Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K9401999-10-0606 October 1999 Submits Safeguards Event Log for Calendar Quarter Ending 990930,IAW 10CFR73.71.No Safeguards Events Occurred ML20210R9181999-08-13013 August 1999 Forwards Insp Rept 50-409/99-02 on 990726-28.No Violations Noted ML20210F3651999-07-0909 July 1999 Submits Safeguards Event Log for Calendar Quarter Ending 990630,IAW 10CFR73.71 & LACBWR Security Plan ML20196D5161999-06-21021 June 1999 Discusses Rev 19 to Various Portions of Lacrosse Boiling Water Reactor Emergency Plan Submitted Under Provisions of 10CFR50.54(q).NRC Initial Review of Changes Will Be Subject to Insp to Confirm No Decrease in Effectiveness of Plan ML20207G1991999-06-0303 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Reorganization Chart Encl ML20206R9211999-05-10010 May 1999 Forwards Annual Financial Rept & Certified Financial Statements for DPC for Years 1998 & 1997,IAW 10CFR50.71(b). Util Will Forward 1998 Annual Rept as Soon as Rept Is Completed ML20206H6771999-05-0505 May 1999 Forwards Insp Rept 50-409/99-01 on 990414-16.No Violation Noted.Overall Performance During Decommissioning/Safe Storage Activities Was Good ML20206J3671999-04-30030 April 1999 Forwards Rev 13 to QA Program Description, IAW 10CFR50.54(a)(3) & 50.4(b)(7).Changes in Rev 13 Listed ML20205R4261999-04-0808 April 1999 Submits Ltr for Calendar Quarter Ending 990331 IAW 10CFR73.71, Reporting of Safeguards Events. No Safeguards Events Occurred During Quarter ML20204F8291999-03-0909 March 1999 Forwards Annual Rept on Status of Decommissioning Funding for La Crosse Boiling Water Reactor,Iaw 10CFR50.75(f)(1) ML20207C2661999-02-19019 February 1999 Forwards Radioactive Effluent Rept & Radiological Monitoring Rept for 1998 for Lacbwr. Lacbwr,Pcp & ODCM, Encl ML20207A9431999-02-11011 February 1999 Forwards Revised Pages to LACBWR Decommissioning Plan. Each Page with Change Will Have Bar in right-hand Margin to Designate Location of Change ML20198E4371998-12-17017 December 1998 Forwards Insp Rept 50-409/98-05 on 981207-10.No Violations Noted.Activities in Areas of Facility Mgt & Control,Spent Fuel Safety & Radiological Safety Were Examined ML20196A8921998-11-23023 November 1998 Forwards Rev 12 to LACBWR QA Program Description ML20155H4221998-11-0303 November 1998 Ack Receipt of Re Insp Rept 50-409/98-02,in Response to Transmitting Predecisional EC Summary & Exercise of Enforcement Discretion Re Compliance with Maint Rule ML20154K0191998-10-13013 October 1998 Forwards Insp Rept 50-409/98-04 on 980921-22.No Violations Noted ML20154P4351998-10-13013 October 1998 Responds to Re Insp Rept 50-409/98-02 & Refers to C/As Taken to Bring LACBWR Into Compliance with Maint Rule IR 05000409/19980021998-09-17017 September 1998 Discusses Predecisional Enforcement Conference Held on 980630 Re Insp Rept 50-409/98-02 & Exercise of Enforcement Discretion.Two Apparent Violations,Involving Failure to Implement Key Aspects of Maintenace Rule,Identified ML20151Z6501998-09-17017 September 1998 Discusses Predecisional Enforcement Conference Held on 980630 Re Insp Rept 50-409/98-02 & Exercise of Enforcement Discretion.Two Apparent Violations,Involving Failure to Implement Key Aspects of Maintenace Rule,Identified ML20153F7431998-09-14014 September 1998 Informs That Changes Made in Rev 12 Are Adminstrative in Nature & Do Not Result in Reduction in Commitment to Safety & Reliably Operate LACBWR in Safstor Condition,Per 980909 Telcon with NRC ML20237D8861998-08-21021 August 1998 Advises That Rev 18 to Portions of Emergency Plan Do Not Decrease Effectiveness of Plan & Plan Continues to Meet Relevant Stds of 10CFR50.47(b) & Therefore,Nrc Approval Not Required ML20237B9181998-08-17017 August 1998 Forwards Insp Rept 50-409/98-03 on 980811-12.No Violations Were Noted.Insp Included Review of Physical Security Plan for LACBWR ML20236W8111998-08-0303 August 1998 Forwards Summary of Decommissioning Insp Plan for Oct 1998 - Apr 1999,for Info.Plan Will Be Updated Approx Twice Yearly & May Be Revised at Any Time Based on Future Insp Findings, Events & Resource Availability ML20237E2631998-07-15015 July 1998 Forwards Rev 12 to QA Program Description. Page Change Locations Indicated by Bold Bar in right-hand Margin ML20236K7091998-07-0606 July 1998 Forwards Official Transcript Proceedings from 980513,public Meeting Held in Viroqua,Wi on Decommissioning of Lacrosse Boiling Water Reactor.Pen & Ink Changes Made to Original Transcript to Correct Errors & to Clarify Abbreviations ML20249A8331998-06-15015 June 1998 Expresses Appreciation for Support Provided for Recent Meeting Held at Viroqua High School - Middle School Complex on Decommissioning of Lacrosse Boiling Water Reactor ML20248M0461998-06-0909 June 1998 Expresses Appreciation for Support Provided for Recent Public Meeting Held at Viroqua High School on Decommissioning of LACBWR ML20216B9311998-05-0707 May 1998 Forwards Insp Rept 50-409/98-01 on 980420-0423.No Violations Noted ML20217K7121998-03-27027 March 1998 Forwards Rev 18 to LACBWR Emergency Plan.Bar Lines in right- Hand Margins Note Changes.Description of Each Change & Reason for Change Is Included as Cover Pages to Plan Rev ML20203K2041998-02-27027 February 1998 