Letter Sequence Request |
---|
EPID:L-2019-LLA-0220, Submission of a Supplement to Nac'S Request for Amendment No. 9 to the Certificate of Compliance No. 1031 for the NAC International Magnastor Cask System (Approved, Closed) |
|
MONTHYEARML20086J5522019-10-0909 October 2019 Request for Additional Information - Enclosure Project stage: RAI ML19326C2732019-11-22022 November 2019 Notice of Partially Closed Post-submittal Meeting on Model No. Magnastor Storage Cask Amendment No. 9 Project stage: Meeting ML19344A1072019-12-12012 December 2019 Acceptance Letter for Magnastor Amendment 9 Project stage: Acceptance Review ML20030C2042020-01-31031 January 2020 December 9, 2019 Summary for Meeting on Magnastor Amendment 9 Project stage: Meeting ML20192A1182020-06-29029 June 2020 Submission of a Supplement to Nac'S Request for Amendment No. 9 to the Certificate of Compliance No. 1031 for the NAC International Magnastor Cask System Project stage: Request ML20307A1212020-11-10010 November 2020 Proposed Approved Contents for Magnastor Amendment No. 9 Project stage: Other ML20307A1162020-11-10010 November 2020 Issuance of Certificate for Magnastor Amendment 9 Project stage: Request ML20307A1202020-11-10010 November 2020 Final Technical Specifications Appendix a and B for Magnastor Amendment 9 Project stage: Other ML20307A1192020-11-10010 November 2020 Final Safety Evaluation Report - NAC International, Inc., Magnastor Storage System, Amendment No. 9 Project stage: Approval ML20307A1182020-11-10010 November 2020 Final Certificate of Compliance for Spent Fuel Storage Casks for Magnastor, Amendment 9 Project stage: Other ML20307A1172020-11-10010 November 2020 Transmittal Letter - Amendment No. 9 to Certificate of Compliance No. 1031 for Magnastor Storage System Project stage: Other ML21091A0262021-03-31031 March 2021 E-mail for Approval of Proprietary Withholding for Magnastor Amendment 9 Submittal and RAI Response Project stage: RAI 2020-01-31
[Table View] |
|
---|
Category:Letter
MONTHYEARML24226B2182024-09-0606 September 2024 Cover Letter - Request for Additional Information for Review of the Magnastor Storage System Amendment No. 15, Certificate of Compliance No. 1031 ML24219A2272024-08-0606 August 2024 NAC International Magnastor Cask System Amendment No. 14 Supplement ML24179A0722024-06-26026 June 2024 Submittal of Responses to the Nuclear Regulatory Commission Request for Additional Information for NAC International Magnastor Cask System Amendment No. 14 ML24169A5902024-06-21021 June 2024 NRC Approval of NAC International Request for Withholding Information Magnastor Amendment 15 ML24149A3682024-06-0505 June 2024 Request for NAC International Magnastor Cask System Amendment 15 - Accepted for Review - Cost Activity Code/Enterprise Project Identification Number 001028/L-2023-LLA-0143 ML24120A0362024-05-0707 May 2024 Application for Amendment No. 14 to the Model No. Magnastor Storage Cask - Request for Additional Information ML24082A1302024-04-18018 April 2024 NAC International - USNRC Inspection Report 0721031/2023201 Final Letter ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24088A1752024-04-0909 April 2024 Amendment No. 14 and Magnastor Revisions to the Model No. Magnastor Storage Cask - Acceptance Letter ML24047A3632024-02-16016 February 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX177, AMZDFX178, AMZDFX179 Vertical Concrete Cask Identification No. AMZDNE179, AMZDNE178 ML24008A2482024-01-0808 January 2024 NAC International, Response to Apparent Violations (a and B) in NRC Inspection Report 72-1031/2023-201; EA-2023-069 ML23283A2382023-12-0707 December 2023 NAC International, Inc. - U.S. Nuclear Regulatory Commission Inspection Report 72-1031/2023-201 ML23300A1382023-10-26026 October 2023 Supplement to NAC Internationals Submission of an Amendment Request for the NAC International Magnastor Cask System Amendment No. 15 ML23305A0462023-10-26026 October 2023 Submittal of Data Files to Support the Request to Amend the U.S. Nuclear Regulatory Commission Certificate of Compliance No. 1031 for the NAC International Magnastor Cask System, AmendmentNo.15, Supplement 01 ML23291A1672023-10-18018 October 2023 Supplement to the Amendment Request No. 14 for the NAC International Magnastor Cask System ML23258A2332023-09-15015 September 2023 Submission of Replacement Pages for Supplemental Responses to the Nuclear Regulatory Commissions (NRC) Request for Additional Information for the NAC International Magnastor Cask System, Amendment No. 13 ML23250A3242023-09-12012 September 2023 1. Transmittal Letter Magnastor Issuance of Amendment Nos 11 and 12 and Revision of Amendment