Monthly Operating Repts for May 1988 for McGuire Nuclear Station,Units 1 & 2
ML20195C015
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/31/1988
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8806220073
Download: ML20195C015 (12)


Text

_

1 l

DFERATINS DATA REFCRT

\\

)

DOCKET NO 50-369 DATE Jure 15.1%8 0 FEM ilh5 STATUS COM?LETED BY J. A. Feavis TELEFHONE 704-373-7567

1. Ur,it Names McGaire 1
2. Reporting Peried: May 1,1993-May 31,192E
3. Litersed Thersal Paer (rWt):

3411

4. Naseplate Rating (Gross N e):

13055 Notes iNaseplate Rating

5. Eesign Electrical Rating (Net 4Wel:

1160 (Gross M e! c:i olaie' is

6. Maxinas Deper.dable Capacity (Sr ss Mie):

1171 1450.000 NA x.90 power

7. Mariaan te;endable Capacity (Net Ne):

1127 fatter per Fage iii,

8. If t.nanges Occur in Capacity Eatings (! tees Nu ber 3 Through 7) Since Last SUREB-0020.

Reprt. Give Reasons:

9. Faer Level Te Which Restricted, if Any (Net Ne):
10. Reascn For Restrictions, If any:

This Mantt Yr.-te-Date Cuculative

11. Hnr in Reptrtin; Feried 744.0 3647.0 56975.0
12. Nutur Of Hnts Feactor Was Critical 744.0 359E.5 40456.1
13. Feactar Reserve Shuthwn Hours

--C--

--0--

--0--

14. Hars Generator Cr-Lir.e 744.0 3554.5 39927.2
15. Unit Feserve Sta c Haars

--0--

--0--

--0--

16. Gross Thereal E.ng, Generated trWH) 2529964

!!919187 116'iS5771

17. Gross Electrical Energy Gererated (Ni) 267146 4129650 40525!07
13. Net Electrical Energy 6enerated (MWH) 836296 393224?

3?!47723

19. Unit Service Facter 100.0 98.3 70.1 E0. Unit Availability Facter 100.0 99.3 70.1
21. Umt Ca;acity Facter (Usicq MLC Ne )

99.6 96.7 58.1

22. Unit Capacity Facter (Using CER Wet) 75.3 92.5 57.5
23. Unit Forced 0.ita;e Rate 0.0 1.7 12.1
24. Sh.tdan Scheduled Over Next 6 Months (Ty;e, "ate, and Duration of Each):

Refueline - October 14. 1988 - 10 weeks E5. If Shut Etw, At End Cf Report Peried. Estinated Date cf Startup:

26. Units in Test Status (Pri:r to Cornercial Operatien):

Ferecast Achieved INITUL CRITICAllTY INITIAL ELECTRICITY CCMMERCIAL OPE W M

/

?

8806220073 880531

]

/

PDR ADOCK 05000369 R

DCD

(.

2 p,

l 4

OPERATIN3 DATA REPORT l

i

.EOCLEI N3 50-359 UNIT McGuire 1 DATE June 15. 1989 CCMPLETED BY J. A. Peavis i

TELEPHONE 7M -373 7567 3

4 MONTH May, 1923 t

r D

AVERASE EAILY F0WER LEVEL E

E;Q AVERASE DAILY F0kER LEVEL i

(MWe-Net)

(MWe-Net) i 1

!!32 17 1122 2

!!31 18

!!!6 j.

3

!!34 19 1112 4

113?

E0 1116 5

1 33 21 1117 P

6 1132 22 1120 i

[-

7

!!33 23 1126 i

8

!!31 24 1132 9

!!35 25 1123 10

!!34 26

!!!6 1130 27 1115

+

12 1126 28 1114

-13 1120 29 1114 i

14 1131 30 1113 15 1120 31 1114 16 -

1122 j.

P

.-,_.,~ _.

____ _..__ _ ______..._..____.~ _ _._ _ --

j l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME MCGUIRE 1 DATE 06/15/88 REPORT MONTH May 1988 COMPLETED BY J.

A.

REAVIS TELEPHONE (704)-373-7567 (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 1

NO SHUTDOWNS OR REDUCTIONS 4

(1)

(2)

(3)

(4)

F Forced Reason:

Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensec C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain)

w 4

DOCKET NO:

50-369 UNIT:

McGuire i DATE:

06/15/88 NARRATIVE

SUMMARY

Month: May, 1988 McGuire Unit ! operated at 100% full power for the entire month of May.

