ML20196C142

From kanterella
Jump to navigation Jump to search
Forwards Biweekly Listing of Generic Communications Being Considered or Under Development by Nrc.List Includes All Communications Reported by 881115
ML20196C142
Person / Time
Issue date: 11/17/1988
From: Berlinger C
Office of Nuclear Reactor Regulation
To: Jacobs R
INSTITUTE OF NUCLEAR POWER OPERATIONS
References
NUDOCS 8812070190
Download: ML20196C142 (6)


Text

gy 17 tF Mr. Rick Jacobs Institute of Nuclear Power Operations Suite 1500, 1100 Circle 75 Parkway Atlanta, Georgia 30339-3064

Dear Mr. Jacobs:

Enclosed for your information is et. biweekly listing of generic communi-cations being considered or under development by the NRC staff. These include Bulletins (type coded BL on the list), Information Notices (Is) and Generic Letters (GL). Temporary Instructions, that cover the special NRC inspection effort resulting from certain generic communications, are listed with the type code T!. This listing includes all proposed generic communications that had been reported to us by November 15, 1988.

Sincerely, i

Carl H. Berlinger, Chief Generic Comunications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation Ericlosure:

At stated DISTRIBUTION w/ enclosure:

All NRC Division Directors All NRC Branch Chiefs CERossi, NRR CHBerlinger, NRR DCKirkpatrick, NRR POR Central Files CCS ,

00EA R/F OGCB R/F DKirkpatrick R/F LDerderian, DCE RBarber, DOE

('N/ 5 f (N (

I OGCB:DCEA:NRR C/0GCB:00EA:NRF

, l } > ).

DCKirkpatrick CFFerlinger 11/'/ /FPLM 11/ /88 [ v e)-

G312070100 881117 PDR ORG EPSINPO PDC

  • Pck No. 1 l 11/15/88

) PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC l TP ORIGIN. SUBJECT CONTACT PHONE ISSUE f OFFICE DATE l

c  !

l . I IN NRR/DRIS ENVIRONMENTAL QUALIFICATION Steve (301) 11/30/88 (

RVIB 0F LIMITOROUE MOV ACTUATOR Alexander 492-0995 i 1ERMINAL BLOCKS & MARATHON i E

1600 TERMINAL BLKS GL REGION HEAT EXCHANGER FOULING. Vern Hodge (301) 12/01/88

>  !! 492-1169

IN NRR/ DEST ERRORS IN CALIBRATION OF Joe Joyce (301) 12/01/88 SICB LEAD / LAG AND RATE CIRCUITS IN 492-3265 REACTOR PROTECTION SYSTEMS.

]

i j GL NRR/DLPD SAFETY PARAMETER DISPLAY Dick (301) 12/01/88 SYSTEM - ACCEPTABLE METHODS Eckenrode 492-1014 0F IMPLEMENTING REQUIREMENTS GL RES/DE SAFETY RELATED MOTOR OPERATED Owen (301) 12/01/88 EIB VALVE TESTING AND INSPECTION Rothberg 492-3815 IN RES/EME LIMITOROUE SMA SPRING Jerry (301) 12/30/08 DEFORMATION Weidenhamer 492-3839 IN NRR/DOEA CHANGE IN FORMAT FOR NRC Vern Hodge (301) 12/01/88 OGCB GENERIC COMMUNICATIONS 492-1169 GL NRR/ DEST SUFPLEMENT TO GENERIC LETTER Shou-Naen (301) 01/01/89 EMEB 87-11 DEALING WITH ARBITRARY Hou 492-0904 INTERMEDIATE PIPE RUPTURE REQUIREMENTS GL NRR/ DEST INSERVICE INSPECTION OF Robert (301) 01/30/89 EMTB PRESSURE RETAINING WELDS IN Hermann 492-0911 THE REACTOR VESSEL GL AEOD LICENSEE COMMITMENTS FOR John (301) 12/30/88 EMERGENCY RESPONSE DATA Hickman 492-4155 SYSTEM (ERDS) IMPLEMENTATION GL NRR/ DEST NRR RECOMMENDATION ON ISI OF Chen F. Tan (301) th/30/88 ESGB MARK I L II STEEL 492-0W29 CONTAINMENTS, REFUELING CAVITIES & ASSOC DRAINAGE SYS GL RES/DRPS INDIVIDUAL PLANT EXAMINATION Farouk (301) 12/15/88 RHFB FOR SEVERE ACCIDENT Eltawila 492-3569 VULNERABILITIES - 10 CFR 50.54

