Forwards Safety Insp Rept 50-309/86-14 on 860923.No Violation Noted.Deficiency Identified Re Lack of Methodology to Include Estimation of Iodine Contribution to Source Term in Initial Dose Projections.Response Requested
ML20197A641
Person / Time
Site: Maine Yankee
Issue date: 10/21/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Randazza J
Maine Yankee
Shared Package
ML20197A646 List:
References
NUDOCS 8610270357
Download: ML20197A641 (2)


See also: IR 05000309/1986014

Text

.

!

.

OCT 211986

.

Docket No. 50-309

Maine Yankee Atomic Power Company

ATTN: Mr. J. B. Randazza

Vice President

Nuclear Operations

83 Edison Drive

. Augusta, Maine 04336

Gentlemen:

Subject: Inspection No. 50-309/86-14

A routine safety inspection of your annual emergency preparedness exercise was

conducte.! by Mr. Thomas of this office and other members of an NRC team on

September 23, 1986 at the Maine Yankee Atomic Power Plant, Wiscasset, Maine.

Discussions of our findings were held by Mr. Thomas with your staff at the

conclusion of the inspection.

Areas examined during this inspection included followup of findings identified

during previous emergency preparedness inspections an1.uercises as described

in the NRC Region I inspection report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examination of pro-

cedures and representative records, interviews with personnel and observation

of the emergency exercise by team members.

Within the scope of this inspection, no violations were observed, and your

emergency response actions were adequate to provide protective measures for

the health and safety of the public. However, observations made by the NRC

team revealed a deficiency in one area which requires your prompt attention.

We are . concerned about the lack of a methodology to include an estimation of

iodine contribution to the source term in initial dose projections and

subsequent protective action recommendations. In addition, we found that

protective measures for Maine were primarily based upon dose projection data,

while potential degradation of plant and core conditions were not adequately

considered.

1

~

8610270357 861021

, PDR ADOCK 05000309

G PDR

OFFICIAL RECORD COPY IR MY 86-14 - 0001.0.0 f

10/10/86 'I

.. .

. _ . . _ _ _ . .

4

Maine Yankee Atomic Power Company 2

We request that you provide a written response within 30 days of receipt of

this letter detailing your proposed actions to upgrade performance in this

area. Your cooperation with us in this matter is appreciated.

Sincerely,

g , . -q : *e . '"78

'

ar i e

vision of Radiation Safety

,

,

and Safeguards

Enclosure: NRC Region I Inspection Report No. 50-309/86-14

cc w/ enc 1:

C. E. Monty, President

C. D. Frizzle, Assistant Vice President / Manager of Operations

J. H. Garrity, Plant Manager

P. L. Anderson, Project Manager

G. D. Whittier, Licensing Section Head

J. A. Ritsher, Atturney (Ropes and Gray)

Phillip Abrens, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

'

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maine

4

bcc w/ encl:

! Region I Docket Room (with concurrences)

' Management Assistant, DRMA (w/o enc 1)

DPRP.Section Chief

M. McBride, RI, Pilgrim

H. Eichenholz, SRI, Yankee

P. Sears, LPM, NRR

Robert J. Bores, DRSS

FEMA, RI

,

RI: RI:DRSS

N

RI:DRSS RI:DRSS

i

b Conklin La arus Bellamy

/86 /I

0FFICIAL RECORD COPY IR MY 86-14 - 0001.1.0

10/10/86

N3[

. - . . - -- , - - . - - . - - - - - _ - . . - . - - - - - . - . , . - - .~-_-,. - - .