JAMES A. FITZPATRICK NUCLEAR POWER PIANT OPERATING DATA RMOKI DOCKET No.
50-333 UNIT NAME fir 41'AIRICK DATE MAY 1986 COMPLETED BY JOHN COOK TELEPHONE (315)342-3840 OPERATING STATUS 1.
UNIT NAME:
FITZPATRICK 2.
KElvKriNG PERIOD: 860401-860430 3.
LICENSED THERMAL POWER (MWI):
2436 4.
NAMEPLATE RATING (20SS &'E):
883 5.
DESIW ELECTRICAL RATING (NET MWE):
816 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
823 7.
MAXIMLM DEPENDABLE CAPACITY (NET MWE):
796 8.
IF CHANGES OCCUR IN CAPACM RATINGS (I1DS 3 - 7) SINCE IAST KuvKr, GIVE REASONS:
i 9.
POWER LEVEL 10 MHICH RtmIntu, IF ANY (Nt;r MWE):
NONE 10.
REASONS FDR RESTRICTIONS, IF ANY:
THIS FDNTH YR-3D-DATE CUMULATIVE 11.
HOURS IN REPORTING PERIOD:
719 2879 94320 12.
NUMBER OF HOURS REACIOR WAS CRITICAL:
692.7 2524.5 67940.1 13.
REACIOR RESERVE SHUIDOWN HOURS:
0 O__
0 14.
HOURS GENERATOR ON-LINE:
686.1
_ 2434.3 65960.4 15.
UNIT RESERVE SHUIDOWN HO'JRS:
0 0
0 16.
GROSS THERMAL ENERGY GENERATED (MWH):
1563024 5767440 141481114 17.
GROSS ELECTRICAL ENERGY GENERATED (&E):
532500 1968320 48561530 18.
NEr ELECTRICAL ENERGY GENERATED (EE):
514585 1901190 46465715 19.
UNIT SERVICE FACIOR:
95.4 84.6 69.9 20.
UNIT AVAIIABILM FACIOR:
95.4 84.6 69.9 21.
UNIT CAPACITY FACIOR (USING MDC NET):
89.9 83.0 63.7 22.
UNIT CAPACITY FACIDR (USING DER NET):
87.7 80.9 60.4 23.
UNIT FORCED OUTAGE RATE:
4.6 1.3 12.9 24.
SHUrDOWNS SCHEDULED OVER NEXT 6 IONIHS (TYPE, DATE AND DURATION OF EACH):
Planned Maintenance outage lasting approximately 10 days ce mencing late Septer:ber 1986 25.
IF SHUR DOWN AT END OF REPORT PERIOD, ESID4ATED DATE OF STARTUP:
26.
UNITS IN TEST STATUS (PRIOR 10 0@NERCIAL OPERATION):
FDRECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECIRICITY C&NERCIAL OPERATION e605130326 860430 PDR ADOCK 05000333 R
PDR f6dy l,
JAMES A. FITZPATRICK NUCLEAR POWER FI1Mr AVERAGE DAILY UNIT POWER IEEL DOCKET NO.
50-333 UNIT TIT 2PATIECK-DATE MAY 1986 OCNPIEIED BY JUMN GAE TELEPHONE (315)342-3840 MNIH APRIL 1986 i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1
639 17 807:
2 584 18 803
^
3 612 19 805 4
698 20 807 5
0 21 808 6
195 22 806
{
7 431 23 806 8
622 24 806 j
9 771 25 805 10 801 26
-807 l
2 11 801 27 772 P
12 807 28 806 t
13 808 29 805 i
14 808 30 805 l
15 808 31 i
16 807 SltNARY: The FitzPatrick plant operated at near full thermal power for this reporting period with one trip during Turbine stop valve testing.
i f
e
JAMES A. FITZPATRICK NUCLEAR POWER FIANT UNIT SHUI 1XMNS AND POWER REDUCTIONS DOCKET NO.
50-333 UNIT NAME nm M DATE 1%Y 1986 REPORT FONIH APRIL 1986 COMPLETED BY JUHN wtE TEEPHONE (315)342-3840 D
C UH R
MEIHOD S
O RO E
OF YC MC CAUSE AND CORRECTIVE ACTION AU A
SHUITING LICENSEE SO PO 10 NO.
DATE TYPE TR S
DOWN EVENT TD 0D PREVENT RECURRENCE
.IS O
THE REPORT EE NE O
N REACIOR M
E N
N T
2 860404 F
32.9 B
3 86-010 TA 33 REACIOR SCRAM DURING TURBINE SIDP VALVE TESTING CAUSED BY A FAILURE OF THE 90%
LIMIT SWITCH 10 RESET. REPAIRS WERE OCNFLETED AND THE PLANT RETURNED.70 SERVICE.
