ML20155J904
| ML20155J904 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 05/20/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H, Tuckere H DUKE POWER CO. |
| Shared Package | |
| ML20155J907 | List: |
| References | |
| NUDOCS 8605270232 | |
| Download: ML20155J904 (2) | |
See also: IR 05000413/1986018
Text
p
-
----..
,
SAFEGUARDS INFORMATION
MAY 2 01986
Duke Power Company
ATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NOS. 50-413/86-18 AND 50-414/86-20
On April 28 - May 2,1986, NRC inspected activities authorized by NRC Operating
License Nos. NPF-35 and NPF-48 for your Catawba facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments. The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosures to
this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in NRC's Public Document Room.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
8605270232 860520
Virgil L. Brownlee, Chief
f
ADEK 05000413
Reactor Projects Branch 3
Division of Reactor Projects
Enclosures:
1.
(Safeguards Information)
2.
Inspection Report Nos. 50-413/86-18
and 50-414/86-20
(Safeguards Information)
EMCI.OSURE CONTAINS
cc w/encls (See page 2)
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
SAFEGUARDS INFORMATIONnot Ic ocCoNTaor.I.to.
16-04,I
.
r
~
SAFEGUARDS INFORMATION
,
MAY 201986
Duke Power Company
2
'
.
cc w/encis:
R. L. Dick, Vice President -
Construction
J. W. Hampton, Station Manager
-
bec w/encls:
IE File
NMSS/SGPL
NRR/DL/SSPB
bec w/ Inspection Summary:
Document Control Desk, 016
NRC Resident Inspector
State of South Carolina
1)
R1
RII
,11
[Ennis:
ve we m
CB ger
J
3W
uire
arr
J
- e
5/g/86
6/p/86
. '
'naI/86
el
_s,r,ee
e
ee
I
sarrav_anns_U:
AI.,
UPON M*FARATION TH
SAFEGUARDS INFORMATION
PAGE.
OEcot:rnoLLED.