Forwards Safety Insp Rept 50-423/86-09 on 860218-0314 & Notice of Violation
ML20197C222
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/08/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20197C228 List:
References
NUDOCS 8605130264
Download: ML20197C222 (2)


See also: IR 05000423/1986009

Text

,

..

.s

e:

.

MAY 0 81966

Docket No. 50-423 License No. NPF-49

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford,. Connecticut 06141-0270

Gentlemen:

Subject: Inspection Report No. 50-423/86-09

This refers to the routine safety inspection conducted by J. Prell of this

office on February 18 - March 14, 1986, at the Millstone Nuclear Power Station

Unit 3, at Waterford, Connecticut, of activities authorized by NRC License No.

NPF-49 and to the discussions of our findings held by Mr. P. Wen with Mr. D.

Mc Daniel of your staff at the conclusion of the inspection and a telephone

discussion between Mr. L. Bettenhausen and Mr. J. Crockett on May 7,1986.

-Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. Within these areas, the inspec-

tion consisted of selective examinations of procedures and representative re-

cords, interviews with personnel, and observations by the ' inspector.

Based on the results of.this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

.

Notice of Violation, enclosed herewith as Appendix A. This violation has been

categorized by severity level in accordance with the revised NRC Enforcement

,

Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR

8583) dated March 8, 1984. You are required to respond to this letter and in

preparing your response, you should follow the instructions in Appendix A.

The responses directed by this letter and the accompanying Notice are not sub-

ject to the clearance procedures of the Office of Management and Budget as re- ~

quired by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

k

g

hh

PDR

23 Original Signed By:

Lee H. Battenhaur,en

Stewart D. Ebneter, Director

Division of Reactor Safety

/

Enclosure: NRC Region I Inspection Report No. 50-423/86-09

0FFICIAL RECORD COPY IR MILL 3 86-09 - 0001.0.0

05/07/86

froid

-. .

Northeast Nuclear Energy Co. 2

_

'

cc w/ encl:

4 . Papadopoli, Construction Quality Assurance Supervisor

-E. R. Foster,- Director of_ Generation Construction

- E. J. Mroczka, Vice President, Nuclear Operations

1. 0.- Nordquist, Manager of Quslity. Assurance

--'R T.-Laudenat, Manager, Generation Facilities Licensing

- W . D. Romberg,.' Station Superintendent

Public Document Room (PDR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

4 RC Senior Resident Inspector

- State of Connecticut

bec w/ encl:

- Region I Docket Room (with concurrences)

M anagement Assistant, DRMA (w/o encl)

DRP Section Chief

_

c G. Walton, SRI, BV-2

T. Shedlosky, SRI, Millstone 1&2

4 . Doolittle, LPM,-NRR

LL ca hausen O #

ytta 18s pi iss

5 , 86

hitci8s r/7/t((

.

OFFICIAL RECORD COPY IR MILL 3 86-09 - 0002.0.0

04/01/86

.

---4