MONTHYEARML20294A5522020-12-0909 December 2020 Final Accident Sequence Precursor Analysis - Brunswick Steam Electric Plant (Unit 1), Loss of Offsite Power During Hurricane Isaias (LER 325-2020-003) - Precursor ML20168A4402020-06-16016 June 2020 Final ASP Analysis - Brunswick 2 (LER 324-75-005) ML20168A4442020-06-16016 June 2020 Final ASP Analysis - Brunswick 2 (LER 325-79-089) ML20168A4432020-06-16016 June 2020 Final ASP Analysis - Brunswick 2 (LER 324-79-050) ML20168A4422020-06-16016 June 2020 Final ASP Analysis - Brunswick 2 (LER 324-77-054) ML20168A4412020-06-16016 June 2020 Final ASP Analysis - Brunswick 2 (LER 324-75-013) ML20168A4392020-06-16016 June 2020 Final ASP Analysis - Brunswick 1 (LER 325-77-001) ML20147A4762020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-87-004) ML20147A3602020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-82-025) ML20147A3612020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-82-041) ML20147A3622020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-82-054) ML20147A3652020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-84-006) ML20147A3662020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-84-014) ML20147A4692020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-85-059) ML20147A4712020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-82-005) ML20147A4722020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-82-029) ML20147A4732020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-82-123) ML20147A4742020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-84-014) ML20147A4752020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-87-001) ML20147A4772020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-89-009) ML20147A3642020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-82-069) ML20147A4702020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-81-039) ML20147A3592020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-81-032) ML20135G7292020-05-14014 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-91-018) ML20050R5682020-02-20020 February 2020 Final Accident Sequence Precursor Analysis-Brunswick Unit 1, Degraded Principal Barrier, Technical Specification Shutdown, and Automatic System Actuation (LER 325-2019-002)-Training/Reject ML17109A2692017-03-17017 March 2017 Final ASP Analysis-Brunswick 1 (LER 325-2016-001) 2020-06-16
[Table view] Category:Final
MONTHYEARML20294A5522020-12-0909 December 2020 Final Accident Sequence Precursor Analysis - Brunswick Steam Electric Plant (Unit 1), Loss of Offsite Power During Hurricane Isaias (LER 325-2020-003) - Precursor ML20168A4402020-06-16016 June 2020 Final ASP Analysis - Brunswick 2 (LER 324-75-005) ML20168A4442020-06-16016 June 2020 Final ASP Analysis - Brunswick 2 (LER 325-79-089) ML20168A4432020-06-16016 June 2020 Final ASP Analysis - Brunswick 2 (LER 324-79-050) ML20168A4422020-06-16016 June 2020 Final ASP Analysis - Brunswick 2 (LER 324-77-054) ML20168A4412020-06-16016 June 2020 Final ASP Analysis - Brunswick 2 (LER 324-75-013) ML20168A4392020-06-16016 June 2020 Final ASP Analysis - Brunswick 1 (LER 325-77-001) ML20147A4762020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-87-004) ML20147A3602020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-82-025) ML20147A3612020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-82-041) ML20147A3622020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-82-054) ML20147A3652020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-84-006) ML20147A3662020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-84-014) ML20147A4692020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-85-059) ML20147A4712020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-82-005) ML20147A4722020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-82-029) ML20147A4732020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-82-123) ML20147A4742020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-84-014) ML20147A4752020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-87-001) ML20147A4772020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-89-009) ML20147A3642020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-82-069) ML20147A4702020-05-26026 May 2020 Final ASP Analysis - Brunswick 2 (LER 324-81-039) ML20147A3592020-05-26026 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-81-032) ML20135G7292020-05-14014 May 2020 Final ASP Analysis - Brunswick 1 (LER 325-91-018) ML20050R5682020-02-20020 February 2020 Final Accident Sequence Precursor Analysis-Brunswick Unit 1, Degraded Principal Barrier, Technical Specification Shutdown, and Automatic System Actuation (LER 325-2019-002)-Training/Reject ML17109A2692017-03-17017 March 2017 Final ASP Analysis-Brunswick 1 (LER 325-2016-001) 2020-06-16
[Table view] |
Text
ovember 20, 1979 ROIC Turbine Trips with HPCI Unavailable at Brunswick 2 re sequence was:
tor trip occurred. (reason unspecified) was unavailable due to maintonance.
initiated on low-low reactor water level (-38 inches).
RCIC turbine tripped on overspeed.
was reset and manually set into operation. The reactor water level had hed -40 inches.
e action:
investigation revealed a crack in the amphenal connector to the tachometer ausing a loose connection. This connector was replaced and the turbine ith satisfactory results.
urpose of failed system or component:
RCIC provides reactor core cooling and water level control during a loss of water flow.
tachometer monitors the turbine speed for control purposes.
ility of system per WASH 1400:
- RCIC: 8 x 10-2/D ility of component per WASH 1400:*-
vailabilities are in units of per demand D-1 . Failure rates are in per hour HR-1
Damage No No - ADS/CS/LPCI available ahould both HPCI and RCIC fail No No I_______________________________
No - ADS/CS/LPCI available should both HPCI and RCIC fail ATWS C 153810 - Actual Occurrence of RCIC Turbine Trip with H-PCI Unavailable at Brunswick 1
No Yes 2 No 3 Yes4 Yes 5 Yes Yes 7 NSIC 153810 - Sequence of Interest for RCIC Turbine Trip with ff201 Unavailable at Brunswick 1
'Success requires the operator to reset and manually start RCIC.
ION NUMBER: 153810
- December 17, 1979 NT: November 20, 1979 LVED: RCIC INVOLVED: Tachometer chanical failure INTEREST: Loss of feedwater flow RRENCE: RCIC turbine trip with HPCI unavailable ME: Brunswick 1 BER: 50-325 PE: BWR TRICAL RATING: 821 MWe
- 3.11 yr E
NGINEERS: United Engineers and Constructors Carolina Power and Light Co.
Three miles N of Southport, NC N/A TING CONDITION: Scrammed URE TYPE OF FAILURE: (a) inadequate performance; (b) failed to start;
~made inoperable; (d) ___________
ETHOD: operator surveillance