ML20195J296

From kanterella
Jump to navigation Jump to search
Notification of CRGR Meeting 128 on 880127 to Review Generic Ltr Imposing New NRC Positions Interpreting Intent of 10CFR100,App a Re Exceedance of Obe.W/O Encl
ML20195J296
Person / Time
Issue date: 01/20/1988
From: Jordan E
Committee To Review Generic Requirements
To: Bernero R, Martin T, Ross D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
Shared Package
ML20151L073 List:
References
RTR-REGGD-01.100, RTR-REGGD-1.100 NUDOCS 8801270199
Download: ML20195J296 (2)


Text

,

ma e 8eug'o, j

UNITE 2 STATES e

[3n

'h NUCLEAR REGULATORY COMMISSION wassiNovos. o. c. rvsss January 20, 1988 MEMORANDUM FOR:

Robert M. Bernero, HMSS Thomas T. Martin, RI Denwood F. Ross, RES Joseph Scinto, OGC James H. Sniezek, NRR FRON:

Edward L. Jordan, Chairman Committee to Review Generic Requirements St% JECT:

CRGR MEETING NO. 128 The Committee to Review Generic Requirements (CRGR) will meet on Wednesday, January 27, 1938, 1-5 p.m. in Roos 6507 HNBB.

The agenda is as follows:

1-2 p.m.

L. Shae, NRR, will present for CRGR review a proposed Generic Letter imposing new staff positions interpreting the intent of 10 CFR 100. Appendix A with regard to exceedance of the Operating Basis Earthquake (OBE).

(Review packcge is enclosed.)

2-3 p.m.

L. Shao, NRR, will present for CRGR review a proposed NRC Bulletin on steam generator tube rupture.

(Review package will be forwarded to members under.eparate cover when available.)

3-4 p.m.

E. Rossi, NRR, wili pressn. for CRGR review a porposed NRC Bulletin on Reactor Trip 3rmer K"i mechanical failure problems.

(Review packsge 16 ene bsed.)

4-5 p.m.

G. Arlotto, RES, til present for CRGR review porposed Final Rev. 2 to Reg. Guide 1 100, " Hisaic Qualification of Electrical End Mechanical Equipment for Nuclear Power Plants." This Reg.

Guide was reviewed oy the Comit'.ke in the draf t state at CRGR Meeting No. 97.

(Review package will be forwarded to members under separate cover when available.)

5 p.m.

The final item to be considered by the Committee at this meeting is a proposed rule change to delete a 30 day scheduling link between the annual physical fitness test and preceding medical examination given to all armed security personnel at operating nuclear plants.

Due to the minor significance of this proposed change, a fcreal presentation to CRGR by the sponsoring office (RES) is not considered necessary on this item.

(Review package is enclosed.)

If a CRGR member cannot attend the meeting, it is his responsibility to assure that an alternute, who is approved by the CRGR Chairman, attends the meeting.

4

.' Januar,y 20, 1988 Persons making presentations to the CRGR are responsible for (1) assuring that the information required for CRGR review is provided to the Committee (CRGR Charter - IV 8), (2) coordinating and presenting views of other offices, (3) as i

appropriate, assuring that other offices are represented during the presenta-ion, and (4) assuring that agenda modifications are coordinated with the CRGR contact (J. Conran X29855) and others involved with the presentation.

Division Directors or higher management should attend meetings addressing agenda items under their purview.

In accordance with the ED0's March 29, 1984 memorandte to the Commission con-1 cerning "Fo:verding of CRGR Documents to the Pubite Dociment Room (POR)," the enclosure, which contains predecisional information, will not be released to the POR until the NRC has considered (in a public forum) or decided the matter addressed by the information.

DeleW Es=158 r: 01erVan i

Edward L. Jordan, Chairman Committee to Review Generic j

Requirements

Enclosures:

l As stated cc w/ enclosures:

SECY V. Stello, Jr.

i cc w/o enclosures:

l Commission (5) J. Lieberman l

S. Ebneter i

W. Mcdonald Regional Administrators W. Parler l

j 1

L. Shao l

G. Arlotto l

4 E. Rossi l

Distribution:

l E. Jordan i

l J. Heltemes J. Conran C. Sakenes 3 R. Fraley B. Doolittle CRGR CF (w/o ene.) CRGR SF S. Treby (w/o enc.) T. Rehm j

(w/o ene.) J. Johnson, OEDO I

POR (NRC/CRGR) (w/o enc.) Central File (w/o ene.)

.l i

1 i

DT F :

AE00 : AE00:00

  • C/CRGR:

,, 4

]JHeltemesTh i

M j

NAME :J ran:cg ordan l

1p0/88 DATE :

1//f/88 1/l*/88 I

I

- - - - - - - - - - - -