Pc"g3 No. 2 11/15/98 PROPOSED GENERIC COMMUNICATIONS J IN PREPARATION WITHIN THE NRC TP ORIGIN. SUBJECT CONTACT PHONE ISSUE OFFICE DATE SL NRR/ DEST RESOLUTION OF GENERIC ISSUE Om P. (301) 12/30/88 SELB B-56, DIESEL RELIABILITY Chopra 492-0835 GL NRR/ DEST INSERVICE TESTING FOR PUMPS Ted (301) 01/31/89 EMEB AND VALVES Sull1yan 492-0901 GL NRR/DOEA LINE ITEM TECH SPEC Wayne (301) 01/15/89 OTSB IMPROVEMENT-RELOCATION OF Meinke 492-3150 ,

RADIOLOGICAL EFFLUENT g

REQUIREMENTS TO OFFSITE DOSE '

CALCULATION MANUA GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 02/28/89 OTSB SPECIFICATION IMPROVEMENT - a192-1189 REMOVAL OF COMPONENT LISTS IN NRR/DRIS INADEOUATE FIRE DAMPER Joe (301) 01/17/89 VIB OPERABILITY TESTS UNDER AIR Petrosino 492-0979 FLOW CONDITIONS IN NRR/DRIS POTENTIAL MANUFACTURER Joe (301) 12/02/88 l VIB DEFECTS IN CUTLER HAMMER E-30 Petrosino 492-0979 l *TCHES MANUFACTURED PRIOR A CERTAIN DATE l GL NRR/ DEST h4N! MUM EDGE DISTANCE FOR J Ma t< R (301) 11/18/88 ESGB INSTALLATION OF ANCHORS IN Lipinski 492-1376 CONCRETE IN NRR/DRIS POTENTIALLY UNDERSIZED VALVE J. J. (301) 11/18/88 VIB MOTOR ACTUATORS Petrosino 492-0979 PDRIS IN AEOD THE REPORTING OF SAFETY VALVE Mary S. (301) 12/15/88 AND SAFETY-RELIEF VALVE Wegner 492-7818

- EVENTS PURSUANT *0 10 CFR 50.73 GL NRR/DREP CHANGE IN THE REGULATORY John (301) 01/16/09 PRPB LIMIT FOR OCCUPATIONAL Buchanan 492-1097 EXPOSURE OF THE SKIN TO BETA RADIATION FROM HOT PARTICLES IN NMSS ACTIONS TAKEN TO DATE ON Michael (301) 11/25/98 DLLWD/TB TOPICAL REPORTS ON LOW LEVEL Tokar 492-0590 WASTE FORMS AND HIGH INTEGRITY CONTAINERS

_ _- _________________ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ ~

. Pcg3 No. 3 11/15/88 PROPOSED GENERIC COMMUNICATIONS I IN PREPARATION WITHIN THE NRC TP ORIGIN. SUBJECT CONTACT PHONE ISSUE OFFICE DATE IN NMSS SHIPMENT OF CONTAMINATED A. W. (301) 12/30/88 SGTR/OB EQUIPMENT BETWEEN NUCLEAR Grells 492-3381 POWER STATIONS GL NRR/DOEA VOLUNTARY ENTRY INTO R. J. (301) 02/15/89 OTSB TECHNICAL SPECIFICATION 3.0.3 Giardina 492-1189 GL RES/DSIR ASME SECTION 3 REPLACEMENTS Robert (301) 12/15/08 EIB Kirkwood 492-3814 GL RES/IEB RESOLUTION OF GI/70, PORV R Kirkwood 492-3814 12/15/88 L RPSIB AND BLOCK VALVE RELIABILITY, E Throm -3567 AND GI/94, ADDITIONAL LOW TEMP OVERPRESS FROTECTION FOR LWRS TI NRR/ DEST INSPECTION OF IMPLEMENTATION A. (301) 01/15/89 EMEB OF BULLETIN TO EXTEND IED Masciantonio 492-0920 85-03 "MOV COMMON MODT FAILURES DURING PLANT TRANSIENTS TI NRR/ DEST INSPECTION OF COMPLIANCE WITH T. E. (301) 03/01/89 SRXB BULLETIN 88-04: Collins 492-0897 "SAFETY-RELATED PUMP LOSS" TI NRR/DRIS INSPECTION OF IMPLEMENTATION Ed Baker (301) 01/01/89 RVIB OF BULLETIN 87-02: FASTENER 492-3221 TESTING TO DETERMINE CONFORMANCE WITH MATERIAL SPECS TI NRR/DRIS FOLLOW-UP OF RESPONSES TO Ray (301) 01/06/89 LVIB BULLETIN 88-05: NONCONFORMING C111mberg 492-3220 MATERIALS PROVIDED BY PSI /WJM BL NRR/ DEST NONCONFORMING ELECTRICAL Paul Gill (301) 12/15/R8 SELB EQUIPMENT COMPONENTS AND 492-0811 DEVICES TI NRR/ DEST REVIEW OF LICENSEE RESPONSES Warran Lyon (301) 11/30/88 SRXB TO GENERIC LETTER ON 492-0891 OPERATION WITH LOWERED REACTOR COOLANT SYSTEM INVENTORY S. Hou (301) 12/01/88 BL NRR/ DEST UNEXPECTED SURGE LINE EMEB DEFLECTION DUE TO THERMAL 492-0904 STRATIFICATION

