ML20197C141
| ML20197C141 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/17/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20197C146 | List: |
| References | |
| NUDOCS 8610310202 | |
| Download: ML20197C141 (3) | |
See also: IR 05000424/1986087
Text
'.'i
/gj h
"*
.c'
)
October 17, 1986
1
Docket No. 50-424
License No. CPPR-108
Georgia P
r Company
ATTN:
r. J. H. Miller, Jr.
President
P. O. Box 4545
-Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NO. 50-424/86-87
This refers to the Nuclear Regulatory Commission (NRC)' inspection conducted by
L. H. Jackson on September 22-26, 1986.
The inspection included a review of
activities authorized for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(original signed by)
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/ enc 1:
(See page 2)
8610310202 861017
ADOCK 05000424
G
16
\\
,
,
--
,
'
s
,
.
Georgia Power Company
2
October 17, 1986
,cc,w/ encl:
'~ ~ ~~
~~
W. P 0'Reilly, Senior Vice President
lear Operations
. E. Conway, Senior Vice President &
/ Pr ject Director
D
. Foster, Vice President, Project
Support
P,.
D. Rice, Vice President, Project
Engineering
H. Pinson, Vice President, Project
A nstruction
VJ. T. Beckham, Vice President &
A eneral Manager - Operations
V R. A. Thomas, Vice President,
ticensing
N S. Read, General Manager,
uality Assurance
W. Hayes, Vogtle Quality
Assurance Manager
W. C. Ramsey. Manager -
Readiness Review
d B. Bockhold, General Manager,
Juclear Operations
W. Gucwa, Manager, Nuclear Safety
- and Licensing
d H. Googe, Project
C nstruction Manager
. D. Groover, Quality
Assurance Site Manager -
nstruction
. A. Bailey, Project Licensing
f
Maf ger
0;A. Trowbridge, Esq. , Shaw,
ttman, Potts and Trowbridge
B. W. Churchill, Esq., Shaw,
,
' Pi tman, Potts and Trowbridge
. Blake, Jr. , Esq. , Shaw,
.
fittman, Potts and Trowbridge
1-(. E. Joiner, Troutman, Sanders,
Jockerman and Ashmore
( 6. G. Ledbetter, Commissioner,
partment of Human Resources
. H. Badger, Office of Planning
d Budget
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
.
Jouncil
Lif. Feig, Georgians Against
,'
Nuclear Energy
(ce w/enci cont'd - see page 3)
r
'
s-
,
.
Georgia Power Company
3
October 17, 1986
(cc w/ enc 1 cont'd)
,_
,B. Margulies, Esq., Chairman,
W.
Atomic Safety and Licensing Board
Pynel
\\JV. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
.
inenberger, Jr. , Administrative Judge
Atomic Safety and Licensing Board
arde, Citizens Clinic, Director
Government Accountability Project
w/ enc 1:
Reis, GS0
Hill, IE
.
iller, NRR
Brach, GSO
Sinkule, RII
.,Christnot, RII
/ C Resident Inspector
Document Control Desk
State of Georgia
,
RII
RII
RII
RII
RII
RII
/
0
RGibbs
LJackson
ABelisle
CJ '
c era
%
n
10/9/86
10/9/86
10/9/86
10/g/86
10/
/86
/Vl
/ Tb
RII
RII
RII
RGibbs:er
LJacEson
ABelisle
10/ /86
10/ /86
10/
/86
7
L