Forwards Request for Addl Info Re Util 880214 Request to Use Instrumented Insp Technique.Response Requested within 45 Days of Ltr Date.Full Response Schedule within 30 Days of Ltr Date Requested If Unable to Provide Full Response
ML20195E213
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/15/1988
From: Tourigny E
Office of Nuclear Reactor Regulation
To: Conway W
FLORIDA POWER & LIGHT CO.
References
TAC-60890, NUDOCS 8806230326
Download: ML20195E213 (3)


Text

. .. -

s .

June 15, 1988 Docket No. 50-389 DISTRIBUTION H8erkow.

60iiEEE Miilt _ETourigny NRC & Local PDRs OGC Mr. W. F. Conway- PDII-2 Rdg. EJordan, 3302-t!NBB Senior-Vice President-Nuclear SVarga, 14/E/4 BGrimes, 9/A/2 Nuclear Energy Department Glainas, 14/H/3 ACRS(10)

Florida Power and Light Company DMiller Gray File Post Office Box 14000 MHum Juno Beach, Florida 33408-0420

Dear Mr. Conway:

SUBJECT:

ST. LUCIE PLANT - UNIT N0. 2 - REQUEST FOR ADDITIONAL INFORMATI0tl -

USE OF INSTRUf!ENTED INSPECTION TECHilIQUE (TAC NO. 60890)

In conducting our review of your February 14, 1986 submittal relating to the above subject at the St. Lucie Plant, Unit No. 2, we have determined that we will need additional information identified in the enclosure to continue cur review.

In order for us to maintain our review schedule, your response is requested within 45 days of the date of this letter. If you cannot provide a full response within the requested time, please provide your full response schedule within 30 days of the date of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.

Plea'se contact me at (301) 492-1474 if you have any questions concerning this letter.

Sincerely, Original signed by E. G. Tourigny, Project Manager Project Directorate Il-2 Division of Reactor Projects-I/II

( Office of Nuclear Reactor Regulation

^

l

Enclosure:

i As stated l

cc w/ enclosure:

See next page b

L 0

M M /

our fny:bd BPA CYC ng D:PDII-2 HBerkow 06/}/88 06//>)/88 06/[ /88 06//6788

$gg62gggg gjo 9 P

(

ENCLOSURE Request for Additional Information St. Lucie Plant, Unit No. 2 Use of Instrumented Inspection Technioue (IIT)

1. The licensee requested staff approval to use IIT; however, no time frame for which the approval would be in effect was requested. The staff believes that IIT should be approved for 10-year inspection intervals, consistent with the licensee's 10-year inservice inspection interval.

The licensee is requested to specify if it is requestino approval (1) for the current 10-year interv61 only after which it will reapply for subsequent 10-year intervals, or f 2) for some other time frame and the basis for it,

2. The staff believes that the application of IIT should be documented and pericdically subraitted to the staff for information. One acceptable method would be to include the information with the Owner's Data Report for Inservice Inspection (Form NIS-1). The information would include the system and scope of inspection, the date(s) tested, and the results. The licensee is requestea to specify how it will document the application of IIT and how the staff will be kept informed of its use.
3. The staff believes that the Code-required hydrostatic test should be performed, if practical, in lieu of the application of IIT to meet the Code. The licensee is requested to state its position on the matter and define briefly what general acceptance criteria will be used to determine "pra ct i ca li ty . "

4 The staff believes that in the event of a Code repair or replacement, IIT Cannot be used as a substitute for reouired Nondestructive Testing. The licensee is requested to st:,te its position on this matter.

,e - -

d Mr. W. F. Conwby .

Florida Power & Light Company St. Lucie Plant l- cc:

Mr. Jack Shreve Jaccb Daniel Nash Office of the Public Counsel Office of Radiation Control Room 4, Holland Building Department of Health and Tallohossee, Florido 32304 Rehabilitative Services 1317 Winewood Blvd.

Resident Inspector Tallahassee, Florida 32399-0700 c/o U.S. NRC 7585 S. Hwy A1A Regional Administrator, Region II Jensen Beach, Florld6 34957 U.S. Nuclear Regulatory Comission 101 Marietta Street N.W., Suite 2900 State Planning & Development Atlonta, Georgia 30323

, Clearinghouse Office of Planning & Budget l Executive Office of the Governor i The Capitol Builoing Tall 6h6ssee, Florida 32301 Harold F. Reis, Esq.

Newman & Holtzinger 1615 L Street, N.W.

Washington, DC 20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florido 33131-2398 Aoministrator Department of Environmental Regulation Power Plant Siting Section Stote of Florida 2600 Blair Stone Road Tallahassee, Florid 6 J2301 Mr. Weldon B. Lewis, County Administrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Nr. Charles B. Brinkman, Manager Washington - Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue Bethesda, Maryland 20814

_ _ _ _ - _ _ _ _ _ _