Forwards Summary of Decommissioning Insp Plan for Remainder of FY1998.Plan Will Be Updated Approx Twice Each Yr & May Be Revised Any Time Based on Future Insp Findings,Events, Resource Availabilty,Etc ML20202J4261998-02-16016 February 1998 Forwards Revised LACBWR Decommissioning Plan & Revised LACBWR Initial Site Characterization Survey for Safstor. Both Documents Revised Jan 1998 ML20202J0381998-02-10010 February 1998 Forwards Revised LACBWR Decommissioning Plan. Each Page W/Change Will Have Bar in right-hand Margin to Designate Location of Change ML20199A9351998-01-19019 January 1998 Forwards Insp Rept 50-409/97-01 on 971209-11 & 980107.No Violations Noted.Activities in Areas of Facility Mgt, Decommissioning Support,Spent Fuel Safety & Radiological Safety Were Examined During Insp ML20199J4111997-11-21021 November 1997 Informs That NRC Regional Oversight Responsibilities for LACBWR Has Been Transferred to Region III Div of Nuclear Matls Safety.Effective 971105 D Nelson Became Region III Point of Contact for Routine LACBWR Insp Matters ML20198R9721997-10-24024 October 1997 Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encl Withheld ML20149G1311997-07-10010 July 1997 Submits Ltr Re Quarterly Submittal of Safeguards Events Log for Quarter Ending 970630.No Safeguards Events During Past Quarter ML20148S9131997-07-0303 July 1997 Forwards Annual Financial Rept & Certified Financial Statements for Dairyland Power Cooperative for 1996 & 1995 ML20141H5581997-05-20020 May 1997 Discusses Change in Ofc as of 970520.Project Mgt for Facility BWR Will Be Assumed by Pw Harris.Site Visit Will Be Arranged Convenient to Both Staff & Scheduled Activities ML20141B7521997-05-0909 May 1997 Forwards TS Re Changes to LACBWR Controlling Documents ML20138H8011997-04-29029 April 1997 Forwards Corrected Page to Safety Evaluation,Issued by NRC, by Ltr Dtd 970425.W/o Ltr ML20138B6821997-04-25025 April 1997 Forwards Corrected Page 8 of SE for Amend 69 to La Crosse Boiling Water Reactor License ML20138A6431997-04-15015 April 1997 Forwards Rev 11 to LACBWR QA Program Description ML20137R7651997-04-11011 April 1997 Forwards Safety Evaluation Approving Changes to QAP Description ML20138B7261997-04-10010 April 1997 Submits Ltr for Calendar Quarter Ending 970331,IAW 10CFR73.71 & LACBWR Security Plan ML20134H1841997-01-31031 January 1997 Submits Quarterly Safeguards Event Log Re License DPR-45 ML20133A3721996-12-16016 December 1996 Forwards Rev 17 to LACBWR Emergency Plan ML20132F8601996-12-10010 December 1996 Forwards Revised LACBWR Decommissioning Plan. Each Page W/ Change Will Have Bar in right-hand Margin to Designate Location of Change ML20134M2421996-11-0505 November 1996 Forwards Rev 11 to QA Program Description, Clarifying Section I, Organization Paragraph 7.d Revised to Assure Majority of SRC Members Be Degreed Individuals ML20149F2461994-08-0202 August 1994 Ack Receipt of 10CFR50.54(a) Submittal Dtd 940620,which Incorporates Changes in Quality Assurance Program Description ML20058P1281993-12-0909 December 1993 Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encls Withheld (Ref 10CFR2.790(d)) 1999-08-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K9401999-10-0606 October 1999 Submits Safeguards Event Log for Calendar Quarter Ending 990930,IAW 10CFR73.71.No Safeguards Events Occurred ML20210F3651999-07-0909 July 1999 Submits Safeguards Event Log for Calendar Quarter Ending 990630,IAW 10CFR73.71 & LACBWR Security Plan ML20206R9211999-05-10010 May 1999 Forwards Annual Financial Rept & Certified Financial Statements for DPC for Years 1998 & 1997,IAW 10CFR50.71(b). Util Will Forward 1998 Annual Rept as Soon as Rept Is Completed ML20206J3671999-04-30030 April 1999 Forwards Rev 13 to QA Program Description, IAW 10CFR50.54(a)(3) & 50.4(b)(7).Changes in Rev 13 Listed ML20205R4261999-04-0808 April 1999 Submits Ltr for Calendar Quarter Ending 990331 IAW 10CFR73.71, Reporting of Safeguards Events. No Safeguards Events Occurred During Quarter ML20204F8291999-03-0909 March 1999 Forwards Annual Rept on Status of Decommissioning Funding for La Crosse Boiling Water Reactor,Iaw 10CFR50.75(f)(1) ML20207C2661999-02-19019 February 1999 Forwards Radioactive Effluent Rept & Radiological Monitoring Rept for 1998 for Lacbwr. Lacbwr,Pcp & ODCM, Encl ML20207A9431999-02-11011 February 1999 Forwards Revised Pages to LACBWR Decommissioning Plan. Each Page with Change Will Have Bar in right-hand Margin to Designate Location of Change ML20196A8921998-11-23023 November 1998 Forwards Rev 12 to LACBWR QA Program Description ML20154P4351998-10-13013 October 1998 Responds to Re Insp Rept 50-409/98-02 & Refers to C/As Taken to Bring LACBWR Into Compliance with Maint Rule ML20153F7431998-09-14014 September 1998 Informs That Changes Made in Rev 12 Are Adminstrative in Nature & Do Not Result in Reduction in Commitment to Safety & Reliably Operate LACBWR in Safstor Condition,Per 980909 Telcon with NRC ML20237E2631998-07-15015 July 1998 Forwards Rev 12 to QA Program Description. Page Change Locations Indicated by Bold Bar in right-hand Margin ML20217K7121998-03-27027 March 1998 Forwards Rev 18 to LACBWR Emergency Plan.Bar Lines in right- Hand Margins Note Changes.Description of Each Change & Reason for Change Is Included as Cover Pages to Plan Rev ML20202J4261998-02-16016 February 1998 Forwards Revised LACBWR Decommissioning Plan & Revised LACBWR Initial Site Characterization Survey for Safstor. Both Documents Revised Jan 1998 ML20202J0381998-02-10010 February 1998 Forwards Revised LACBWR Decommissioning Plan. Each Page W/Change Will Have Bar in right-hand Margin to Designate Location of Change ML20198R9721997-10-24024 October 1997 Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encl Withheld ML20149G1311997-07-10010 July 1997 Submits Ltr Re Quarterly Submittal of Safeguards Events Log for Quarter Ending 970630.No Safeguards Events During Past Quarter ML20148S9131997-07-0303 July 1997 Forwards Annual Financial Rept & Certified Financial Statements for Dairyland Power Cooperative for 1996 & 1995 ML20141B7521997-05-0909 May 1997 Forwards TS Re Changes to LACBWR Controlling Documents ML20138H8011997-04-29029 April 1997 Forwards Corrected Page to Safety Evaluation,Issued by NRC, by Ltr Dtd 970425.W/o Ltr ML20138A6431997-04-15015 April 1997 Forwards Rev 11 to LACBWR QA Program Description ML20138B7261997-04-10010 April 1997 Submits Ltr for Calendar Quarter Ending 970331,IAW 10CFR73.71 & LACBWR Security Plan ML20134H1841997-01-31031 January 1997 Submits Quarterly Safeguards Event Log Re License DPR-45 ML20133A3721996-12-16016 December 1996 Forwards Rev 17 to LACBWR Emergency Plan ML20132F8601996-12-10010 December 1996 Forwards Revised LACBWR Decommissioning Plan. Each Page W/ Change Will Have Bar in right-hand Margin to Designate Location of Change ML20134M2421996-11-0505 November 1996 Forwards Rev 11 to QA Program Description, Clarifying Section I, Organization Paragraph 7.d Revised to Assure Majority of SRC Members Be Degreed Individuals ML20058P1281993-12-0909 December 1993 Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encls Withheld (Ref 10CFR2.790(d)) ML20059G6131993-11-0101 November 1993 Responds to Re Violations Noted in Insp Rept 50-409/93-01 on 930903 & 22 & 24.Corrective Actions: Reassigned Mechanics & Instrument Technician to LACBWR Staff ML20056E2601993-08-12012 August 1993 Forwards Nonproprietary & Proprietary Version of Analysis of Potential Blast Effects on LACBWR Reactor Bldg Due to 16 Inch Natural Gas Pipeline Failure,Suppl Analysis for Fast Closing Valve. Proprietary Version Withheld ML20056E2681993-05-11011 May 1993 Requests That Proprietary Analysis of Potential Blast Effects on LACBWR Reactor Bldg Due to 16 Inch Natural Gas Pipeline Failure,Suppl Analysis for Fast Closing Valve Be Withheld,Per 10CFR2.790(b)(4) ML20128P4611993-02-11011 February 1993 Forwards Rev to Annual Decommissioning Plan,Changing Requirement to Maintain Hourly Meteorological Data Logging for Effluent Release Calculations & Removing Makeup Demineralizer Sys ML20128K5891993-02-0909 February 1993 Forwards Corrected App a to Annual Rept for 1992 - Rept of Changes,Tests & Experiments ML20055H6371990-07-25025 July 1990 Forwards Decommissioning Fund Rept for Plant ML18041A2111989-11-16016 November 1989 Responds to Generic Ltr 89-19 Re Request for Action Re Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Actions or Recommendations in Generic Ltr Will Not Be Performed ML20248C5941989-09-21021 September 1989 Forwards Revised Radioactive Effluent Rept for LACBWR (Jan- June 1989), Incorporating Sr-89/90 & Fe-55 Analysis Data ML20247A1931989-08-22022 August 1989 Forwards Proposed Operator Licensing Exam Schedule Format for FY90 - FY93,in Response to Generic Ltr 89-12 ML20245G0911989-07-27027 July 1989 Advises That Util Already Exempt from 10CFR26, Fitness-for- Duty Program Because of Safstor Status.Request for Exemption Will Not Be Necessary Since License Amended to possession-only License Via Amend 63 ML20246K8411989-07-10010 July 1989 Responds to Generic Ltr 89-06, Task Action Plan Item I.D.2, Spds. All Spent Fuel Transferred from Reactor to Spent Fuel Storage Well & on 870804,License DPR-45 Amended to possess- but-do-not-operate Status ML20246B8371989-06-27027 June 1989 Forwards Endorsements 71,72,73,74,75 & 76 to Nelia Policy NF-217 ML20245A1231989-06-0606 June 1989 Submits Whole Body Dose Estimates & Request for Changes to Tech Specs 6.8.3.1 & 6.8.4 ML20248C2861989-06-0101 June 1989 Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Generic Ltr Does Not Apply to Plant Since No Sys Operate as High Energy Sys ML20247B3121989-05-0808 May 1989 Responds to NRC Re Conduct of Backfit Process, Informing NRC of Plant Permanent Shutdown in Apr 1987 ML20248F1421989-04-0707 April 1989 Forwards Annual Financial Rept & Certified Financial Statements for 1987 & 1988.W/o Annual Financial Rept ML20246N8041989-03-17017 March 1989 Submits Info Re on-site Property Damage Insurance for License DPR-45 for Period 880919 - 890919 ML20204G9191988-10-13013 October 1988 Requests Immediate Relief from Several Sampling & Analysis Requirements of Radiological Environ Monitoring Program to Check for Prescence of I-131.Tech Spec Changes Encl ML20155A3101988-09-30030 September 1988 Responds to NRC 880707 Request for Addl Info Re Decommissioning Plan.Info Includes Flooding Potential & Protection Requirements,Flood Conditions & Effects of High Water Level on Structures