1 2
3 4
F: FORCED REASON:
MEIHOD:
EXHIBIT G.- INSTRUCTIONS S: SWEDULED A. EQUIPMENT FAILURE (EXPIAIN) 1-MANUAL FOR PREPARATION OF DATA B. MAINTENANCE OR TEST 2-MANUAL SCRAM ENIRY SHEEIS FOR LICENSEE C. REFUELING 3-AUI0MATIC SCRAM EVENT REPOKE (IER) FILE D. REGUIATORY RESTRICTION 4-CIHER (EXPIAIN)
-(NUREG-0161)
E. OPERAIDR TRAINING AND LICENSE EXAMINATION F. ADMINISTRATIVE G. OPERATIONAL ERROR (EXPIAIN)
H. OIHER (EXPLAIN)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE
~ APRIL.' 1986 The FitzPatrick plant began increasing toward full power operation at the beginning of-the reporting period.
On'860404, the unit tripped during turbine stop valve testing.
The. plant scram was attributed to failure of the stop valve limit switch to reset after testing.
Repairs were affected and the unit returned to service on 860406.
At the end of the reporting period the FitzPatrick plant is operating at approximately 805 MWe.
t f
i f
.(
w
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
g APRIL 1986 ACTION TAKEN REPAIR WORK RFQUEST NO.
HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTDI COMPONENT NO.
DETECTED MALFUNCTION MALFUNCTION RECURRENCE
' HOURS 860405 00 030645 I&C POSSIBLE NDISE CHECK CONNECTIONS TIGfIDED TERMINALS 4~
ATHDMI SOURCE RR TIGIINESS 4,14, AND 15 860319 02 023016 I&C
}0D M1-84-080 REPIACE RELAYS ON CHANGED REIAYS PER 10D N4 -
AD!nFK'S ADS SYSTEM 860405 03 041823 OPS USE/ WEAR ROD SELECT PUSH-REPLACED SWITCH 6
PB-22-35 BITTION IS BAD 860409 03 041550 OPS BAD PROBE DUAL INDICATION.
REPIACED PROBE 7
PI-06-15 BUFFER CARD N0r WORKING BUFFER CARD 860424 03 043190 I&C LEITER FROM TORQUE CHECK 10RQUED PER'ISP-66-l-15
~
LS-231A,B,E,F MAGETROL ENCIDSE TUBE NUr 860414 05
'041566 I&C SWITCH N0r SHOR INVESTIGATE CAUSE CHANGED 5A-K10H and 76 R P. S VALVE FULL OPEN OF RX SCRAM 94-PNS-104 860318 07 041773 OPS DAMAGED DURING CABIE NEEDS REPIACED CABLE AND 35-SRM-D CRD CHANGEOUT REPAIR DETECIOR 00tN UTS 860326 07 032898
-I&C BROKEN WIRE DRIVE BIDWS FUSE RESOIDERED BROKEN WIRE 15 IRM-H AT 10VENENT
E 4'.
NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
APRIL 1986 I
A
- ACTION.TAKEN
- REPAIRS WORK REQUEST NO.
HOW CAUSE OF RESULTS OF' TO PRECLUDE TIMEc DATE SYSTEM COMPONENT NO.
- DETECTED MALFUNCTION-MALFUNCTION
. RECURRENCE 4
_ HOURS.,
860404 07 041818 OPS BAD BIACK PEN RECORDER N0r REPIACED BUCK PEN" 6'
lY'EEK AMPLIFIER RESP 0tO TO AMPLIFIER SIQ4AL 860414 07 041634 OPS N/A INOP LIGff STAYS-IMP-7.6LNO PROBLEM -
.4-XPl5EU DE-ENERGIZED FOUND 860407 10 030609 I&C METE OUT OF CAL NEEDS RECALIBRA-RECALIBRATED PER 6'.~
FT-109B (IC-G71)
TION
- IMP 10.2' 860401 16 032830 I&C RELAY CONTACTS REPAIR / TEST, REPUCED CONTACT 9/10 -
12 15A K7b BENT REIURN TO STOCK 860408 16 041579 I&C
. USE RESET SWITCH NEEDS INSTALLED GASKET,.
-2.
16A-S33 TIQfIENING
. TIGHTENED 860410 17-032531-
. OPS PSP-23 RESET AIARM CHAN 2 D HI At0 HI HI4
. 16'-
j.
REGI35K,B
- (RES PROCEDURE),
SErrINGS SETPOINES j
u:-
l 860408 70 030495
- OPS DRIFT
'100,103,104A/B ADJUSIED:70-TS-100's:
-16
'!51W N0r PODUUEE SEIPOINr' 4
r 860417 ~
70 030819 OPS
. 70-DPT-100 OUT PEGS HIGI MEN IT RECALIBRATED DMO
. OF CALIBRATION '
SHOUID N0r-70-DFT-100L 26 j
I e
1
.c,_,ns.-i-u--,
w--c,~,ww.,-..ww..,
=-.,sr
.,----as,r-rw wwww -me weg
.w w. w w w + -
p y-.
