e 5
.t June 28, 1988
~,a
' MEMORANDUM FOR:
. Wayne Lanning, OEAB FROM:
Mi nael J. Davis, Project Manager r.oject Directorate V Division of Reactor Projects - III, IV, Y and Special Projects Office of. Nuclear Reactor Regulation
SUBJECT:
CLOSE0VT OF LONG-TERM FOLLOWUP ITEM 87-157 As per our discussion with George Knighton on June 23, 1988, I recommend closecut of EAB Long-Term Followup. Item 87-157 on Reactor Coolant Pumi Shaft Cracking at Palo Verde.
-Modified shafts have been installed in the. Unit I and Unit 2 RCPs during their respective first refueling outages. Modified shafts will be installed in Unit 3 RCPs during-the Spring 1989 first refueling outage.
Vibration monitoring programs are in place on all 3 units.
A report submitted iy the licensee on May 20, 1988, sumnarizes the results of the RCP Shaft Inspections on Units 1 and 2.
TAC Number 68248 covers review of this report.
original signed by Michael J. Davis, Project Manager Project Directorate V Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation CONTACT: Michael J. Davis, NRR, X21368
, DISTRIBUTION
~pocRet 51!e y #
NRC & Local PDRs PD5 Reading DMCrutchfield MJDavis JLee GWKnighton I
DRSP/PDV(l DRS
- PDV MJDavis:dr WKnighton 6/p?/88 6/g/88 p[O f 0FFICIAL RECORD COPY svTa??*iBalh*
e P
fotaoq n
,e o
UNITED STATES NUCLEAR REGULATORY COMMISSION o
E WASHING TON, D. C. 20S55 5
\\,,,,, **l s
Jura 28, 1988 MEMORANDUM FOR:
Wayne Lanning, OEAB FR0h:
Michael J. Davis, Project Manager Project Directorate V Division of keactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
SUBJECT:
CLOSE0VT OF LONG-TERM FOLLOWUP ITEM 87-157 As per cur discussion with George Knighton on June 23, 1988, I recommend closecut of EAB Long-Term Followup Item 87-157 on Reactor Coolant Pump Shaft Cracking at Palo Verde.
Modified shafts have been installed in the Unit I and Unit 2 RCPs during their respective first refueling outages. Modified shafts will be installed in Unit 3 RCPs during the Spring 1989 first refueling outage. Vibration monitoring programs are in place on all 3 units.
A report submitted by the licensee on May 20, 1988, summarizes the results of the RCP Shaft Inspections on Units 1 and 2.
TAC Number 68248 covers review of this report.
ff'g U-,