ML20154L3511988-09-0909 September 1988 Forwards Answers to Request for Addl Info Re Decommissioning Plan & Safe Storage Tech Specs.Some Answers Suggest Changes to Either Tech Specs or Decommissioning Plan ML20154J3411988-09-0808 September 1988 Forwards Revs to Security,Training & Qualification & Contingency Plans.Revs Withheld (Ref 10CFR2.790(d)) ML20154E4671988-08-30030 August 1988 Responds to Generic Ltr 88-13, Operator Licensing Exams. NRC Will Require Qualified Individuals to Be in Charge of Control Room & Fuel Handling Operations ML20207D1801988-08-0303 August 1988 Advises That Generic Ltr 88-11 Re Radiation Embrittlement of Reactor Vessel Matls Inapplicable to Facility.Reactor Vessel Will Not Be Subj to Pressurization in Plant Safstor Condition 1999-07-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML20055H6371990-07-25025 July 1990 Forwards Decommissioning Fund Rept for Plant ML18041A2111989-11-16016 November 1989 Responds to Generic Ltr 89-19 Re Request for Action Re Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Actions or Recommendations in Generic Ltr Will Not Be Performed ML20248C5941989-09-21021 September 1989 Forwards Revised Radioactive Effluent Rept for LACBWR (Jan- June 1989), Incorporating Sr-89/90 & Fe-55 Analysis Data ML20247A1931989-08-22022 August 1989 Forwards Proposed Operator Licensing Exam Schedule Format for FY90 - FY93,in Response to Generic Ltr 89-12 ML20245G0911989-07-27027 July 1989 Advises That Util Already Exempt from 10CFR26, Fitness-for- Duty Program Because of Safstor Status.Request for Exemption Will Not Be Necessary Since License Amended to possession-only License Via Amend 63 ML20246K8411989-07-10010 July 1989 Responds to Generic Ltr 89-06, Task Action Plan Item I.D.2, Spds. All Spent Fuel Transferred from Reactor to Spent Fuel Storage Well & on 870804,License DPR-45 Amended to possess- but-do-not-operate Status ML20246B8371989-06-27027 June 1989 Forwards Endorsements 71,72,73,74,75 & 76 to Nelia Policy NF-217 ML20245A1231989-06-0606 June 1989 Submits Whole Body Dose Estimates & Request for Changes to Tech Specs 6.8.3.1 & 6.8.4 ML20248C2861989-06-0101 June 1989 Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Generic Ltr Does Not Apply to Plant Since No Sys Operate as High Energy Sys ML20247B3121989-05-0808 May 1989 Responds to NRC Re Conduct of Backfit Process, Informing NRC of Plant Permanent Shutdown in Apr 1987 ML20248F1421989-04-0707 April 1989 Forwards Annual Financial Rept & Certified Financial Statements for 1987 & 1988.W/o Annual Financial Rept ML20246N8041989-03-17017 March 1989 Submits Info Re on-site Property Damage Insurance for License DPR-45 for Period 880919 - 890919 ML20204G9191988-10-13013 October 1988 Requests Immediate Relief from Several Sampling & Analysis Requirements of Radiological Environ Monitoring Program to Check for Prescence of I-131.Tech Spec Changes Encl ML20155A3101988-09-30030 September 1988 Responds to NRC 880707 Request for Addl Info Re Decommissioning Plan.Info Includes Flooding Potential & Protection Requirements,Flood Conditions & Effects of High Water Level on Structures ML20154L3511988-09-0909 September 1988 Forwards Answers to Request for Addl Info Re Decommissioning Plan & Safe Storage Tech Specs.Some Answers Suggest Changes to Either Tech Specs or Decommissioning Plan ML20154J3411988-09-0808 September 1988 Forwards Revs to Security,Training & Qualification & Contingency Plans.Revs Withheld (Ref 10CFR2.790(d)) ML20154E4671988-08-30030 August 1988 Responds to Generic Ltr 88-13, Operator Licensing Exams. NRC Will Require Qualified Individuals to Be in Charge of Control Room & Fuel Handling Operations ML20207D1801988-08-0303 August 1988 Advises That Generic Ltr 88-11 Re Radiation Embrittlement of Reactor Vessel Matls Inapplicable to Facility.Reactor Vessel Will Not Be Subj to Pressurization in Plant Safstor Condition ML20151Q5001988-07-29029 July 1988 Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs ML20151E8791988-07-18018 July 1988 Requests Revised Submittal of Deadline of 881001 to Facilitate Review of Questions Re Decommissioning Plan. Partial Submittal Will Be Made as Soon as Possible ML20151D4161988-07-15015 July 1988 Responds to NRC Bulletin 87-002,Suppls 1 & 2, Fastener Testing to Determine Conformance W/Applicable Matl Specs. Fastener Purchases Will Be Monitored Through Procurement Control & Receipt Insp Processes ML20196J2371988-06-22022 June 1988 Responds to NRC Re Violations Noted in Insp Rept 50-409/88-06.Semiannual Whole Body Counts Required by Procedure But Not by Regulation ML20196J1391988-06-22022 June 1988 Responds to NRC Bulletin 88-005 & Suppl 1 to Bulletin Re Nonconforming Matls Supplied by Piping Suppliers,Inc.Review of Procurement Documents Indicated That No Procurement Made W/Piping Suppliers,Inc ML20155E3431988-06-0606 June 1988 Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Demineralized Water Transfer Sys Has Potential for dead-heading of One Pump,But Sys Not safety-related.No Actions Planned in Response to Bulletin ML20154J3291988-05-18018 May 1988 Forwards Change to Rev 10 to Emergency Plan Section 3.8.1, Radiological Protection of Onsite Personnel, Per 880511 Request.Change Describes Conditions for