se OPERATING DATA REPORT DOCKET NO 50-255 DATE 05-07-86 COMPLETED BY PASmith TELEPHONE (616)764-8913 OPERATING STATUS NOTES 1.
Unit Name: Palisades 2.
Reporting Period:
-860401-860430 3.
Licensed Thermal Power (MWt):
2530 4
Nameplate Rating (Gross MWe):
811.7 5.
Design' Electrical Rating (Net MWe):
805 6.
Maximum Dependable Capacity (Cross MWe): **770 7.
Maximum Dependable Capacity (Met MWe):
- 730 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:
9.
Power Level to Which Restricted, if any (Net MWe):
10.
Reasons for Restrictions, if any:
This Month Yr-to-Date Cumulative 11.
Hours In Reporting Period 719 2879 125,918 12.
Number of Hours Reactor Was Critical 678.5 1305.8 69,305.7 13.
Reactor Reserve Shutdown Hours 14.
Hours Generator On-Line 647.2 878.1 65,836.8 15.
Unit Reserve Shutdown Hours 16.
Cross Thermal Energy Generated (MWH) 1,321,872 1,653,264 137,255,304 17.
Gross Electrical Energy Generated (MWH) 433,190 538,600 42,756,000 18.
Net Electrical Energy Generated (MWH) 406,978 501,486 40,242,846 19.
Unit Service Factor 90.0 30.5 50.3 20.
Unit Availability Factor 90.0 30.5 50.3 21.
Unit Capacity Factor (Using MDC Net) 77.5 23.9
- 50.1 22.
Unit Capacity Factor (Using DER Net) 70.3 21.6 39.7 a
23.
Unit Forced Outage Rate 10.0 37.3 31.4 24.
Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):
I 25.
If Shut Down at End of Report Period, Estimated Date of Start Up:
26.
Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 03 Based on condenser backpressure
' Weighted Average (635 MWe used as MDC Net prior to October ~ 1985)
OC0185-0001B-0P03 y
(
-(-[::}
mesi,os,a no4ao e
i
,oR
.oocn osoooass sg\\
.R PDR a
P DOCKET NO.
50-255 UNIT SliUTDOWNS AND POWER REDUCTIONS UNIT NAME Palisades DATE 05-07-86 COMPLETED BY PASmith REPORT MONTH April 1986 TELEPHONE (616)-764-8913 1
2 No.
Date Type Duration Reason Method of Licensee Systgm Compogent Cause & Corrective Otours)
Shuting Event Me Me Acdon to 3
Down Reactor Report #
Prevent Recurrence Repair letdwn line relief 6
860410 F
71.8 B
1 valve
.g 9
1.
2.
3.
4.
5.
F: For Reasong Method:
Exhibit G - Instructions Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparat?on of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee
. C-Re fueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
OC0185-0001D-OP03
O AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 05-07-86 COMPLETED BY PASmith TELEPHONE (616)764-8913 MONTH April 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 765 17 311 2
778 18 363 3
776 19 363 4
779 20 386 5
772 21 386 6
779 22 451 7
776 23 758 8
779 24 774 9
778 25 770 10 310 26 763 11 0
27 765 12 0
28 766 13 175 29 769 14 376 30 759 15 371 16 393 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
OC0185-0001C-0F03
SUMMARY
OF OPERATING EXPERIENCE FOR APRIL 1986 The plant operated at essentially 98 percent power until April 10 when power -
reduction began due to a leaking relief valve on the letdown line in excess of allowed PCS leakage. The unit was taken off_line on April 10 at 1126 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.28443e-4 months <br />
'and the reactor was subcritical 12 minutes later.
The reactor was again critical-on April 12 at 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> and was placed on line April 13 at 1109 hours0.0128 days <br />0.308 hours <br />0.00183 weeks <br />4.219745e-4 months <br />. The plant operated at 50 percent 'for _10 days -
while a-condensate pump was replaced. On April 23 the plant reached approximately 98 percent power and remained at this power level through the end of the reporting period.
OC0185-0001E-OP03 I
O Consumers Power Company Pahsades Nuclear Plant 27780 Glue Star Memonal Highway, Covert, MI 49043 May 7, 1986 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of April 1986.
h l
Dewey VanDenBerg Reactor Engineer CC: KMHaas, Palisades GHGoralski, Palisades JGKeppler, USNRC JRSchepers, Palisades KWBerry, P24-614B RAFenech, Palisades Resident Inspector, Palisades DLHackett, P11-228B MAlapinski, P21-332 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan ZCCordero, Michigan Dept of Labor RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RVraylor, CE, Palisades AAAlatalo, Palisades EWAnderson, Palisades EHKoepke, P21-319 Document Control, 950*22*35*10/L GCP86-012
+