ML20195G975

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/88-35 & 50-368/88-35 on 881030-1104.Details of Violation Discussed in Rept. Preparation to Discuss All Aspects of Item W/Region IV at Future Meeting Requested
ML20195G975
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/18/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20195G978 List:
References
NUDOCS 8811300161
Download: ML20195G975 (2)


See also: IR 05000313/1988035

Text

_ _ _ _

____

_

_

_ ___ _ _ _

__

_ - _

J-

.

NOV I 81988

'

In Reply Refer To:

Dockets:

50-313/88-35

50-368/88-35

Arkansas Power & Light Company

.

ATTN: Mr. Gene Campbell

!

Vice President, Nuclear

Operations

P.O. Box 551

i

Little Rock, Arkansas 72203

l

,

Gentlemen:

This refers to the inspection conducted by Mr. R. V. Azua of this office during

i

the period October 30 through November 4,1988, of activities authorized by

i

NRC Operating Licenses OPR-51 and NPF-6, for the Arkansas Nuclear One, Units 1

-

and 2, and to the discussion of our findings with Mr. J. Levine and other members

'

of your staff at the conclusion of the inspection.

1

The area examined during the inspection was the ANO, Unit I containment

!

integrated leak rate test. Within this e-en, the inspection consisted of

l

'

selective examination o' procedures and representative records, interviews with

personnel, and observations by the NRC inspecto.*. The inspection findings are

documented in the enclosed inspection report.

,

,

During this inspection, it was found that certain of your activities were in

i

violation of hRC requirements. A Notice of Violation has not been enclosed

,

with this letter, but the details of this finding are discussed in paragraph 3

"

,

l

In the report.

You are requested to be prepared to discuss all aspects of this

i

item with Region IV staff at a future eee*ing.

You will be contacted in the

5

near future tn arrange a mutually acc' "

e time for the meeting.

t

4D

Li

Should you have any questions concerni.g this inspection, we will be pleased

!.

to discuss them with you.

,

4

Sincerely,

,

Original Shmd ay

l

,

'

11 J. Callan

!

L. J. Callan, Director

'

Division of Reactor Projects

'

Eiiclosure:

)

Appendix

NRC Inspection Report

i

50-313/88-35

i

bO-368/88-35

RIV:RI

C:TPS

D:0RS

D:0RP 4

U

JLHilhoan w

LJCallan

[

RAzua:ap %

WSeidle

i

////7/83 %

//////88

// ////88 I

H/l1/88

l

l

(

s

88113o0161 settle

I

'

PDR

ADOCK 05000313

!

i

G

PNU

f

'

t

,

_

_ _ _

_ _ _ _ _ _ _ _ _ - _ _ ,

..

.

.

Arkansas Power & Light Company

-2-

cc w/ enclosure:

Arkansas Nuclear One

ATTN:

J. M. Levine, Director

Site Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib by RIV:

  • RRI
  • R. D. Martin, RA
  • RPB-DRSS
  • Section Chief (DRP/A)

Lisa Shea, RM/ALF

  • RIV File
  • DRP
  • MIS System
  • RSTS Operator
  • Project Engineer, DRP/A
  • C. Harbuck, NRR Project Manager (MS:

13-0-18)

  • DRS
  • R.

Azua

  • W. Seidle
  • w/766