Precautionary Onsite Sheltering & Control Room Ventilation Isolation ML20154F9581988-05-16016 May 1988 Responds to NRC Bulletin 85-003,Suppl 1, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. No Addl safety-related motor- Operated Valves Found ML20154D5871988-05-10010 May 1988 Submits Info Re Level & Sources of Onsite Property Damage Insurance,Per 10CFR50.54(w).Effective Dates of Primary Coverage Are 870919-880919 ML20154P7371988-04-29029 April 1988 Responds to NRC Re Violations Noted in Insp Rept 50-409/88-03.Corrective Actions:Operations Review Committee Meeting Convened to Discuss Implications of Event.Individual Counseled Re Attention to Duty ML20151U0351988-04-28028 April 1988 Forwards Rev 2 to Plant Physical Security,Guard Force Training & Safeguards Contingency Plans.Encls Withheld (Ref 10CFR2.790(d)) ML20151M7871988-04-18018 April 1988 Forwards Annual Financial Rept & Cetified Financial Statements for 1986 & 1987.Annual Rept for 1987 Will Be Forwarded as Soon as Possible ML20151M8251988-04-15015 April 1988 Responds to 880128 & 0219 Requests for Addl Info Re Plant Emergency Plan & Forwards Rev 10 to Plan.Map of LACBWR Site Defining Emergency Planning Zone Will Be Added to Emergency Plan as Figure A-2 on Page A-15 ML20151B2131988-03-28028 March 1988 Forwards Revised Rev 5 to QA Program Description for possession-only Condition.Revised Pages Reflect Recent Organizational Change ML20148H0511988-03-28028 March 1988 Forwards Revs to Amended Security,Guard Force Training & Qualification & Safeguards Contingency Plans Submitted on 870924.Encls Withheld (Ref 10CFR2.790) ML20196H3531988-02-25025 February 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. No Westinghouse Ds Series Circuit Breakers Installed at Facility ML20149N0351988-02-22022 February 1988 Forwards Revised Pages to 870930 Application for Amend to License DPR-45 ML20149J1261988-02-16016 February 1988 Responds to Generic Ltr 88-02 Re Isap Ii.Participation in Program Would Not Further Interests of Util,Since Facility Permanently Shut Down on 870430 & Defueling Completed on 870611 ML20234C3601987-12-21021 December 1987 Forwards Rev 5 to Facility QA Program Description.Analyses Show That No Postulated Accident Would Result in Release Exceeding 10CFR100 Limits,In Present Plant Condition ML20147A8031987-12-21021 December 1987 Forwards Decommissioning Plan & Suppl to Environ Rept for Facility post-operating License Stage,For Review.Proposed Tech Specs for Safstor Period Will Be Submitted Separately. Fee Paid ML20236X8671987-11-30030 November 1987 Forwards 870929 Application Fee for Review of Emergency Plan Rev,In Response to from Diggs to Taylor ML20236M4541987-11-0505 November 1987 Discusses Review of Surveillance Testing Performed Due to 870430 Plant Shutdown.Performance of Listed Tests No Longer Required by Tech Specs Terminated ML20236J8301987-10-30030 October 1987 Confirms That Util Not Required to Pay Annual Fee for Power Reactor OLs or Seek Renewal of Exemption Reducing Amount of Such Fee,Per Issuance of Amend 56 to License DPR-45 on 870804 ML20236J4471987-10-30030 October 1987 Forwards Application Fee for Amend to License DPR-45, Inadvertently Omitted from ML20235X0991987-10-12012 October 1987 Forwards Payment in Amount of $25,000 in Response to 870224 Notice of Violation & Proposed Imposition of Civil Penalty ML20235R1541987-10-0101 October 1987 Provides Supplemental Info Re Requesting Exemption from Requirements to Conduct Annual Emergency Preparedness Exercise.Util Plans to Conduct Exercise within 180 Days After NRC Approval of 870930 Rev ML20235R0161987-09-29029 September 1987 Forwards Emergency Plan Rev,Reflecting Current Status of LACBWR Facility for NRC Approval.Technical Rept,Justifing Proposed Emergency Planning Zone Boundary,Encl ML20235S3321987-09-29029 September 1987 Informs That La Crosse BWR Permanently Shutdown on 870430. Reactor Defuelling Completed on 870611.Listed Active Licensing Actions No Longer Necessary ML20235H4791987-09-24024 September 1987 Forwards Changes to Physical Security,Security Guard Force Training & Qualification & Safeguards Contingency Plans.Fee Paid.Changes Withheld (Ref 10CFR73.21) ML20234E3641987-09-0909 September 1987 Submits Response to IE Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants, Dtd 870709.Formal Insp Program Not Necessary for Continued Safe Fuel Storage at Facility Due to Permanent Termination of Plant Operations ML20238C5201987-09-0202 September 1987 Forwards Endorsements 68 & 69 to Nelia Policy NF-217 ML20238F7371987-09-0101 September 1987 Requests Exemption from 10CFR50,App E Requirement to Conduct Annual Emergency Preparedness Exercise & Requirements to Prepare & Distribute Info Brochure to Residents within 5-mile Epz.Requirements Unnecessary 1990-07-25
[Table view] |
Text
_
D DA/RYLAND -
h [k COOPERAT/VE
- BOX 817 - 2615 EAST AV SOUTH =
LA CROSSE. WISCONSIN S4601 (608) 788-4000 May 13, 1986 In reply, please refer to LAC-11587 DOCKET NO. 50-409 Mr. John A. Zwolinski, Directoh BWR Project Directorate #1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LABCWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 CENERIC REQUIREMENTS
REFERENCE:
(1) NRC Letter, Zwolinski to Taylor dated April 18, 1986.
