ML20195G975
| ML20195G975 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 11/18/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20195G978 | List: |
| References | |
| NUDOCS 8811300161 | |
| Download: ML20195G975 (2) | |
See also: IR 05000313/1988035
Text
_ _ _ _
____
_
_
_ ___ _ _ _
__
_ - _
J-
.
NOV I 81988
'
In Reply Refer To:
Dockets:
50-313/88-35
50-368/88-35
Arkansas Power & Light Company
.
ATTN: Mr. Gene Campbell
!
Vice President, Nuclear
Operations
P.O. Box 551
i
Little Rock, Arkansas 72203
l
,
Gentlemen:
This refers to the inspection conducted by Mr. R. V. Azua of this office during
i
the period October 30 through November 4,1988, of activities authorized by
i
NRC Operating Licenses OPR-51 and NPF-6, for the Arkansas Nuclear One, Units 1
-
and 2, and to the discussion of our findings with Mr. J. Levine and other members
'
of your staff at the conclusion of the inspection.
1
The area examined during the inspection was the ANO, Unit I containment
!
integrated leak rate test. Within this e-en, the inspection consisted of
l
'
selective examination o' procedures and representative records, interviews with
personnel, and observations by the NRC inspecto.*. The inspection findings are
documented in the enclosed inspection report.
,
,
During this inspection, it was found that certain of your activities were in
i
violation of hRC requirements. A Notice of Violation has not been enclosed
,
with this letter, but the details of this finding are discussed in paragraph 3
"
,
l
In the report.
You are requested to be prepared to discuss all aspects of this
i
item with Region IV staff at a future eee*ing.
You will be contacted in the
5
near future tn arrange a mutually acc' "
e time for the meeting.
t
4D
Li
Should you have any questions concerni.g this inspection, we will be pleased
!.
to discuss them with you.
,
4
Sincerely,
,
Original Shmd ay
l
,
'
11 J. Callan
!
L. J. Callan, Director
'
Division of Reactor Projects
'
Eiiclosure:
)
Appendix
NRC Inspection Report
i
50-313/88-35
i
bO-368/88-35
RIV:RI
C:TPS
D:0RS
D:0RP 4
U
JLHilhoan w
LJCallan
[
RAzua:ap %
WSeidle
i
////7/83 %
//////88
// ////88 I
H/l1/88
l
l
(
s
88113o0161 settle
I
'
ADOCK 05000313
!
i
G
PNU
f
'
t
,
_
_ _ _
_ _ _ _ _ _ _ _ _ - _ _ ,
..
.
.
Arkansas Power & Light Company
-2-
cc w/ enclosure:
Arkansas Nuclear One
ATTN:
J. M. Levine, Director
Site Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib by RIV:
- RRI
- R. D. Martin, RA
- RPB-DRSS
- Section Chief (DRP/A)
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
- C. Harbuck, NRR Project Manager (MS:
13-0-18)
- DRS
- R.
Azua
- W. Seidle
- w/766