Nos 0 Through 9 ML23241B0532023-08-29029 August 2023 Submission of an Amendment Request for the NAC International Magnastor Cask System Amendment No. 15 ML23243A8492023-08-29029 August 2023 NAC International, Submittal of Data Files to Support the Request to Amend the U.S. Nuclear Regulatory Commission Certificate of Compliance No. 1031 for Magnastor Cask System, Amendment No.15 ML23229A4812023-08-17017 August 2023 Submittal of Supplemental Responses to the Nuclear Regulatory Commissions (NRC) Request for Additional Information for the NAC International Magnastor Cask System, Amendment No. 13 ML23207A2492023-07-26026 July 2023 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX167 and AMZDFX169 and Vertical Concrete Cask Identification Numbers ML23205A2382023-07-24024 July 2023 Submittal of an Amendment Request for the NAC International Magnastor Cask System Amendment No. 14 ML23208A0622023-07-24024 July 2023 NAC International - Submission of Data Files to Support the Nuclear Regulatory Commissions (NRC) Review of Magnastor Amendment No. 14 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23178A2252023-06-27027 June 2023 Submission of Responses to the Nuclear Regulatory Commissions (NRC) Request for Additional Information for the NAC International Magnastor Cask System, Amendment No. 13 ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23074A2522023-03-29029 March 2023 Application for Amendment No. 13 to the Model No. Magnastor Storage Cask – Request for Additional Information ML23076A2272023-03-17017 March 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX165 and AMZDFX166 and Vertical Concrete Cask Identification Numbers ML23005A2572023-01-0505 January 2023 Request to Withdraw Administrative Controls for Adverse Weather Events During Operations from Magnastor Amendment 12 Supplement ML22349A4682022-12-19019 December 2022 Amendment No. 10 to Certificate of Compliance No. 1031 for the Magnastor Storage System ML22340A5902022-12-0808 December 2022 Acknowledgement Letter - Magnastor Amendment 13 ML22327A2252022-11-23023 November 2022 NAC International - Magnastor Cask System Users CoC Amendment 12 Supplement and Intent to Adopt Letters ML22321A2682022-11-17017 November 2022 Supplement to the Submission of an Amendment Request for the NAC International Magnastor Cask System, Amendment No. 13 ML22308A1942022-11-0909 November 2022 NAC International, Inc. - U.S. Nuclear Regulatory Commission Report No. 72-1031/2022-201 ML22287A0382022-10-13013 October 2022 Supplement to the Submission of an Amendment Request for the NAC International Magnastor Cask System, Amendment No. 13 ML22257A2562022-09-14014 September 2022 Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX170 and AMZDFX174 and Vertical Concrete Cask Identification Numbers AMZDNE170 and AMZDNE174 ML22230D0802022-08-18018 August 2022 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Container ML22216A1102022-08-0404 August 2022 Magnastor Cask System Users CoC Amendments 0 Thru 9 Intent to Adopt Letters ML22208A0782022-07-27027 July 2022 Registration of Use of Cask to Store Spent Fuel ML22196A0232022-07-15015 July 2022 Submittal of Supplemental Information to the NRCs Request for Additional Information for the NAC International Magnastor Cask System Amendment No. 11 ML22201A0662022-07-13013 July 2022 NAC International, Inc., Submittal of Data Disk for the Magnastor Cask System, Amendment No. 13 ML22194A9082022-07-13013 July 2022 NAC, Submittal of an Amendment Request for the NAC International Magnastor Cask System, Amendment No. 13 ML22111A3572022-05-16016 May 2022 Letter Issuing Exemption to Catawba ML22111A3112022-05-16016 May 2022 Letter Issuing Exemption to McGuire ML22110A1112022-05-13013 May 2022 Letter Issuing Exemption to TMI-1 ML22111A2842022-05-13013 May 2022 Independence Spent Fuel Storage Installation - Issuance of Exemption ML22125A1532022-05-0505 May 2022 Registration of Use of Casks to Store Spent Fuel ML22118B1622022-04-28028 April 2022 Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Design Requirements - Supplement RS-22-062, Supplemental Information to Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-26026 April 2022 Supplemental Information to Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System ML22108A1972022-04-18018 April 2022 RAI Response to NACs Amendment Request for the NAC International Magnastor Cask System Amendment No. 12 2024-09-06
[Table view] |
Text
Atlanta Corporate Headquarters 3930 East Jones Bridge Road, Suite 200 Norcross, GA 30092 Phone 770-447-1144 www.nacintl.com June 29, 2020 U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Attn: Document Control Desk