Dear Mr. Zwolinski:
You requested that we provide status information on the list of generic requirements enclosed in your letter. We have completed this task, except for those items on which we are awaiting explanatory information from the NRC. J.
Stang, the NRC Project Manager for LACBWR, has reque.ced that we submit the status information we have completed to date. The status information is enclosed in this letter.
If you have any questions, please contact us. -
Yours truly, DAIRYLAND POWER COOPERATIVE James W. Taylor General Manager JWT:LSG:sks cc: Mr. John Stang, LACBWR Project Manager Mr. James G. Keppler, Region III NRC Resident Inspector ,
\
8605200268 860513 9 ,bC85 PDR ADOCK 0500 is P g\
\
! R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.s 243 FACILITY IMPLEMENTATION 03/31<86, FACILITYs LA CROSSE PLANT LOCATION: 19 MI 5 0F LACROSSE, HISC LICENSED POWER: 0165 MHT PROJECT MANAGER: J. STANG DOCKET NUMBER: 050-00409 DESIGN POWER: 0050 MNE BRANCH CHIEF: J. ZMDLINSKI ARCH / ENGINEER: 58L NSSS VENDOR: AC LIC ASSISTANT: C. JAMERSON
, IE INSPECTOR: I. VILLALVA j LIC ACT LICENSEE j TAC HO. MPA 9 TITLE COMPLETE STATUS R&Ig l M08S32 A-01 10 CFR 50.55 A(G) - ISI 08/25/82C Complete 1982 M08099 A-02 APPENDIX I - ALARA 10/18/84C Complete May 1985 i
M07230 A-03 SECURITY REVIENS-MODIFIED AMENDMENT PLANS 05/16/79C Complete 1982 M08858 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 08/24/82C Complete April 1985 M08467 A-06 RESPIRATORY PROTECTION SYSTEM 12/15/81C Complete March 1985 M10936 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 05/19/80C M10928 A-10 CONTINGENCY PLANNING 04/02/82C Complete 1983 M10929 A-11 GUARD TRAINING PLANS 12/06/82C' Complete December 1984 j M10930 A-12 VITAL AREA ANALYSIS 04/12/82C M47561 A-16 QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 08/17/82C Complete 1983 M51101 A-17 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDEN 01/01/87 Under review by NRC M54666 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 05/30/86 Under review by NRC l
M59106 A-20 to CFR 50.62 OPERATING REACTCR REVIENS 03/31/86 Physically complete 1980, Under review Complete 1978 by NRC.
M07897 B-01 DIESEL GENERATOR LOCKOUT 12/1S/81C I
M06665 B-02 FIRE PROTECTION 07/27/79C Refer to B-41 M46664 B-05 STRESS CORROSION CRACKING - BHR RCSPB 10/14/83C-
,,,,- -Complete 1983
_,08220 M B-05 STRESS CORROSION CRACKING - BWR RCSPB 08/20/79C N08196 B-06 BHR RELIEF VALVE 07/16/80C M12172 B-16 EMERGENCY PLANNING AND REVISIONS 04/01/81C Complete April 1985
]
M08466 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 12/15/81C NA T i i
o I
e d -$9 0
m, . r r, j e,.; " y ; .
I ,
- . yt . .
s ,
a:/
c +
l , .
