May 7, 1986 Docket No.: 50-298 Mr. J. M. Pilant, Technical Staff Manager Nuclear Power Group Nebraska Public Power District Post Office Box 499 Columbus, Nebraska 68601
Dear Mr. Pilant:
SUBJECT:
DETAILED CONTROL ROOM DESIGN REVIEW Re:
Cooper Nuclear Station The staff and its consultants, Lawrence Livermore National Laboratory, plan to conduct a preimplementation audit of NPPD's detailed control room design (DCRDR) of Cooper-Nuclear Station. The purpose of the audit will be to
, evaluate the organization, process, and results of the DCRDR. The audit has been discussed with Greg Smith of your staff, and is planned for May 13-16,
.1986 at Cooper. We request the following preparations:
1.
Review team personnel (including contractors) knowledgeable in each of the DCRDR tasks should be available to discuss the review process and to respond to staff questions during the audit.
2.-
Documentation of the DCRDR organization, process, and results to date should be available.
3.
Conference or office space should be available for the NRC staff's meeting with NPPD and for the staff and its consultants to meet privately.
4.
Access to the control room and remote shutdown facilities should be provided as necessary.
5.
Clearance to bring camera equipment on site and to take photographs in the control room and other areas that would assist in evaluating the DCRDR should be provided.
A tentative audit agenda is provided for planning purposes.
Sincerely, 860515$$$$$IO William 0. Long, Project Manager e
PDR BWR Project Directorate #2 P
Division of BWR Licensing
Enclosure:
DISTRITUBTION:
As-stated DockettEile EJordan BGrimes e
NRC PDR L/PDR JPartlow WLong cc: See next page RBernero SNorris ACRS (10) 0FFICIAL RECORD COPY ('
OELD Gray File DBL:PD#2 DBL:PD#
DB Qp.
SNNWsTnc WLong1 M
DMu Ie6 5/ 7/86 4,L-/8e '
5/1/86
Mr. J. M. Pilant Nebraska Public Power District Cooper Nuclear Station ec:
Mr. G. D. Watson.. General Counsel Nebraska Public Power District P. O. Box 4999 Columbus, Nebraska 68601 fir. Arthur C. Gehr. Attorney Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073 Cooper Nuclear Station ATTN: Mr. Paul Thomason, Division Manager of Nuclear Operations P. O. Box 98 Brownville, Nebraska 68321 T
Director Nebraska Department of Environmental Control P. O. Box 94877 State House Station Lincoln, Nebraska 68509 Mr. William Siebert, Commissioner Nemaha County Board of Commissioners Nemaha County Courthouse Auburn, Nebraska 68305 i
Resident Inspector U.S. Nuclear Regulatory Commission i
P. O. Box 218 Brownville, Nebraska 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission a
- j 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 H. Ellis Simmons, Director Division of Radiological Health Department of Health 301 Centennial Mall, South P. O. Box 95007 Lincoln, Nebraska 68509
ENCLOSURE
{
TENTATIVE AGENDA COOPER NUCLEAR STATION DETAILED CONTROL ROOM DESIGN REVIEW PREIMPLEMENTATION AUDIT Tuesday, May 13, 1986 AM.
NRC entry briefing (D. Serig)
NPPD presentation on DCRDR a.
DCRDR status b.
Participation of multidisciplinary review team c.
Coordination with E0P upgrade, Reg. Guide 1.97, SPDS, and training d.
Overview of Cooper Nuclear Station emergency and operating systems Visit control room Lunch PM Audit of system, function, and task analysis, and comparison of display and control requirements with control room inventory (LLNL)
Audit of HEDs and proposed corrections (D. Serig)
Wednesday, May 14, 1986 AM Audit of operating experience (LLNL)
Audit of HEDs and proposed corrections (D. Serig)
Lunch
'PM Audit of control room survey (LLNL)
Audit of HEDs and proposed corrections (D. Serig)
Thursday..May 15, 1986 AM
~ Audit of HED assessment process (LLNL)
[
Audit of HEDs and proposed corrections (D. Serig)
Lunch t
~
2 PM Audit of selection and verification of design improvements (LLNL)
Audit of HEDs and proposed corrections (D. Serig)
Friday, May 16, 1986 AM Audit team meeting Technical meeting between NPPD and NRC Audit Team Lunch PM Exit briefing (D.Serig)
Audit Team:
Dennis Serig - NRC, engineering psychology / human factors Jim Moore - LLNL, electrical engineering / human factors Jack Savage - LLNL, electrical engineering / human factors Bill Long - ilRC, Project Manager l
t l
l l
l
,