OCT 211986
.
Docket No. 50-309
Maine Yankee Atomic Power Company
ATTN: Mr. J. B. Randazza
Vice President
Nuclear Operations
83 Edison Drive
Augusta, Maine 04336
.
Gentlemen:
Subject:
Inspection No. 50-309/86-14
A routine safety inspection of your annual emergency preparedness exercise was
conducte.! by Mr. Thomas of this office and other members of an NRC team on
September 23, 1986 at the Maine Yankee Atomic Power Plant, Wiscasset, Maine.
Discussions of our findings were held by Mr. Thomas with your staff at the
conclusion of the inspection.
Areas examined during this inspection included followup of findings identified
during previous emergency preparedness inspections an1.uercises as described
in the NRC Region I inspection report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examination of pro-
cedures and representative records, interviews with personnel and observation
of the emergency exercise by team members.
Within the scope of this inspection, no violations were observed, and your
emergency response actions were adequate to provide protective measures for
the health and safety of the public. However, observations made by the NRC
team revealed a deficiency in one area which requires your prompt attention.
We are . concerned about the lack of a methodology to include an estimation of
iodine contribution to the source term in initial dose projections and
subsequent protective action recommendations.
In addition, we found that
protective measures for Maine were primarily based upon dose projection data,
while potential degradation of plant and core conditions were not adequately
considered.
1
8610270357 861021
~
ADOCK 05000309
,
G
f
'I
OFFICIAL RECORD COPY
IR MY 86-14 - 0001.0.0
10/10/86
..
.
. _ . . _ _ _ . .
4
Maine Yankee Atomic Power Company
2
We request that you provide a written response within 30 days of receipt of
this letter detailing your proposed actions to upgrade performance in this
area. Your cooperation with us in this matter is appreciated.
Sincerely,
g , . -q : *e .
'"78
'
ar i
e
vision of Radiation Safety
and Safeguards
,
,
Enclosure: NRC Region I Inspection Report No. 50-309/86-14
cc w/ enc 1:
C. E. Monty, President
C. D. Frizzle, Assistant Vice President / Manager of Operations
J. H. Garrity, Plant Manager
P. L. Anderson, Project Manager
G. D. Whittier, Licensing Section Head
J. A. Ritsher, Atturney (Ropes and Gray)
Phillip Abrens, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
'
NRC Resident Inspector
State of Maine
4
bcc w/ encl:
!
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
'
DPRP.Section Chief
M. McBride, RI, Pilgrim
H. Eichenholz, SRI, Yankee
P. Sears, LPM, NRR
Robert J. Bores, DRSS
FEMA, RI
,
N
RI:
RI:DRSS
RI:DRSS
RI:DRSS
i
b
Conklin
La arus
Bellamy
/86
/I
0FFICIAL RECORD COPY
IR MY 86-14 - 0001.1.0
10/10/86
N3[
. - . .
- --
, - - . -
- . - - - - -
- . .
- . - - - - - . - . , . -
-
.~-_-,.
- - .