R-1208731-001 R E O U L A T 0.R Y I N F 0 R H ,A T Is0 N TRACKING
- SYSTEM. PAGE NO.t 244 't s FACILITY IMPLEMENTATION 03/31/86-LA CROSSE (CONTINUATION) ; s_
LIC AGT - LICENSEE TAC NO. MPA 0 TITLE COMPL'ET E STATUS RAlg Mic?S5 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATIDH '-10/25/80C Under NRC review for T.S.' change also refer to,,b-24 M10347 h-21 LOSS OF 125-V DC BUS VOLTAGE HITN LOSS OF ANNUNCIA 02/73/82C *
- MdE468- B-22 TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 06/04/81C NA ;
M10031 B-23 D.EGRADED ORID VOLTAGE 110/14/S2C ,
Projected. 1988 C -
M42611 B-24 VENTING AND PURGING CONTAINMENTS WHILE AT FULL P0H 04/30/84C Complete March'1986 except seismic x consideration of debris screens;is M11136 B-24 12/12/80C VENTING AND PURGING CONTAINMENTS WHILE A14 FULL P0H fjgd,tgRE"se9"sncestuaywnicatis M10888 B-27 REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL ' 10/01/80C Complete 1978 l Hi1100 B-41 FIRE FROTECTION - FINAL TECH SPECS (INCLUDES SER S 04/01/81 C-- - .'- _,: Projected 1987 M43628 ' B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 07/12/83C -
M43980 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 04/04/84C s ',
M117 47- B-42 TMI FOLLON UP - ALL PLANTS 10/14/80C Complete 1982 M12449 B-44 LESSONS LEARNED IMPLEMENTATION 06/04/81C M30584 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C , NA _, s s-M30585 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C NA .
M30586 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C Complete 1980 M30587 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C Cat. A Complete 1980, Cat B - R$fer to F-63.
M30588 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C Complete 1980 M30589 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C Complete 1980 M30590 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C Cat. A Complete 1980, Cat. B - Refer to F-20.
- *"M30591 B-44 LESSONS LEARNED IMPLEMENTATION .04/25/80C Cat. A Complete 1980, Cat. B - Refer to F-12.
M30592 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C Cat. A Complete 1980, Cat. B - Refer to F-11.
M30593 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C Complete 1980 2
M30594 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C Complete 1982 O
F
R-1208731-001 REOULAT0RY INF0RMATIAN TRACKINO SY$ TEM PAGE NO. 24 FACILITY IMPLEMENTATION 03/31/8y LA CROSSE (CONTINUATION)
LIC ACT LICENSEE TAC NO. MPA 8 TITLE COMPLETE STATUS RAIE M30595 B-44, LESSONS LEARNED IMPLEMENTATION 04/25/80C Cat. A Complete 1980, Cat. B - Pefer to F-26.
i M30596 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C Complete 1981 M30597 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C Cat. A Complete 1980, Refer to F-14 for Cat. B.
M12917 B-45 NASH 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR 02/25/81C Complete 1982 4
M12763 5-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 11/05/81C Complete 1981 M43981 B-51 EVALUATION OF BULLETIN 79-06 AND 79-08 07/04/81C - Complete 1981 M42211 B-58 SDV CAPABILITY 01/01/70C NA, No response required per Res. Insp. in 1980.
M42916 .B-59 MASONRY HALL DESIGN 07/31/86 Under NRC review.
M42522 B-60 ENVIRONMENTAL QUALIFICATION 04/18/85C Complete April 1985(but refer
, M42682 B-61 LOSS OF NON CLASS IE ISC PDHER 07/28/82C Complete 1980 to A-17).
' Complete 1982 M42753 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 01/12/82C M43907 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACK 0UT 12/18/81C Complete 1981 i M43716 B-65 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN BNR 12/15/81C NA 1 M51682 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 01/08/85C Complete 1985, except for T.S. associated with
' B-76 ~
) M52768 ITEM 1.1 - POST TRIP REVIEH PROGRAM DESCRIPTION 8 12/02/85C Complete.NRC}gf$3f85.
M52849 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER 09/30/86 Under NRC review l ' M52930 B-78 ITEMS 3.1.1 8 3.1.2 -POST MAINTENANCE TEST PROCEDU 03/31/86 Complete NRC Ictter 03/20/86 M53011 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 02/28/87 Under NRC review
' M54542 B-83 Under NRC review TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83- 11/30/84C j ""M56859 B-84 INSPECTIONS OF BHR STAINLESS STEEL PIPING ACCORDIN 03/31/86 Under NRC review M53600 B-85 SALEM ATHS 1.2 DATA CAPABILITY 04/15/86 Under NRC review MS3683 B-86 SALEM ATHS 2.2 S-R COMPONENTS 09/30/86 Under NRC review
' Complete M53766 B-87 SALEM ATHS 3.2.1 8 3.2.2 S-R CCMPONENTS 03/31/86 NRC letter 03/20/86 7
o o
e I
i
R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO r 246 FACILITY IMPLEMENTATION 03/31/86 LA CROSSE (CONTINUATION)
