Forwards Insp Repts 50-327/88-12 & 50-328/88-12 on 880215-19.No Violations Noted.Open Restart Issues Re Civil Calculation Effort Resolved
ML20196L355
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/24/1988
From: Richardson S
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20196L356 List:
References
NUDOCS 8807070391
Download: ML20196L355 (3)


See also: IR 05000327/1988012

Text

_

,g 3

Docket Nos. 50 327/328

>

Tennessee Valley Authority

ATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, Tennessee 37402 2801

Dear Mr. White:

SUBJECT: INSPECTION REPORT NOS. 50 327/88 12 AND 50-328/88-12

This letter forwards the results of a special inspection of the open restart

issues in the civil calculation area for the Sequoyah Nuclear Power Plant

conducted at TVA's Knoxville offices between February 15 and February 19, 1988.

The inspection team reviewed TVA's implenentation of the Sequoyah rigorous pipe

support calculation regeneration effort, TVA's corrective actions related to

open issues on the civil calculation program and specific corrective actions

-

related to open restart items from past NRC team inspections. Based on the

results of this inspection, all open restart issues. relating to TVA's civil

calculation effort were resolved. Although the restart issues were resolved

for Sequoyah, several issues involving TVA's post-restart corrective actions

remain unresolved. These unresolved issues are sumarized in Appendix D of

this inspection report. In addition to the open restart issues in the civil

calculation area this inspection report provides a summary of all open issues

identified in previous design baseline verification program and calculation

> program inspections and identifies the basis or reference for restart closure.

These items are sumarized in Appendices A and B. Several items were closed in

this inspection report based on TVA comitments to perform additional post-

restart actions. These cocinitments are either contained in TVA correspondence

to the NRC which is referenced in the inspection report or verified as entered

in TVA's Corporate Comitment Tracking System.

In accordance with 10 CFR 2.790(a), a r:opy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, please contact me or

Mr. Robert Hermann (301) 492-0706.

Sincerely,

l oriGimi m eed by

l St,evcu L.a h r e on

Steven D. Richardson, Director

l

TVA Projects Division

Office of Special Projects

l

Enclosure: As stated

cc: see next page

TVAt , :0TP:TV :D  :  :

l OFC :TVA:TP:EB

l .....:......

TVA:EB/BC

.:..

..:....f, .. .... q

f...:............:...........:...........

I NAME :JFai :fdi rman :BD,y b T:SRich

rdson :  :  :

.....:............:.............:............:.....-......:........____:.........__:...........

-

6/N/88, :  :

DATE :6/L'/ /88 :6/ alt /88 :6/oM/88  :

, 0FFICIAL RECG'nD COPY ()f/

I 8807070391 880624

, PDR ADOCK 05000327 ( l

t

e r-xse

, .

..,, .,.

...

. ,

. ,

,

Mr. S. A. White

Tennessee Valley Authority -2- Sequoyah Nuclear Plant

,

cc:

Gcneral Counsel Regional Administrator, Region II

Tennessee Valley Authority U.S. Nuclear Regulatory Commission

400 West Summit Hill Drive 101 Marietta Street, N.W.

E11 B33 Atlanta, Georgia 30323

Knoxville, Tennessee 37902

Resident Inspector /Sequoyah NP

Mr. R. L. Gridley c/o U.S. Nuclear Regulatory Commission

Tennessee l Valley Authority 2500 Igou Ferry Road

SN 157B Lookout Place Soddy Daisy, Tennessee 37379

Chattanooga, Tennessee 37402-2801

Mr. Richard King

Mr. H. L. Abercrombie c/o U.S. GA0

Tennessee Valley Authority 1111 North Shore Drive

Sequoyah Nuclear Plant Suite 225, Box 194 '

P.O. Box 2000 Knoxville, Tennessee 37919

Soddy Daisy, Tennessee 37379

' Mr. M. R. Harding Mr. Michael H. Hobley, Director

Tennessee Valley Authority Division of Radiological Health

Sequoyah Nuclear Plant T.E.R.R.A. Building, 6th Floor

P.O. Box 2000 150 9th Avenue North

Soddy Daisy, Tennessee 37379 Nashville, Tennessee 37219-5404

Mr. D. L. Williams Dr. Henry Myers, Science Advisor

Tennessee Valley Authority Committee on Interior

400 West Summit Hill Drive and Insular Affairs

W10 B85 U.S House of Representatives

Knoxville, Tennessee 37902 Washington, D.C. 20515

County Judge

Hamilton County Courthouse

Chattanooga, Tennessee 37402

l

l

l

i

f

.

k

- _ _ . . _ - , - _ . . _ _ . . _ . _ , . _ - .

- -

. . . , . . . ~ _ _ . . . . , . . - . , ,m ..

\

~

ss

r ,.

.

4 ,.

,

Mr. S. A. White

Tennessee. Valley Authority - 3 '- Sequoyah Nuclear Plant

.

SUBJECT: INSPECTION REPORT N05, 50-327/88-12 AND 50-328/88-12

DISTRIBUTION: (w/ enclosure)

s

E'LDC5.(Docket No.50-327/328)

PDR

LPDR

OSP R/F

TVA R/F

'

TVA TP R/F

SEbneter

JPartlow

JAxelrad

SRichardson

BDLiaw

RHermann

FMcCoy, RII

BGrimes, NRR

FMiraglia, NRR

JFair

JDonohew

BHayes, 01

l. Sconnelly, OIA

EJordan, AEOD

l JRutberg, OGC

j

i Inspection Team

Resident Inspector

ACRS(10)

i 0GC

l TVA-Rockville

1

L

!

I

0

f1

l \

p%

l

,

-

r - . . - ---a - --.-,n-- - - - - - - - - - , -