Responds to Violations Noted in Insp Rept 50-395/86-05. Corrective Actions:Mgt Duty Supervisor Received Required Emergency Plan Training on 860314
ML20197A995
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/23/1986
From: Nauman D
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8605120435
Download: ML20197A995 (2)


Text

,'

gm, Cap DecMc & Gas Company gn A. Na n

agu g g m ia Newar opo auons SCE&G April 23, 1986

...30 ND
36 Dr. J. Nelson Grace Regional Administrator U. S. Nuclear Regulatory Commission Region II Suite 2900 101 Marietta Street, N.W.

Atlanta, Georgia 30323

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Response to Notice of Violation NRC Inspection Report 86-05

Dear Dr. Grace:

Attached is South Carolina Electric and Gas Company's response for the violation as addressed in Enclosure 1 of NRC Inspection Report 86-05.

If there are any questions, please call us at your convenience.

Ver truly 6Urs, 4

. Na an HID: DAN / led Attachment pc:

0. W. Dixon, Jr./T. C. Nichols, Jr.

C. L. Ligon (NSRC)

E. H. Crews, Jr.

R. M. Campbell E. C. Roberts K. E. Nodland J. G. Connelly, Jr.

R. A. Stough W. A. Williams, Jr.

G. O. Percival Group Managers R. L. Prevatte

0. S. Bradham J. B. Knotts, Jr.

D. R. Moore I&E Washington C. A. Price NPCF W. T. Frady File 8605120435 e60423 PDR ADOCK 0500 5

[

-r

> 4 ENCLOSURE 1 RESPONSE TO VIOLATION 395/86-05-07 I.

ADMISSION OR DENIAL OF THE ALLEGE 0 VIOLATION i

South Carolina Electric and Gas Company (SCE&G) is in agreement with the alleged violation.

II.

REASON FOR THE VIOLATION A special one time training class was conducted for key emergency response personnel relative to the new fission product barrier method of event classification in accordance with procedure EPP-018; however, one Management Duty Supervisor was unable to attend the class and was not rescheduled for training at a later date.

1 I

III.

CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED l

The' licensee has taken the following corrective action. The subject individual received the required training on March 14, 1986 and demonstrated an acceptable knowledge level.

IV.

CORRECTIVE ACTION TAKEN TO AVOID FURTHER VIOLATION l

The failure to reschedule the training was an isolated case since the remaining key personnel received their training; however, the Site Emergency Coordinator (SEC) has been assigned the responsibility to assure that when special Emergency Planning training is required the designated personnel are scheduled for training, attend the session (s), and successfully complete the training. Designated l

personnel will be required to notify the SEC whenever they are unable l-to attend training in order that their training can be rescheduled.

In addition,-the new fission product barrier method is now part of the j

-annual Emergency Planning Training Program.

l V.

DATE OF FULL COMPLIANCE SCE&G was in full compliance with respect to the stated corrective j

action as of March 14, 1986.

l e