TAC NO. MPA 0 TITLE LIC ACT LICENSEE COMPLETE STATUS 2AII M53849 B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS 10/30/86 Under NRC review M54076 B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FEATURES 05/17/85C Complete NRC letter 05/17/85 M53993 B-93 SALEM ATHS 4.5.2 4 4.5.3 TEST ALTERNATIVES- 02/28/86 Under NRC review M08280 C-02 BHR-RECIRC. PUMP TRIP (ATHS) 08/20/79C Complete 1980 M07999 C-10 Complete CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 08/17/83C NRC letter 08/17/83 M52239 C-15 CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPA 06/28/85C Complete NRC letter 06/28/85 M10068 D-11 FISSION GAS RELEASE 10/13/79C M07957 D-12 NON-JET PUMP BNR CORE SPRAY PERFORMANCE 04/19/79C M12289 D-15 HIGH ENERGY LINE BREAK 8 CONSEQUENTIAL SYSTEM FAIL 02/19/81C M43049 D-17 DEFINITION OF OPERABLE Complete 10/30/81C 1981 M55870 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 02/24/86C Complete NRC letter 02/24/86 N07441 E-01 SPENT FUEL POOL EXPANSIONS 02/04/80C-M08856 E-01 SPENT FUEL POOL EXPANSIONS 10/06/79C M01214 E-02 FUEL CASK DROP 10/22/75C Complete 1976 M44030 F-01 I . A .1.1 SHIFT TECHNICAL ADVISOR 07/09/82C Complete 1982 M44099 F-02 I . A .1.3 SHIFT MANNING 06/30/83C Complete 1983 T.S. change 1/85 M44171 F-03 I.A.2.1 UPGRADING OF RO AND SRO TRAINING 11/24/82C Complete 1980 M44242 F-04
- I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 06/07/84C Under NRC review M44312 F-05 I.C.1.2/3.5 PROCEDURES GENERATION PACKAGES (NUREG 10/30/86 Under NRC review
' ""M47225 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE .02/09/82C Complete 1980 M47297 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI 02/09/82C Complete 1981 M51171 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEH PROGRA 10/10/84C Complete 1982 M51251 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 08/30/86 Gader NRC review
~~
- F-04 from clarification list - La Crosse - NUREG-0737 I.C.1.2.A Inadequate Core Cooling Guidelines - Complete
, p 1980 I
R-1208731-001 REOULAT0RY INF0RHATION TRACKINO $YSTEM pad'E NO.* '247 FACILITY IMPLEMENTATION 03/31/86 LA CROSSE (CONTINUATION)
LIC ACT LICENSEE TAC NO. MPA 8 TITLE COMPLETE STATUS DAlg M44381 F-10 II.B.1 RCS HIGN POINT VENTS 08/25/83C Complete. NRC letter 08/25/83 except for ar-rangement due to F-71, which is projected to be M47948 F-11 II.B.2 PLANT SHIELDING 06/27/83C Complete 5/85 complete 5/86.
M44450 F-12 II.B.3 POST ACCIDENT SAMPLING 05/30/86 Pr jected June 1986, pgdeg NRC M44521 F-13 II.B.4 TRAINING FOR MITIDATING CORE DAMAGE 11/24/82C Complete 1981 M44591 F-14 II.D.1 RV AND SV TRAINING 11/30/84C Complete 1981 M44789 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION 12/15/81C Complete 1980 M44860 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY 09/20/83C Proj ected 1987 M44931 F-20 II.F.1.1 NOBLE GAS MONITOR 10/20/81C Under NRC review M45002 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 10/20/81C Under NRC review M45073 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 03/05/82C Complete 1982 M47609 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 05/14/84C Complete 9/85 M47680 F-24 II.F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT 05/14/84C Complete NRC letter May 1984.
M47751 F-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR 05/14/84C Complete NRC Ictter May 1984.
M45144 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE 10/30/86 Complete NRC letter May 1981.
M45353 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 03/08/82C Complete 1981, T.S. 1/85 M45545 F-43 II.K.3.13 HPCI AND RCIC INITIATION LEVELS 11/30/81C Complete 1980, NA M46524 F-44 II.K.3.14 ISOLATION CONDENSER ISOLATION MODIFICAT 12/14/81C Complete 1980 NRC Ictter 1981,NA M45597 F-46 II.K.3.16 CHALLENGES AND FAILURES OF RELIEF VALVE Complete 1980, NA 04,/14/83C M45639 F-47 II.K.3.17 ECCS OUTAGES 08/19/83C Complete 1982
"~
M45693 F-48 II.K.3.18 ADS ACTUATION 03/31/82C Complete 1980, NA M45717 F-49 II.K.3.19 INTERLOCK RECIRCULATION PUMP MODIFICATI 04/27/82C Complete 1980 M45741 F-50 II.K.3.21 RESTART OF CSS AND LPCI 11/16/82C Complete NRC 1ctter 1982.
M45765 F-53 II.K.3.25 POWER ON PUMP SEALS 05/25/83C Complete NRC letter 1983.
I I
t L
R-1208731-001 REOULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.8 248 FACILITY IMPLEMENTATION 03/31/86 LA CROSSE (CONTINUATION)
LIC ACT LICENSEE TAC NO. MPA 8 TITLE COMPLETE STATUS RAIE M45789 F-54 II.K.3.27 COMMON REFERENCE LEVEL 10/15/82C Proj ected 1987 M48279 F-55 II.K.3.28 QUALIFICATION OF ADS ACCUMULATORS 05/24/83C Complete 1982 M46525 F-56 II.K.3.29 PERFORMANCE OF ISOLATION CONDENSERS 02/09/82C Complete 1981 M45836 F-57 II.K.3.30 SB LOCA METHODS 02/02/84C Complete NRC letter 2/84.
M48175 F-58 II.K.3.31 COMPLIANCE WITH 10 CFR 50.46 02/02/84C Complete NRC letter 2/84.
M45889 F-59 II.K.3.44 ANTICIPATED TRANSIENTS HITH SINGLE FAIL 03/26/84C Complete 1981 M45913 F-60 II.K.3.45 MANUAL DEPRESSURIZATION 01/06/83C Complete 1980, NA M45955 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 03/31/86 Complete 2/84.
M46026 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 03/31/86 Complete 2/84.
M46098 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 03/31/86 Complete 2/84.
M46170 F-66 III.A.1.2 NUCLEAR DATA LINK 07/30/82C M46242 F-67 III.A.2.1 EMER0ENCY PLAN UPGRADE TO MEET RULE 05/16/83C Complete 1983 M46314 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 03/31/86 M46385 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 03/05/82C Complete 1981 M46454 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 06/10/82C Complete NRC Ictter 4/85.
M56130 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FDLLOWUP TO 02/21/85C Under NRC review a
I