icer 9g g 3999 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i

l

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50 445 AND 50-446 MONTHLY OPERATING REPORT FOR NOVEMBER 1998 Attached is the Monthly Operating Report for November,1998, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the CPSES Units 1 and 2 Operating License Nos. NPF 87 and NPF 89, respectively. During this reporting period, there have been no failures or challenges to the Power Operated Relief Valves or Safety Valves for CPSES Unit 1 and Unit 2.

This communication contains no new licensing basis commitments regarding CPSES i

Units 1 and 2.

Should you have any questions, please contact Douglas W. Snow at j

(254).897 8448.

Sincerel

b. $' y C. L. Terry

\\

By:

M 9812160125 981211

' R.D. Walker f

ADOCK O 5

i Regulatory Affairs Manager DWS/dws 1[~

<}

Attachment c-Mr. E. W. Herschoff, Region IV Mr. J. I. Tapia, Region IV Mr. T.'J. Polich, NRR Resident Inspectors COMANCllE PEAK STEAM ELECTRIC STATION P.O. Box 1002 Glen Rose, Texas 76043 1002