ML20197C222
| ML20197C222 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/08/1986 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20197C228 | List: |
| References | |
| NUDOCS 8605130264 | |
| Download: ML20197C222 (2) | |
See also: IR 05000423/1986009
Text
,
..
.s
e:
.
MAY 0 81966
Docket No.
50-423
License No. NPF-49
Northeast Nuclear Energy Company
ATTN:
Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford,. Connecticut 06141-0270
Gentlemen:
Subject: Inspection Report No. 50-423/86-09
This refers to the routine safety inspection conducted by J. Prell of this
office on February 18 - March 14, 1986, at the Millstone Nuclear Power Station
Unit 3, at Waterford, Connecticut, of activities authorized by NRC License No.
NPF-49 and to the discussions of our findings held by Mr. P. Wen with Mr. D.
Mc Daniel of your staff at the conclusion of the inspection and a telephone
discussion between Mr. L. Bettenhausen and Mr. J. Crockett on May 7,1986.
-Areas examined during this inspection are described in the NRC Region I Inspec-
tion Report which is enclosed with this letter. Within these areas, the inspec-
tion consisted of selective examinations of procedures and representative re-
cords, interviews with personnel, and observations by the ' inspector.
Based on the results of.this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
.
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the revised NRC Enforcement
Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR
,
8583) dated March 8, 1984. You are required to respond to this letter and in
preparing your response, you should follow the instructions in Appendix A.
The responses directed by this letter and the accompanying Notice are not sub-
ject to the clearance procedures of the Office of Management and Budget as re-
~
quired by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
k
hh
23
Original Signed By:
g
Lee H. Battenhaur,en
Stewart D. Ebneter, Director
/
Division of Reactor Safety
Enclosure: NRC Region I Inspection Report No. 50-423/86-09
0FFICIAL RECORD COPY
IR MILL 3 86-09 - 0001.0.0
05/07/86
froid
-. .
Northeast Nuclear Energy Co.
2
_
'
cc w/ encl:
4 . Papadopoli, Construction Quality Assurance Supervisor
-E. R. Foster,- Director of_ Generation Construction
- E. J. Mroczka, Vice President, Nuclear Operations
1. 0.- Nordquist, Manager of Quslity. Assurance
--'R
T.-Laudenat, Manager, Generation Facilities Licensing
- W . D. Romberg,.' Station Superintendent
Public Document Room (PDR)
local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
4 RC Senior Resident Inspector
- State of Connecticut
bec w/ encl:
- Region I Docket Room (with concurrences)
M anagement Assistant, DRMA (w/o encl)
DRP Section Chief
_
G. Walton, SRI, BV-2
c
T. Shedlosky, SRI, Millstone 1&2
4 . Doolittle, LPM,-NRR
LL ca
hausen
O
ytta 18s
pi iss
hitci8s
r/7/t((
5 , 86
.
OFFICIAL RECORD COPY
IR MILL 3 86-09 - 0002.0.0
04/01/86
.
---4