ML20196D433
| ML20196D433 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/19/1988 |
| From: | Jabbour K Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20196D436 | List: |
| References | |
| NUDOCS 8802170140 | |
| Download: ML20196D433 (6) | |
Text
.
/
'o UNITED STATES
['
~,j NUCLEAR REGULATORY COMMISSION l
WASMNGTON, D. C. 20M4 s
%,...../
Ol!KE POWER COMPANY NORTH CAROLINA ELECTRIC MEMBERSHIP CORPORATION SALUDA RIVER ELECTRIC COOPERATIVE, INC.
DOCKET NO. 50-413
_ CATAWBA NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.38 License No. NPF-35 i
1.
The Nuclear Pegulatory Comission (the Comission) has found that:
A.
The application for amendment to the Catawba Nuclear Station, Unit 1 (the facility) Facility Operating License No. NPF-35 filed by the Duke Power Company acting for itself, North Carolina Electric Membership Corporation and Saluda River Electric Cc"perative, Inc., (licensees) dated September 8, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as i
atended, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (il that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (11) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the coninon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment.
and Paragraph 2.C.(2) of Facility Operating License No. NPF-35 is hereby amended to read as follows:
i DC D
P
~
3 e l (2) Technical Specifications
[
The Technical Specifications contained in Appendix A, as revised l
through Arnendment No. 38, and the Environmental Protection Plan f
contained in Appendix B, both of which are attached hereto, are hereby incorporated into the license. Duke Power Cortpany shall i
operate the facility in accordance with the Technical Specifications l
and the Environmental Protection Plan.
4 L
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMISSION i
Kahtan N. Jabbour, Acting Director Project Directorate 11-3 Division of Reactor Projects I/II
Attachment:
Technical Specification Changes Date of Issuance:
January 19, 1988 l
I f
b t-y,,F I
7 1
p *.'.
V 4' ' p l
l
@ e:gp g
f
%U' i
MR6ohf(rhac /PDIf-3DRP1/II PD I /DRPI/II PDII-3 DRPI/!!
NRR/ SXB t
KJabbour Wodges 12/lb/87 /
1 / e/87 12/g/87 12//g/87 Gr[inasa B hespa P f-3/DRPI/II AD/ PII 4debbear. Acting PD p/87, 12/
/87 j?/ / /8p uw wa
~
se ctop l
+
e UNITED STATES
', ^
l
NUCLEAR AEGULATORY COMMISSION q
F ASHINGTON, D. C, 20H6 t
f DUKE POWER COMPANY NORTH CAROLINA MMICIPAL POWER AGENCY NO.1 PIE 0HONT MUNICIPAL POWER AGENCY DOCKET NO. 50-414 CATAWBA NUCLEAR STATION, UNIT 2 AMEN 0 MENT TO FACILI?Y OPERATING LICENSE t
Amendrnent No, 30 License No. NPF-52 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendtrent to the Catawba Nuclear Station, Unit 2 (the facility) Facility Operating License No NPF-52 filed by the Duke Power Company acting for itself, North Carolina Municipal Power Agency No I and Piedmont Municipal Power Agency, (licensees) dated l
September 6,1987, corrolies with the standards and requirements of the Atomic Energy Act of 1954, as arrended (the Act) and the Comission's rules and regulations as set forth in 10 CFR Chapter It i
C.
The facility will operate in confomity with the application, as amended the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by L
this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuanc
.f this amendment will not be inimical to the comon defense and.,ecurity or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been a
]
satisfied, i
2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-52 is hereby l
amended to read as follcws:
1 i
2 (2) Technical Specifications The Technical Specifications' contained in Appendix A, as revised through Amendment No.
30, and the Environmental Protection Plan
- contained in Appendix B both of which are attached hereto.-are hereby incorporated into the license. Duke Power Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION t
t Kahtan N. Jabbour, Acting Director Project Directorate II-3 Division of Reactor Projects I/II
Attachment:
r Technical Specification Changes F
Date of Issuance:
January 19, 1988 I
t i
k f])kl PDJJ PD DRPI/II PDIN/DRP!/II NRR/RSXB i
MRe@y/DRP!/II rac KJabbour WHodges 12/ib/87 12/p/
12/g/87 da P
I 3/DRP!/II AD II Khr, Acting PD GL nas 1{/n /8(o 1 //87 a c,=w <.p'n
,t 12/= =/87 j
i 1
+
l ATTACHMENT TO LICENSE AMENDMENT NO. 38
+
FACILITY OPERATING LICENSE NO NPF-35 DOCKET NO. 50-413 k
i AND TO LICENSE AMENDMENT NO. 30 FACILITY OPERATING LICENSE NO. NPF-52 DOCKET NO. 50-414 i
Replace the following Dage of the Appendix "A" Technical Specifications with the enclosed page.
The revised page is identified by Amendmen'. r,Jmber and l.
contains a vertical line indicating the area of change.
Amended Page i
5-6 i
i 1
8 i
I 1
d 1
I I
i
)
0 4
h l
.n DESIGN FEATURES DESIGN PRESSURE AND TEMPERATURE 5.2.2 The reactor containment vessel is designed and shall be maintained for a maximum internal pressure of 15 psig and E. temperature of 328 F.
5.3 REACTOR CORE.
FUEL ASSEMBLIES 5.3.1 The core shall contain 193 fuel assemblies with each fuel assembly containing 264 fuel rods clad with Zircaloy-4.
Each fuel rod shall have a nominal active fuel length of 144 inches.
The initial core loading shall have a maximum enrichment of 3.5 weight percent U-235.
Reload fuel shall be similar in physical design to the initial core loading and shall have a maximum nominal enrichment of 4.0 weight percent U-235 with a maximum enrich-ment tolerance of 0.05 weight percent U-235.
CONTROL R0D ASSEMBLIES 5.3.2 The core shall contain 53 full-length control rod assemblies.
The full-length control rod assemblies shall contain a nominal 142 inches of absorber material of which 102 inches shall be 100% boron carbide and remaining 40-inch tip shall be 80% silver, 15% indium, and 5% cadmium.
All control rods shall be clad with stainless steel tubing.
5.4 REACTOR COOLANT SYSTEM DESIGN PRESSURE AND TEMPERATURE 5.4.1 The Reactor Coolant System is designed and shall be maintained:
In accordance with the Code requirements specified in Section 5.2 a.
of the FSAR, with allowance for normal degradation pursuant to the applicable Surveillance Requirements, b.
For'a pressure a 2485 psig, and For a temperature of 650 F, except for the cressurizer which is c.
680 F.
VOLUME 5.4.2 The total water and steam volume of the Reactor Coolant System is 12,040 100 c0bic feet at.a nominal T of 525 F.
avg 5.5 METEOROLOGICAL TOWER LOCATION 5.5.1 The meteorological tower shall be located as shown in Figure 5.1-1.
CATAWB'A' ' UNITS 1 1. 2 5-6 Amendment No. 38 (Unit 1)
/
?
Amendment No. 30 (Unit 2) e J
.