ML20195J851

From kanterella
Jump to navigation Jump to search

Informs That NRC Staff Plans to Provide Guidance on Snubbers by Issuance of Approved Tech Specs in Latter Part of 1989. NRC Positions on Several Matters,Including Proposed Changes 3 & 4 Will Be Addressed
ML20195J851
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/29/1988
From: Matthews D
Office of Nuclear Reactor Regulation
To: Tucker H
DUKE POWER CO.
References
TAC-66790, TAC-66791, NUDOCS 8812050076
Download: ML20195J851 (3)


Text

,[.== as:g),

UNITED STATES y

g NUCLEAR REGULATORY COMMISSION O

s WASHING' ON, D. C. 20666 k

,/

November 29, 1988 f

l Docket Nos.:

50-413 50-414 i

Mr. H. B. Tucker, Vice President Nuclear Production Department t

Duke Power Company 422 South Church Street Charlotte, North Carolina 28242

Dear Mr. Tucker:

SUBJECT:

TECHNICAL SPECIFICATION CHANGES REGARDING SNUBBERS - CATAWBA NUCLEAR STATION, UNITS 1 AND 2 (TACS 66790/66791) 4 By letter dated Decerber 15, 1987, and supplemented April 15,1988, you proposed five changes to Catawba Technical Specification (TS) 3/4.7.8 regarding snubbers. These are:

Change 1 would delete an optional sampling plan for snubber inspection (Surveillance Requirement 4.7.8e.3)--the "55" snubber plan) which has never been used at Catawba; Change 2 would allow deletion of the "REJECT" line from Figure 4.7-1 and in the "37" functional test plan (Surveillance Requirement 4.7.8e.2)); Change 3 propo',es an alternate sampling plan, not yet approved by the American Society of Mechanical Engineers (ASME), involving grouping of snubber failure modes; Change 4 would allow deletion of the phrase "of a type" from Surveillance etequirement 4.7.8e; and Change 5 would delete the requirement to inspect snubber attachment hardware i

l (Surveillance Requirement 4.7.Bc.--Visual Inspection Acc<eptance Criteria) because this inspection is already under the requirements of AS'iE Code,Section XI.

i TS changes 2 and 5 were approved by the issuance, on September 26, 1988, of license amendments 52 and 45 for Catawba Units 1 and 2, respectively.

For changes 1, 3, and 4, you state, among other things, that these are proposed to l

implement the recomendations contained in the most recent draft document (i.e., draft 6, revision 2) issued by the ASME Operating and Maintenance (OM-4)

I working group.

i i

i j

'\\0 l

$@h2988$ 80$$h3 P

4

,..s e

Mr. H. B. Tucker The NRC staff plans to provide guidance on snubbers by the issuance of the approved Standard Technical Specifications in the latter part of 1989.

Staff positions on several matters, including your proposed changes 1, 3, and 4, would be addressed at that time. Therefore, we plan to take no further action on these changes.

If you have questions regarding this denial, please contact Kahtan Jabbour at (301)492-1496.

Sincerely, F/ Lawrence P.

Crocker David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION Sechet File' NRC POR Local PDR PDII-3 Reading

5. Varga 14-E-4 G. Lainas 14-H-3 D. Matthews 14-H-25 H. Rood 14-H-25 K. Jabbour 14-H-25 OGC 15-B-18 E. Jordan MNBB-3302 B. Grimes 9-A-2 T. Marsh ACRS (10)

P-315 CATAWBA PLANT FILE

\\

,PD{lp3 r

PDII-EMEB: DEST PD!l.

M#ood

.K s

KJabbour:sw THars 0Matthews gi /1,b 11/1,';/88 11/y88 11/16/88

/38

// / 49 /88

d O *

  • Mr. H. B. Tucker Duke Power Company Catawba Nuclear Station cc:

A.V. Carr, Esq.

North Carolina Electi ic Membership Duke Power Company Corp.

422 South Church Street 3400 Sumner Boulevard Charlotte, North Carolina 28242 P.O. Box 27306 Raleigh, North Carolina 27611 J. Michael McGarry, III, Esq.

Bishop. Liberman, Cook, Purcell Saluda River Electric Cooperative, and Reynolds Inc.

1200 Seventeenth Street, N.W.

P.O. Box 929 Washington, D. C.

20036 Laurens, South Carolina 29360 North Carolina MPA-1 Senior Jesident Inspector Suite 600 Route 2, Box 179N 3100 Smoketree Ct.

York, South Carolina 29745 P.O. Box 29513 Raleigh, North Carolina 27626-0513 Regional Administrator, Region 11 U.S. Nuclear Regulatory Comission S. S. Kilborn 101 Marietta Street, NW, Suite 2900 Area Manager, Mid-South Area Atlanta, Georgia 30323 ESSO Projects Westinghouse Electric Corp.

Mr. Heyward G. Shealy, Chief MNC West Tower - Bay 239 Bureau of Radiological Health P.O. Box 355 South Carolina Department of Health Pittsburgh, Pennsylvania 15230 and Environmental Control 2600 Bull Street County Manager of York County Columbia, South Carolina 29201 York County Courthouse York, South Carolina 29745 Karen E. Long Assistant Attorney Ger.eral Richard P. Wilson, Esq.

N.C. Department of Justice Assistant Attorney General F.O. Box 629 S.C. Attorney General's Office Raleigh, North Carolina 27602 P.O. Box 11549 Columbia, South Carolina 29211 Mr. Peter G. LeRoy Nuclear Production Department Piedmont Municipal Power Agency Duke Power Company 100 Memorial Drive P.O. Box 33189 Greer, South Carolina 29651 Charlotte, North Carolina 28241 Mr. Michael Hirsch Federal Emergency Management Agency Office of the General Counsel Room 840 500 C Street, S.W.

Washington, D. C.

20472