Provides Schedule for Procurement,Installation & Testing of Sixth Seismic Monitor,Per 860911 Meeting.Location for Monitor Provided in Util .Sixth Monitor Will Be Operational by 870301
ML20197B274
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/17/1986
From: Miosi A
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
2290K, NUDOCS 8610280333
Download: ML20197B274 (1)


Text

Commonwealth Edison One First National Plaza, Chicago, l'inois m'

Address Reply tx Post Omco Box 767 Chicago, Illinois 60690 - 0767 October 17, 1986 Mr. Harold R. Denton, Director office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC. 20555

Subject:

Braidwood Station Units 1 and 2 Final Draft Technical Specification i

Seismic Instrumentation System NRC Docket Nos. 50-456 and 50-457 References (a): September 15, 1986 letter from A. D. Miosi to H. R. Denton (b): September 29, 1986 letter from A. D. Miosi to H. R. Denton De ar Mr. Denton:

1 The purpose of this letter is to provide you with a schedule for the procurement, installation and testing of the sixth seismic monitor at Braidwood Station. During a meeting on September 11, 1986 with members of ycur staff, we agreed to install this monitor and provide you with a schedule for installation as presented in Reference (a). The location of the monitor was given to you in Reference (b). Our commitment is to have this sixth seismic monitor operational by March 1, 1987, please contact this office if you have any questions concerning this matter.

One signed original and fifteen copies of this letter are provided for your review.

Very truly yours, AV A. D. Miosi Nuclear Licensing Administrator 1st l