ML20196K268
| ML20196K268 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 06/27/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20196K272 | List: |
| References | |
| NUDOCS 8807060557 | |
| Download: ML20196K268 (2) | |
See also: IR 05000313/1988015
Text
.
-_________
. _ _ _ _ .
,,
4.
,
.,
.RN ?T&
'
In Reply Refer To:
-Dockets:
50-313/88-15
50-368/88-15
,
' Arkansas Power & Light Company .
AT1N: Gene Campbell, Vice President -
Nuclear Operations'
.P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
,
This refers to the inspection conducted by Mersrs. W. D. Johnson and R. C. Haag
of this office during the period May 1-31, 1988, of activities authorized by
NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and
2, and to the discussion of our findings with Mr. E. C. Ewing, and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included plant status, operational safety
verification, maintenance, surveillance, plant startup testing, and event
followup. Within.these areas, the inspection consisted of selective-
examination of procedures-and representative records, interviews with
personnel, and observations by the NRC inspectors.
The findings are documented
in,the enclosed inspection report.
-During this inspection, it was found that certain of your activities were in
[
violation of NRC requirements. Consequently, you~are required to respond to
these violations, in writing, in accordance with the provisions of Section 2.201
of.the NRC's "Rules of Practice,":Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
'
Violation enclosed with this letter. Licensee Event Report 368/88-008
provided the cause and corrective actions for violation "C" involving
inoperable Unit 2 charging pumps. No further written response is required for
this violation.
l
"
The response directed by this letter and the accompanying Notice is not subject
'
!
to the clearance procedures of the Office of Management and Budget as required
i
by the Paperwork Reduction Act of 1980, PL 96-511.
l
l
!
>
0
0
RIV: SRI
-RI
DRP/A
DRPk
WDJohnson
RCHaag
DDChamberlain
LJCallan
!
I, /2.'/88
6 /f)/88
6 /M/88
4 /P/P8
l
g
'
i
'
\\
i
s "i
h
h
'
'
Q'
-
'
..
..
-
- - . .
3. -
,
,
.
Arkansas. Power & Light Company
-2-
Should you have any questions concerning'this inspection,' we will be pleased to
discuss them with you.
Sincerely,
Original Slaned By
A.D. Heach
L. J. Callan, Director
Division of Reactor Projec'.s
.,
Enclosures:
.
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/88-15
50-36P/88-15
cc w/ enclosures:
-Arkansas Nuclear One
ATTN:
J. M. Levine, Executive Director
ANO Site Nuclear Operations
P.O. Box'608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
E
bectoDMB(IE01)
bec distrib, by RIV:
- RRI
Robert D. Martin, RA
RPSB-DRSS
- SectionChief(DRP/A)
- Lisa Shea, RM/ALF
- RIY File
- DRP
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
- G. Dick, NRR Project Manager
- R. Hall
- C. Harbuck, NRR Project Manager
- DRS
l
l
.. ..
..
._