"'Pcg3 N3. 4 11/15/88 PROPOSED GENERIC COMMUNICATIONS ,

IN PREPARATION WITHIN THE NRC TP GRIGIN. SUBJECT CONTACT PHONE ISSUE OFFICE DATE GL NRR/DLPO DEVELOPMENT AND Ken Hooks (301) 12/01/88 '

LOAB IMPLEMENTATIION OF PROGRAM TO 492-1010 IDENTIFY NONCONFORMING MATERI ALS t< EQUIPMENT BEFORE INSTALLATION i IN REGION I DEFICIENCIES IN CLASS 1E Julio Lara (215) 11/21/88 I BATTERY CELLS 337-5144 IN REGION POTENTIAL FOR SEVERE R. Vickrey (817) 11/30/88 IV ELECfRCAL SHOCK AND DAMAGE TO 860-8239

(

SAFETY RELATED EQUIPMENT IN NRR/DOEA ELECTRICAL RELAY DEGRADATION N. P. (301) 11/30/08 OGCB DUE TO CONTACTOR SURFACE Kadambi 492-1153 OXIDATION.

1 IN NRR/DOEA EFFECTS OF CABLE SIZING AND Richard J. (301) 11/18/08 OGCB CONTROL CIRCUIT CONFIGURATION Kiessel 492-1154 ON MOTOR OPERATED VALVE (MOV) f OPERABILITY l

IN NRR/DREP SAFETY SIGNIFICANCE OF Sammy Diab (301) 02/15/89 l PRAB NUCLEAR POWER PLANT AIR 492-1075  !

COOLING SYSTEMS l i IN REGION LOW TEMPERATURE OVERPRESSURE Peter Moore (404) 11/18/88

!! PROTECTION VALVE SURVEILLANCE 331-0338 TESTING IN NRR/DOEA CNEW3 POTENTIAL FOR SPENT Daniele (301) 11/30/88 i

DEAB FUEL POOL DRAIN DOWN Oudinot 492-1174 IN AEOD/D4 .iW3 SUPP 1 TO IN 86-101: Mark (301) 11/30/88 LOSS OF DECAY HEAT REMOVAL Padovan 492-4445 DUE TO LOSS OF FLUID LEVELS IN REACTOR COOLANT SYSTEMS IN NMSS/IMN ENEW3 TELETHERAPY John (215) 12/ 5/08 S MISADMINISTRATIONS McGrath 337-5216 IN AEOD/IRB CNEW3 SUPP 1 TO IN 06-97: Bill (301) 12/30/88 EMERGENCY COMMUNICATION Reckley 492-9916 l

SYSTEM John (301) 11/30/08 1 IN NRR/DOEA [NEW3 EMERGENCY DIESEL OGCB GENERATOR CONTROL AIR TUBE Jankovich 492-1167  ;

FAILURE

'.' Pag 3 NJ. 5 11/15/C0 PROPOSED GENERIC COMMUNICATIONS

  • IN PREPARATION WITHIN THE NRC TP ORIGIN. SUBJECT CONTACT PHONE ISSUE OFFICE DATE BL NRR/ DEST ENEW3 STRESS CORROSION Dave (301) 04/01/89 EMTB CRACKING OF TYPE 410 Sellers 492-0930 STAINLESS STEEL IN VALVES IN NRR/DRIS CNEW3 IMPROPER ADMINISTRATION Nancy Ervin (301) 11/30/88 RSGB AND CONTROL OF PSYCHOLOGICAL 492-0946 TESTS i

t' i

l f

t

?

i

!