ML20197J720
| ML20197J720 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 05/15/1986 |
| From: | GULF STATES UTILITIES CO. |
| To: | |
| Shared Package | |
| ML20197J709 | List: |
| References | |
| NUDOCS 8605200155 | |
| Download: ML20197J720 (1) | |
Text
-.
TABLE 3.3.2-2 (Continued) 33 ISOLATION ACTUATION INSTRUMENTATION SETPOINTS
- i ALLOWA8LE TRIP FUNCTION TRIP SETPOINT VALUE ca 2.
MAIN STEAM LINE ISOLATION (Cont'd) l
[.
h.
Main Steam Line Area 35 Temperature - High (Turbine Building) t
-4
- 1. Main Steam Tunnel Area (El. 95')
< 142*F
< 145.3*F l
- 2. Main Steam Tunnel Area (El. 114')
5142*F 5145.3*F s
- 3. Main Steam Line Turbine Shield Wall < ReeAFJ 108*F
< E969El lit.3
- F l
- 4. MSL Moisture Separator and Reheater 5126*FP 5130*FT Area 3.
SECONDARY CONTAINMENT ISOLATION Low Low Level 2 1 - 43 inches
- 1 - 47 inches k
a.
ga b.
Drywell Pressure - High 5 1.68 psig i 1.88 psig h
[
si m
c.
Fuel Building Ventilation s,
Exhaust Radiation - High 1
1RMS*RESA 5 1.82 x 103 pCi/sec 1 2.18 x 103 pCi/sec 1RMS*RESB 1 5.88 x 10 4 pCi/cc 5 7.05 x 10 4 pCi/cc i
d.
Reactor Building Annulus Ventilation Exhaust Radiation - High 1 4.32 x 10 8;pCi/cc 5 5.19,,x 10 5 pCi/cc 4.
REACTOR WATER CLEANUP SYSTEM ISOLATION a.
A Flow - High i 55 gpa 1 62.1 gpm b.
A Flow Timer 1 45 seconds 5 47 seconds Equipment Area Temperature - High c.
1.
Heat Exchanger Room i 98.5*F
$ 101.5*F 2.
Pump Rooms A & B
$ 165'F -
< 169.5*F 3.
Valve Nest Room
< 110*F 2 114.5*F 4.
Demineralizer Rooms 1 and 2 2 110*F 7 114.5'F 5.
Receiving Tank Room 5110*F 5114.5'F 8605200155 860515 PDR ADOCK 05000458 P
PDR m
I