,,w--,y
,s+rwe,,---w-vw,--m-.mme,,-,-,v+-
w+
+- -
- e a,w-,e--,,
.g
+y+
t
. -,.i, m
s e
..-s_.
s.
i i
NEW YORK POWER AUTHORITY j
JAMES A. FITZPATRICK-NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
/+-
APRIL 1986 i
e i
i ACTION TAKEN
. REPAIR I
WORK REQUEST NO.
HOW CAUSE OF RESULTS OF TO PRECLUDE
-TIME 1
DATE SYSTEM COMPONENT NO.
DETECTED MALFUNCTION.
MALFUNCTION
-RECURRENCE HOURS i
860417 76 041719 OPS GROUtOER AT 002 IDCKDUT LIGfr RDOVED ' AND.
40 i
-ny TB20-TERHDIAL 20 N0r INDICATE.
REINSTALLED WIRE 860421 76 041543 OPS OPEN REAY 00IL (XNTINUOUS AIARM REPIACED SR-32 MODULE 20' I
NO ON ION DETECT l-860331 93 033119 JTS 10D F1-84-041 CHANGE CONTACTS CHANGED CONTACTS:-
26' 27-Tzx ON REULYS AILTUSTED i-860417'
- 93 031746 OPS EXPIRED SHELF REPIACE RUBBER INSTAILED REBUIID 17 EDG LIFE PRODUCTS KITS 860406 94
-041574 I&C IRIFT INVESTICATE/ REPAIR ADJUSTED SWITCH; 6.-
PIE IU4 90% LIMIT SWITCH ISP-37:
e i.
860425
- 02-1 041832
' OPS!
BROKEN WIRE ON AttRNCIAIOR DOES PUT NEW WIRE IN:
23 ~
09-5-2-14 BUFFER CARD NUr AIARM REDID S0WER
.i 1
4-860310 02-3 032823 I&C 02-3-LT-57B TRIP UNIT READING-RECALIBRATED PER 3
i-PflU 157B WAS OUT OF IDW ISP-201B l
CALIBRATION 860331 02-3 041894 I&C 02-3-LT-73' IARGE DIFFERENCE REPIACE LT-73
.13 j
LT-73 & 79 IDST OIL BETWEEN 'DMIR j
i J
- +.
,.w..
....,..3r---.
7 or cm..
w,.
.,v.
y v...,
.,_v._v.
,.sv-
,,s, m
h
,w
,m NEW YORK POWER AUTHORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
APRIL 1986 ACTION TAKEN REPAIR WORK REQUEST NO.
HOW CAUSE OF RESULTS OF TO PRECLUDE
-TIME l
DATE SYSTDI COMPONENT NO.
DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS-860411 16-1 041584 OPS BAD PRINI DOES IUr PRINT REPIACED PRINT 32 DPR-200 MECHANISM OUT ON CHART MEDIANISM Y
NEW YORK POWER AUIEORITY JAMES A. FITZPATRICK NUCLEAR PWER PIANT SAFELY RELATED FIFCTRICAL & MECHANICAL MAINTENANCE SONARY APRIL 1986 REPA1R kDRK REQUEST #
TIME DATE SYSTm CmPONENT HOR DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE HOURS 4/17 70 30531 OPS Failed Motors.
Replaced Dampers.
30 FDD-113 & 114
____=.
=_==__-.------------------------------------------------------------=__ _= ------------------------------
4/17 76 30731 OPS Failed T2 Relay.
Replaced Relay.
6 P-1
=
4/11 00 21128 PM None Accessible Snubber Inspection.
48 Snubbers
=_
_ ---------------------===__ _ _ _
4/29 27 41560 OPS Broken Lead.
Re-terminated Imad.
8 SOV-135A
==__=_===- ----------------------------------------------------------------------------------------------------
4/25 27 30813 OPS Failed Heat Trace.
Replaced Heat Trace.
27 DWA-B
?
James A. FitaPatrick.
Nuclear Power Plant l
Ro. Box 41 Lycoming, New York 13093 I
315 342.3840 Radford J. Converse
- > NewYorkPbwer tv Authority May 8, 1986 JAFP 86-406 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:
DOCUMENT CONTROL DESK
REFERENCE:
DOCKET NO. 50-333 i
Dear Sir:
Enclosed please find the J.
A.
FitzPatrick Operating Status Report for the month of April, 1986.
Refueling information remains the same as previously submitted.
If there are any questions concerning this report, please contact John Cook at (315) 342-3840, Ext. 439.
~A.W RA FORD J. CONVERSE RESIDENT MANAGER RJC:JPC:mac Enclosures cc:
Distribution Y
a L
.