Subject:
Submission of a Supplement to NAC's Request for Amendment No. 9 to the Certificate of Compliance No. 1031 for the NAC International MAGNASTOR Cask System Docket No. 72-1031
References:
- 1. U.S. Nuclear Regulatory Commission (NRC) Certificate of Compliance (CoC) No. 1031 for the NAC International MAGNASTOR Cask System, Amendment No. 7, March 24, 2019
- 2. MAGNASTOR Cask System Final Safety Analysis Report (FSAR),
Revision 10, NAC International, February 2019
- 3. ED20190099, Submission of a Request to Amend the U.S. Nuclear Regulatory Commission Certificate of Compliance No. 1031 for the NAC International MAGNASTOR Cask System, October 9, 2019
- 4. Application for Amendment No. 9 to The Model No. MAGNASTOR Storage Cask - Request for Additional Information, March 27, 2020
- 5. ED20200050, Submission of Responses to the U.S. Nuclear Regulatory Commission Request for Additional Information for Amendment No. 9 to the Certificate of Compliance No. 1031 for the NAC International MAGNASTOR Cask System, April 9, 2020 NAC International (NAC) hereby submits a replacement page to Reference 3. Specifically, FSAR Page 2.2-5. This page contains a table which defines the maximum heat load per storage location, as shown in Figure 2.2-1. This table contains several numerical values that are incorrect and is directly used in the proposed Amendment 9 MAGNASTOR CoC Appendix B Technical Specifications. Thus, NAC is resubmitting this page with corrected values. Note, this table consolidated all previously approved amendments into one table. The values corrected are as follows:
- Pattern C, Zones Bl, B2, and B3 - as discussed in the Reference 5 submittal, these values were inadvertently reversed; NAC corrected the proposed Technical Specifications but did not correct this table in the submittal; the values have been corrected to match the proposed Technical Specifications (i.e., Zone Bl should be 1,800 and Zones B2 and B3 should be 1,300 ED20200087
INAC f .. INTERNATIQNA~
U.S. Nuclear Regulatory Commission June 29, 2020 Page 2 of 2
- Pattern E, Zone C3 - this value has been updated to 1,000
- Pattern G, Zones Al, A3, and C2-Zones Al and A3 have been updated to be 300 and Zone C2 has been updated to 650 The editorial corrections for Pattern E and G are supported by the existing analyses provided in the 19B submittal (i.e., Submittal 19B FSAR Figures 4.11-1 and 4.11-3). The heat load limits for Pattern C were approved via a previous amendment request.
In accordance with NAC's administrative practices, upon final acceptance of this application, the 19B changed pages (Reference 3) and this submittal's FSAR replacement page will be reformatted and incorporated into the next revision of the MAGNASTOR FSAR. NAC is requesting an effective date for this amendment to be prior to March 2021.
Sincy If you have any comments or questions, please contact me on my direct line at 678-328-1236.
Wren Fowler Director, Licensing Engineering
Enclosures:
- Submittal 19B FSAR Replacement Page ED20200087
ANAC
~I ,INTERNATIQNA~
Enclosure 1 Submittal 19B FSAR Replacement Page
,: I *
,. , I ED20200087
MAGNASTOR System FSAR September 2019 Docket No. 72-1031 Revision 198 Figure 2.2-1 PWR Fuel Preferential Loading Patterns DFC Location
)) 4 (2)
C5 (5) (6) (7)
C1 (10)
B2
_m B3 B1 (12)
A1 B3 (13)
A3 (14)
B2
~
(16) (17) (18) (19) (20) (22)
C2 B1 A1 A2 A1 1 C2 (24) ~ (26) (27] (28) (29)
B2 A1 A3 82 C3
~ (33) w (30) (31)
C1 B3 B1 83 (35) (36)
C4 C5 C4 DFC Location Loadina Pattern and Maximum Heat Load per Storaae Location (W <1>
Storage A 8 C D E F G H Location A1 959 922 513 811 425 350 300 300 A2 800 800 800 800 A3 425 350 300 800 81 1,200 1,800 1,300 1,000 2,500 2,000 82 1,300 1,100 900 600 800 83 250 250 700 700 C1 800 830 950 1,800 800 800 C2 900 900 650 750 C3 1,000 900 2,000 2,050 C4 3,400 2,800 1,500 1,500 cs -- 150 950 950 Max Heat Load per 35,500 35,500 35,500 30,000 35,500 35,500 35,500 35,500 Cask CE16x16 CE16x16 BW15x15 BW15x15 BW15x15 BW15x15 Pattern Use when None None or in MTC2 in MTC2 in MTC2 in MTC2 Limitations using the W14x14 and CC6 and CC6 and CC6 and CC6 PMTC Note that, while the total heat load per canister is limited to 35.5 kW, the heat loads used in the analyses are 38 kW, 36.3 kW, 38.8 kW and 40 kW for Patterns X, Y, Zand Z-Prime, respectively (which is the summation of columns E, F, G, andH).
NAC International 2.2-5
MAGNASTOR System FSAR September 2019 Docket No. 72-1031 Revision 19B Figure 2.2-2 82-Assembly-BWR Basket Pattern
@= Fuel Assembly Locations CTI Vent/Drain Port Locations X Designated Nonfuel Locations Figure 2.2-3 [DELETED]
NAC International 2.2-6