ML20197A882
ML20197A882 | |
Person / Time | |
---|---|
Issue date: | 02/27/1998 |
From: | Roe J NRC (Affiliation Not Assigned) |
To: | Collins S, Miraglia F, Zimmerman R NRC (Affiliation Not Assigned) |
References | |
NUDOCS 9803100020 | |
Download: ML20197A882 (7) | |
Text
.
. february 27, 1998 MEMORANDUM T0: -NRR Division Directors (See Attached List)
FROM: Jack W. Roe, Acting Director Original Signed Byt Division of Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
OMB REVIEW 0F ACTIONS COVERED BY THE SMALL BUSINESS REGULATORY ENFORCEMENT FAIRNESS ACT-l T!iGenericissues;andEnvironmentalprojectsBranch(PGEB)isresponsiblefor collecting and reviewing'the NRR input of final actions covered by the Small Business Regulatory Enforcement-Fairness Act (SBREFA) before forwarding it to the Rules Review and Directives. Branch (RRDB). The typical NRR actions i
l covered by the ACT. as advised by the OGC; include final rules, regulatory guides, standard review plan, branch technical positions, bulletins and generic letters that' provide new interpretations of law or policy. -and inspection manuals that substantially affects rights or obligations of non- '
agency parties etc.. After collecting all NRC offices' input, the RRDB will submit-it to OMB-for review, as required by the Act.
To ensure compliance with the Act, please prepare a summary description of each-final action for which -your _ division -is responsible and for which-the anticipated issue date is within 90 days after the date of this memorandum.-
A blank form of summary description is attached for your- use (Attachment 1).
Suninary descriptions should be provided via E-mail to Peter Wen (E-mail address: PXW) by March 12, 1998. Attat.hment 2 includes a list of previously -
submitted NRR items that-have been identified as potential " rules"~ under
-SBREFA. These items need not be resubmitted.
If-you or your staff have any questions regarding:this request, please contact Peter Wen at 415-2832.
Attachments: As stated DISTRIBUTION: See attach page
? . 8- ,.
0FFICE PM: PGEB SC:PGEB d h (A) [k (4)D;DPRM phO ;i NAME PWen:swpd I FAkst M bz TEhig[ R[e ,(
DATE 246/98 #
)2/4 /98 2//f/98 2/ 'I/98 h 0
- gga ggg2o ggga7 PDR "8 E
- 5 SEN53 ggr c,!Ap-]$
~" ll ll llll1,1llllll 4 DILh . . _ .
. _ _ ~ . . _ _ _ _ _ _ _ _ . . _ _ _ _ .
, pa atroq po .% UNITED STATES o B- NUCLEAR F1EGULATORY COMMISSION WASHINGTON, D.C. 3056H001
\*****f February 27, 1998 MEMORANDUM T0: NRR Division Directors (See Attached List)
FROM: Jack . , h ng Director Divic on of Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
OMB REVIEW 0F ACTIONS COVERED BY THE SMALL BUSINESS REGULATORY ENFORCEMENT FAIRNESS ACT The Generic Issues and Environmental Projects Branch (PGEB) is responsible for collecting and reviewing the NRR input of final actions covered by the Small
-Business Regulatory Enforcement Fairness Act (SBREFA) before forwarding it to the Rules Review and Directives Branch (RRDB). The typical NRR actions covered by the ACT as advised by the OGC, include final rules, regulatory guides. standard review plan, branch technical positions. bulletins and generic letters that provide new interpretations of law or policy, and inspection manuals that substantially affect rights or obligations of non-agency parties, etc., After collecting all NRC offices
- input, the RRDB will submit it to OMB for review, as requirol by the Act.
To ensure compliance with the Act, please prepare a summary description of each final action for which your division is responsible and for which the anticipated itsue date is within 90 days after the date of this memorandum.
, A blank form of summary description is attached for your use (Attachment 1).
Summary descriptions should be provided via E-mail to Peter Wcn (E-mail address: PXW) by March 12,1998. Attachment 2 includes a list of previously submitted NRR items that have been identified as cotential " rules" under SBREFA. These items-need not be resubmitted.
If'you or your staff have any questions regarding this request, please contact Peter Wen at-415-2832.
" Attachments: As stated 4
j
e DATE:
AGENCY: NUCLEAR REGULATORY COMMISSION TITLE OF ACTION:
LEVEL OF SIGNIFICANCE:
UPCOMING ACTION:
AGENCY IDENTIFICATION:
DATE OF ISSUANCE:
STATUTORY OR JUDICIAL DEADLINE:
DESCRIPTION OF ACTION:
l AGENCY CONTACT:
6 Attachment 1
+
, NRR ACTION ITEMS SUBMITTED TO RRDB/ADM FOR COMPLYING WITH THE SMALL BUSINESS REGULATORY ENFORCEMENT FAIRNESS ACT ltem # AgencyID Title Type of Action Contact 1 M91404 TS Improvements Related to Administrative Controls and Non-Major Rule JShapaker Reporting Requirements 2 M91544 Revised Contents of the Monthly Operating Report Non-Major Rule JShapaker 3 M95279 Modification of Staff Recommendations for the Post-Accident Non-Major Rule JShapaker Sampling System ,
KParczewsid 4 M95280 Primary Water Stress Corrocion Cracking of C e rol Rod Drive Non-Major Rule . JShapaker Mechanism and Other Vessel Head Penetraticx KWichman 5 M95373 Effectiveness of Ultrasonic Testing Techniques in Inservice Non-Major Rule JShapaker Inspection Programs 6 NUREG- Status Report Intergranular Stress Corrosion Cracking of Non-Major Rule JMedoff 1544 BWR Core Shrouds and Other internal Components 7 - Steam Generator inspection Procedure Non-Major Rule ESu!!ivan 8 -
Enforcement Guidance Memorandum for Steam Generator Non-Major Rule ESullivan Tube inspections 9 - Approval of lodustry Guidance on Probe Wear Criteria Non-Major Rule ESu!!ivan 10 NUREG- BWR Steel Containment Corrosion Non-Major Rule CPTan 1540 11 TR-103237 Safety Evaluation of EPRI Topical Report TR-103237,"EPRI Non-Major Rule TScarbrough MOV Performance Prediction Program" 12 TR-10232 Safety Evaluation Report for EPRI Topical Report TR-10232, Non-Major Rule JWermiel
" Guideline for Electromagnetic Interference Testing in Power Plants" Attachment 2 u-----.
