ML20197D412
| ML20197D412 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 02/28/1986 |
| From: | Mcnamara A, Spector S ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8605140262 | |
| Download: ML20197D412 (7) | |
Text
-
8 1
OPERATING DATA REPORT DOCKET NO.
50 244 DATE March 12. 1986 COMPLETED BY bN S Mf-"
Andrew E. McNamara TELEPilONE 315-524-4446 Ext. 301 OPERATING STATUS Ginna Station
- 1. Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Note s Unit offline @ 2400
- 2. Reporting Period:
Februarv. 1986 hrs. on 2/7/86, Annual 1520 Refueling and Maintenance
- 3. Licensed Thermal Power (Mit):
490 Split Pin Modifications,
- 4. Nameplate Rating (Gross MTe):
470 continued in the report
- 5. Design Electrical Rating (Net MWe):
period.
490
- 6. Maximum Dependable Capacity (Gross MTe):
470
- 7. Maximum Dependable Capacity (Net MTe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Thich Restricted, if Any (Net MTe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Da te Cumulative 672 1,416 142,536.00
- 11. Ilours In Reporting Period
- 12. Number of flours Reactor Tas Critical 168 912 109,19_9_.17 0
0 1.687.55*
- 13. Reactor Reserve Shutdown flours 168 912 106.936.63*
- 14. Ilours Generator On-Line 0
0 8.5*
- 15. Unit Reserve Shutdown flours
- 16. Gross Thermal Energy Generated (Mill) 198,456 1,255,128 148,977,753
- 17. Gross Electrical Energy Generated (MTH) 66,043 420,2_88 48,713,144
- 18. Net Electrical Energy Generated (MTil, 62.064 398.170 46.201.487
- 19. Unit Service Factor 25.0%
64.41%
75.01%
- 20. Unit Availability Factor 25.0%
64.41%
75.02%
- 21. Unit Capacity Factor (Using MDC Net) 19.65%
59.83%
70.56%
- 22. Unit Capacity Factor (Using DER Net) 19.65%
59.83%
70.56%
- 23. Unit Forced Outage Rate 0%
0%
7.27%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shur Down At End Of Report. Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operution):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Cummulative total commencing January 1, 1975 RE #. 4<t$ 49 88 8605140262 860228 g
d PDR ADOCK 05000244 5
7 R
PDR lfl
. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE March 12. 1986 COMPLETED BY W A. h1 MM - -
- ~
Andrew E. M'cNamara S'
TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH February, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
389 17.
2.
385 18.
3.
381 19.
4.
374 20.
5.
371 21.
6.
366 22.
7.
321 23.
8.
24.
9.
25.
10.
26.
11.
27.
12.
28.
13.
29.
14.
30.
31.
15.
16.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
DO( KliT NO. _ 50-244 IINITNAMIC
..E CINNA NUCLEAR POWER PLANT R
UNIT SHUTDOWN AND POWER REDUCTIONS DATli r h lL__19.1 COMPLETED ltY _.
8 M _ m;u Andrew E. McNamara REPORT MONTil FEBRUARY 1986
-l E l.E pilON E 315-524-4446 Ext. 301 Ginna Station m
N c
- m C
1,1censee o e u E,
Cause & Corrective i
oO c
k Action to No.
Date
{
jj
}{j Event
{4
!j p.-
f2 y
$me Report #
- j v
Prevent Recurrence 2
g U
Q 1
1 2/7/86 S
504* B,C See I easons Annual Refueling and Mainten-at rj ght.
ance, Split Pin Modifications, Containment Integrated Leak Rate Test.
- Outage hours in the report period.
1 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 5 E
nav. +ss e-o, II-Other (Explain)
Exhibit I - Same Source
4_
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE March 12. 1986 COMPLETED BY W 2_ 7rt'r1h Andrew E. McNamara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH February. 1986 The unit was taken off line 9 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> on 2/7/86 for Annual Refueling and Maintenance, Split Pin Modifications, Containment Integrated Leak Rate Test, etc.
These activities proceeded through the last day of the report period.
l
GINNA STATION MAINTENANCE REPORT
SUMMARY
FEBRUARY, 1986 During the month of February, routine maintenance and inspections were completed.
Major safety related work included:
l.
"A" Charging Pump Motor / Vari Drive inspection 2.
"B" and "C" Charging Pump Minor Inspection and Belt yReplacement 3.
"A" Diesel Generator Annual Inspection to include clean coolers and fuel oil storage tank - clean, inspect and t
refill 4.
"A" Diesel Generator Air Start Compressor - P.M. Inspection 5.
"A" and "C" Safety Injection Pumps - P.M.
Inspection, "A"
r j
S.I.P. Motor Major Inspection
'l 6.
"B" Aux.
F.W.
Pump - Major Motor Inspection, Pump P.M.
Inspection 7.
"B" Aux. F. W. Pump Lube Oil Pump - Pump and Motor Inspection l
8.
"A" Component Cooling Water Pump - Major Motor Insp.,
P.M.
Inspection 1
9.
"B" Component Cooling Water Pump --Major Motor Insp.,
P.M.
Pump Inspection i
10.
"A" Boric Acid Transfer Pump - P.M.
Insp.
11.
Boric Acid Transfer Pump - P.M.
Insp.
12.
"A-B-C-D" Containment Recirc Fans - P.M.
Insp.
13.
"A" and "B" Reactor Compartment Fans - P.M.
Insp.
)
14.
"B" C.V. Aux. Filtration Fan - P.M.
Insp.
15.
MOV-4008 Valve and Limitorque Insp.
The following valves were overhauled:
V-4317 and V-431B, V-4005, V-4006, V-4007, V-4008, V-4012, V-356, CV-70, PRV-5778, V-843C, AOV-294, MOV-9701A, MOV-9701B.
Valve 4305 was replaced, 60 GPM Letdown Orifice - replaced, Flange / Pipe section replaced on "A" Containment Spray Component Cooling System.
i 4
m l
i MAINTENANCE REPORT
SUMMARY
(continued)
Removed A & B F.W. Flow Orifices for inspection and cleaning.
A, B, & C Safety Injection Pump bearing cooler housing cleaned and inspected.
Inspected / tested H-7 Prz. Snubber and PS6 Prz. Snubber Performed M-40 Snubber Inspection Filter Replaced - Seal Injection, Seal Return, and Reactor Coolant Filters Relief Valve Testing - RV-732, RV-434, RV-435, RV-3562, RV-3563, RV-3564, RV-3565, RV-3566, RV-3567, RV-830A, RV-830B, RV-203, RV-209, RV-861, RV-1817, RV-1818, RV-4654, and M.S. Safety Valves.
1
n0 %;
e o
,e
.s.
- r yo..
ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EAST AVENUE, ROCHESTER, N.Y.146 9 Y E L E.wCN G.
..t.coct rie 5 46 2 700 GINNA STATION March 12, 1986 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555 l
Subject:
Monthly Report for February, 1986 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1986.
Very truly yours, i
Stanley M. Spector
(
Superintendent of Ginna Production SMS/eeg Attachments cc:
Dr. Thomas E. Murley NRC (1)
V