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 1

2.. Scheduled next refueling shutdown: October, 1988 3.

Scheduled restart following refueling: December, 1988 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?

Delete expiration date of F* tube plugging criteria.

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.. Number of fuel assemblies (a) in the enre:

193 (b) in the spent fuel pool:

293 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 l

DUKE POWER COMPANY DATE:

June 15, 1988 Name of

Contact:

J. A. Reavis Phone:

704-373-7567 l

n.

0FEFATINS DATA REFORT D3CKET NO 5)-370 DATEJune 15. 1958 OPECATING STATUS COMFLETED BY J. A. Feavis TELEPPONE 704-373-7567

1. Unit hare: McGuire 2
2. Reporting ?eriod: May 1, 1963-May 31, 1965
3. Licensed Thersal fewer (Mat):

3411

4. Nace; late Rating (Gross Nel:

1305*

Notes 'Naseplate Rating

3. Design E1::trical Bating (Net Ne):

1180 (6ross MWe) calculated as

6. Marinus Cependaale Capacity (Sross FWe):

1171 1450.000 M A r.90 pcwer 7, Marious Dependable Capacity (Net Ne):

!!29 factor per Page lit,

9. If Changes Occur in Capacity Ratings (! tees Nester 3 Through 7) Since last hbFES-0020.

Repcrt. Give Reas>ns:

9. Pcwer level To Which Festricted, if Any (het Miel;
10. Feason for Restrictiois, If any:

l l

This Ment 5 Yr.-to-Date Cutulative I

!!. Hcurs in Reporting rerica 744.0 3647.0 37271.0

12. Nester Of Heurs Feactor Was Critical 629.9 3515.1 27960.9
13. Reactar Feserve Stutd m H urs

--0--

--0--

--0--

14. Ecurs Senerator Or-tir,e 629.5 3509.7 27337.0
15. !! nit Feserve Shutdova Hours

--0--

--0--

--0--

16. Gross Thersal Energy Eererated (FWH) 1965065 11687823 E3927776
17. Gross Electrical Erergy Generated (PWH) 633952 4031950 31157753
18. Ne: Electrical Etergy Generated ( NH) 653295 3930677 29566679
19. Unit Service Factor 84.6 96.2 73.3
20. Unit Availability Facter 64.6 96.2 73.3
21. Unit Capacity Facter (Using PDC Net) 77.8 95.5 69.0
22. Unit Capacity Factor (Using DER Fet) 74.4 91.3 67.9
23. Utit Fcrces Cutage Rat?

0.0 0.7 13.3

24. Enutd:wn Scheduled Dyer Next 6 Morahs (Type, Date, and Duration of Each):

Currently Refuelina l

'25. If Stut k an At End Of Repert Fericd Estisated Date of Startep:

July 26, 1988

26. tr.its In Test Status (Prict to Centercial Cperation):

Forecast Achieved i

l l

INITIAL CRITICALITV l-INITIAL ELECTRIC!TY CO9*ERCIALCFEFATION l

~.

OPEFATIh6 DATA REPCRT j

i DOCKET ND 50-370 1

UNIT McGuire 2 DATE Jure 15, 1989 i

CO?fLETED SY J. A. Feavis TELEfH0KE 704 373-7567 MONTH May,1959 i

[

AVERASE CAILY FC.ER LEVEL LA1 AVERAGE DA!LY FCWER LEVEL f

(MWe-Net)

(PWe-Net) i 1

!!45 17

!!A0 t

i 2

1146 18 1139 l

3 1168 19 1137 j

4

!!46 20 1142 5

1146 21 1160 i

6

!!45 22 1140 I

7

! !!.6 23

!!61 l

9

!!!0 24

!!46 f

9

!!44 25 1133

}

10 1144 26 599 11 1166 27 0

12

!!62 25 0

13 1064 E9 0

t 14 272 30 0

j 15 439 31 0

16 997 I

i

D UNIT SHUTDOWNS AND POWER REDUCTIONS:

DOCKET NO.

50-370 UNIT NAME MCGUIRE 2 DATE 06/15/88 REPORT MONTH May 1988 COMPLETED BY J.

A.