Item # AgencyID Title Type of Action Contact 13 - SER for Westinghouse Owners Group Topical Reports WCAP- Non-Major Rule JWermiel 13878 Rev 1 (Proprietary) and WCAP-14117. Rev 1 (Non-Proprietary)," Reliability Assessment of Potterand Brumfield ;
Relays," and WCAP-13900, Rev 0," Extension of Slave Relay Surveillance Testing Intervals." j i
14 RG 1.149, Nuclear Power Plant Simulation Faciities for Use in Operator Non-Major Rule SRichards Rev 2 License Examinations 15 PN 683 Management of the Effects of Aging of the B&W Reactor Non-Major Rule RAnand Coolant System Piping during any Period of Extended -
Operation 16 3150-AE96 Decommissioning of Nuclear Power Reactors Non-Major Rule CYates 17 -
Guidance to NRC Staff on Emergency Planning Information Non-Major Rule CMiller Provided to the Public 18 Sup 2 to issuance of Supplement to NUREG-0654/ FEMA-REP-1 Non-Major Rule CMiller NUREG-0654/ FEMA-REP-1 19 - Interim Guidance for Communications during Plant Restart Non-Major Rule CMiller following Severe Natural Events 20 IP 82301 Revision of Core Inspection Procedures in Response to Public Non-Major Rule LCohen IP 82701 Responsiveness initiative 21 RG 1.82, Water Sources for Long-Term Recirculation Cooling Following Non-Major Rule MMarshall Rev 2 a Loss-of-Coolant Accident _
22 M97146 Potential for Degradation of Ernergency Core Cooling Non-Major Rule RLobel Recirculation Foi!owing a Loss-of-Coolant Accident due to JShapaker Foreign Materialin the Containment
. t i
item # AgencyID Title Type of Action Contact 23 RG 1.160 Requirements for Monitoring the Effectiveness of Non-Major Rule TABeiyiei l Rev 2 Maintenance at Nuclear Power Plants 24 M95773 Safety Evaluation Report for B&W Owners Group Topical Non-Major Rule JWermel Report BAW-10167, Supplement 3," Justification for j increasing Reactor Trip System On-line Test Intervals"
, 25 M94840 Changes in the Operator Licensing Program Non-Major Rule SGuenther 26 MD 8.14 Management Directive 8.14. " Senior Management Meeting" Non-Major Rule PICastleman 27 Chp 7 of Revision to Standard Rev ew Plan (SRP), NUREG-0800, Non-Major Rule MChiramal NUREG- Chapter 7, Instrumentation and Control Systems l 0800, ;
Rev4 '
28 M99271 GL 91-18 Rev 1,"Information to Licensees Regarding NRC Non-Major Rule EMcKenna Inspection Manual Sectx>n on Reso'ution of Degraded and JShapaker i Nonconforming Conditions" 29 M96504 Final Rule Amending the Fitness-For-Duty Rule Non-Major Rule LBush 30 NUREG-1611 Aging Management of Nuclear Power Plant Containments for Non-Major Rule PTKuo
, License Renewal RAnand l
31 NUREG-1574 Final Standard Review Plan for Antitrust Reviews Non-Major Rule MJDavis i 32 Chp 16.1 of Addition to Standard Review Plan, NUREG-0800, Chapter- Non-Major Rule N.Gilles NUREG-0800 16.1, Risk-informed Decisionmaking: Technical Sppecifications 33 MA0138 GL- Year 2000 Readiness of Computer Syatems at Nuclear Non-Major Rule MChiramal Power Plants JShapaker ,
i i
i
Distribution: MEMO RE SMALL BUSINESS REGULATORY- DATED Jebruary_27 _1998___._
CEntfal' File S. Collins (0 12-G 18)
F. Miraglia (0 12 G-18)
R. Zimmerman (0 12 G-18)
- 8. Boger B. Sheron (0 12-E-22)
J. Roe D. Matthews W. Beckner C. Miller T. Essig S. Richards R. Rosano C, Grimes S. Weiss T. Quay R. Borchardt (0 12-E-1)
M. Case M. Boyle (0-14-E-4)
R. Pedersen (013-E-4)
P. Cota (0-0-E-2)
A. Mendioloa (0-9-E-4)
K.- Karwoski (0-7-D-4)
J. Shapaker PGEB R/F
_ _ _ _ - -