ML20195B350
| ML20195B350 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 10/21/1988 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20195B356 | List: |
| References | |
| NUDOCS 8811010536 | |
| Download: ML20195B350 (2) | |
See also: IR 05000266/1988022
Text
G
e
.
s
,
.
.
OCT 211988
Docket No. 50-266
Docket No. 50-301
i
Wisconsin Electric Power Company
ATTN: Mr. C. W. Fay
Vice President
Nuclear Power Department
i<
231 West Michigan, Room 308
Milwaukee, WI 53201
Gentlemen:
This refers to the routine inspection conducted by Mr. R. A. Paul of this office
on September 26-30, 1988, of activities at Point Beach Nuclear Plant, Units 1
and 2, authorized by NRC Operating Licenses No. OPR-24 and No. DPR-27 and to
'
the discussion of our findings with Mr. J. Zach and other members of your
staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
'
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice. A written response
is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
bD
W. D. Shafer, Chief
Radiological Protection Branch
Enclosures:
1.
2.
Inspection Reports
D
No. 50-266/88022(DRSS);
4Q
No. 50-301/88020(DRSS)
\\/
See Attached Distribution
6
g(
2%}.$b
"'b ,
l
J V
@Aaf fr
Paul / aw
G
r
ei'
DeF yette
ADOCK0500g6
/d{I
f y'
Ig p)
8311010536 881021
,
- - _ . _ - _
! ! ..
,
- _
.
.
.
.
Wisconsin Electric Power
2
Company
OCT 21 S88
Distribution
cc w/ enclosures:
~
J. J. Zach, Plant Manager
DCD/DC8 (RIDS)
,
Licensing Fee Management Branch
Resident Inspector, RIII
Virgil Kanable, Chief
Boiler Section
Charles Thompson, Chairman
Wisconsin Public Service-
Commission
R. I. Braund (SLO),
WI Div. of Emergency Government
-
Lawrence J. McDonnell, Chief
Radiation Protection Section
WI Department of Health and
Social Services, Division
of Health
,
l
I
!
i
1
r
L
w