REAVIS TELEPHONE' (704)-373-7567 (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE W

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 8p 88 8 S

F ZZ ZZZZZZ LOAD REDUCTION PER DISPATCHER REQUEST 9p 88-5-13 S

F ZZ ZZZZZZ LOAD REDUCTION PER DISPATCHER.

REQUEST IE INSTRU POWER HOLD FOR NUCLEAR 10 p 88-5-16 S

F INSTRUMENTATION CALIBRATION F

ZZ ZZZZZZ POWER REDUCTION PER DISPATCHER I

11 p 88-5-25 S

REQUEST 12 p 88-5-26 F

F RC YYYYYY CORE XENON RESTRICTIONS 3

88-5-27 S

114.52 C

1 RC FUELXX END OF CYCLE 4 REFUELING OUTAGE 1

(1)

(2)

(3)

(4) l F Forced Reason:

Method:

Exhibit G - Instructionsi S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensed C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain)

L DOCKET No:

50-370 UNIT:

McGuire 2 DATE:

06/15/88 L

NARRATIVE

SUMMARY

f Month: May, 1988 McGuire Unit 2 began the month of May operating at 100% full power. The unit reduced power to 92% on 5/08, to help the Dispatcher meet minimum system load, then returned to 100% power at 1000 the same day. The unit then reduced power to 36% power from 1600 on 5/13 to 0245 on 5/16, again per Dispatcher's request.

The unit returned to 100% power at 1646 on 5/16, following a power hold at 90%

for Nuclear Instrumentation Calibration. The unit then reduced power to 71% per Dispatcher's request, at 5/25 at 2135. At 0929 on 5/26, the unit was further i

reduced in power to 50% due to end of core life Xenon restrictions. The unit was then remo.'ed from service at 0529 on 5/27 and finished the month of May in its end of cycle 4 refueling outage, i

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 2 v

2.

Scheduled next refueling shutdown:

May, 1988 3.

Scheduled restart following refueling: July, 1988 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?

Core Design Flexibility If no, has reload o. sign and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool: 449 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

l 9.

Projected date of last refueling which can be accommodated by present licensed capacity:

August, 2010 l

DUKE POWER COMPANY DATE:

June 15, 1988 Name of

Contact:

J. A. Reavis Phone:

704-373-7567 1

___._.-,__.,-.-___...____-m.,_,

7

~.:

4 I'

o McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT 1.

Personnel Exposure

- For the month of April, no individuals exceeded 10 percent of their allowable annual radiation dose limit.

2.

The total station liquid release for April has been compared with' the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.~

t The total station gaseous release for April has been compared with the Technical' Specifications maximum annual dose connitment and was t'

less than 10 percent of this limit.

I i

l l

l l

tl.

h

4 e

DuxE POWER GOMPANY P.O. BOX 03180 citAHLOTTE, N.o. 28242 HALD.TUCKEH TELEPHONE vou Pareseen (704) e7&4831 ELMRAB PRODtTT90sg June 15, 1988 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D. C.

20555 Re: McGuire Nuclear Station Docket No. 50-369 and 50-370

Dear Sir:

h Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of May, 1988.

}

Very truly yours, l'

l Y Hal B. Tucker JAR /8/sbn Attachment xc:

Dr. J. Nelson Grace American Nuclear Insurers Regional Administrator / Region II c/o Dottie Sherman, ANI Library U. S. Nuclear Regulatory Commission The Exchange, Suite 245 f

101 Marietta Street, NW, Suite 29,00 270 Farmington Avenue l

Atlanta, Georgi.a 30323 Farmington, CT 06032 Mr. Phil Ross INPO Records Center l

U. S. Nuclear Regulatory Commission Suite 1500 l

MNBB-5715 1100 Circle 75 Parkway l

Washington, D. C.

2?555 Atlanta, Georgia 30323 Mr. Darl Hood, Project Ms.'ager Mr. Richard G. Oehl, NE-44 l

Office of Nuclear Reactor k.aulation U. S. Department af Energy

(

U. S. Nuclear Regulatory Comn..ssion 19901 Germantown Road Washington, D. C.

20555 Germantown, Maryland 20874 Mr. Robert G. Rogers Mr. W. T. Orders Nuclear Assurance Corporation NRC Resident Inspector 6251 Crooked Creek Road McGuire Nuclear Station Norcross, Georgia 30092

\\ \\

1