Requests Review by 860531 of Encl plant-specific List of Resolved Generic Issues.In Future,Nrr Will Need Estimated Dates Prior to Issuance of Safety Evaluation,To Aid in long-term Program
ML20155H087
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/02/1986
From: Kintner L
Office of Nuclear Reactor Regulation
To: Kingsley O
MISSISSIPPI POWER & LIGHT CO.
References
TASK-***, TASK-TM NUDOCS 8605120498
Download: ML20155H087 (7)


Text

7 T

o UNITED STATES E

'g NUCLEAR REGULATORY COMMISSION n

g E

W ASHINGTON, D. C. 20555 b.....*

MY 1W Docket No. 50-416 Mr. Oliver D. Kingsley, Jr.

Vice President, Nuclear Operations Mississippi Power & Light Company P.O. Box 23054 Jackson, Mississippi 39205

Dear Mr. Kingsley:

SUBJECT:

GRAND GULF NUCLEAR STATION UNIT 1 - SCHEDULE FOR IMPLEMENTATION OF RESOLVED GENERIC ISSUES The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory improvements.

To assist me in developing this information for Grand Gulf Nuclear Station, Unit 1, please review the enclosed plant-specific list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed / implemented or are expected to be completed. For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed. For requirements that have not been completed / implemented, provide the projected date and enter " projected" under the Status column. I do not expect or want a major effort made to obtain

. precise dates. Rather, I will accept readily-known or best-estimate dates for actions that have been completely implemented.

For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time. For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter.

Please provide a response in the fom of a marked up listing by May 31, 1986.

In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be included in the evaluation.

8605120498 860502 PDR ADOCK 05000416 p

PDR m

ik

,'f This request is covered by OMB Clearance Number 3150-0011, which expires i

September 30, 1986.

Sincerely, W

L. L. Kintner, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing i

i

Enclosure:

As stated cc: See next page

.l 1

i l

s f

i i

i

)

f

.m-

Mr. Oliver D. Kingsley, Jr.

Mississippi Power & Light Company Grand Gulf Nuclear Staiton cc:

Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.

Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, Liberman, Cook, Purcell Office of the Governor and Reynolds State of Mississippi 1200 17th Street, N.W.

Jackson, Mississippi 3)201 Washington, D. C.

20036 Attorney General Mr. Ralph T. Lally Gartin Building Manager of Quality Assurance Jackson, Mississippi 39205 Middle South Services, Inc.

P.O. Box 61000 Mr. Jack McMillan, Director New Orleans, Louisiana 70161 Division of Solid Waste Management Mississippi Department of Natural Mr. Larry F. Dale, Director Resources Nuclear Licensing and Safety Bureau of Pollution Control Mississippi Power & Light Company Post Office Box 10385 P.O. Box 23054 Jackson, Mississippi 39209 Jackson, Mississippi 39205 Alton B. Cobb, M.D.

Mr. R. W. Jackson, Project Engineer State Health Officer Bechtel Power Corporation State Board of Health 15740 Shady Grove Road P.O. Box 1700 Gaithersburg, Maryland 20877-1454 Jackson, Mississippi 39205 Mr. Ross C. Butcher President Senior Resident Inspector Claiborne County Board of Supervisors U.S. Nuclear Regulatory Commission Port Gibson, Mississippi 39150 Route 2, Box 399 Port Gibson, Mississippi 39150 Mr. Ted H. Cloninger Vice President, Nuclear Engineering Regional Administrator, Region II and Support U.S. Nuclear Regulatory Commission, Mississippi Power & Light Company 101 Marietta Street, N.W., Suite 2900 Post Office Box 23054 Atlanta, Georgia 30323 Jackson, Mississippi 39205 Mr. J. E. Cross Grand Gulf Nuclear Station Site Director Mississippi Power & Light Company P.O. Box 756 Port Gibson, Mississippi 39150 Mr. C. R. Hutchinson GGNS General Manager Mississippi Power & Light Company Post Office Box 756 Port Gibson, Mississippi 39150

1 f

Enclosure i

Computer Listing of MultiplantActions(MPAs) for Grand Gulf Unit 1

("c" after date indicates date the licensingactionwascompleted)

J 1

I i

i l

1 l

1 i

t t

4 i

i,-,

., -, - _. =. _. = _. _.

.. _ ~... _... - - -, -... - - -. -. _.... ~. _.

R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE8 FACILITY IMPLEMENTATION FACILITY: GRAND utiF 1 PLANT LOCATION: 25 MI S'0F VICKSBURG, MISS LICENSED P0HER: 3833 MHT PROJECT MANAGER: L. KINTNER DOCKET NUMBER:

050-00416 DESIGN P0HER:

1250 MHE BRANCH CHIEF:

H.

BUTLER ARCH / ENGINEER:

BECH NSSS VENDOR:

GE LIC. ASSISTANT:

. VACANT IE INSPECTOR:

R. BUTCHER LIC ACT LICENSEE TAC NO.

MPA 8 TITLE COMPLETE STATUS DAlf M51094 A-17 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDEN7* 08/22/86 M55711 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 08/31/84C M59099 A-20 10 CFR 50.62 OPERATING REACTOR REVIENS 09/12/86 M51679 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 09/01/84C

, M52761 B-76 ITEM 1.1 - POST TRIP REVIEH; PROGRAM DESCRIPTION &

05/10/85C M52842 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER 12/31/86 M52923 B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDU 12/31/86 M53004 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 08/14/85C M54537 B-83 TECH SPECIFICATIONS COVERED BY GENERIQ LETTERS 83-36 09/01/84C 4 f3-37 M56304 B-84 INSPECTIONS OF BNR STAINLESS STEEL PIPING ACCORDIN 03/27/85C

({r L f y -st)

M53593 B-85 SALEM ATHS 1.2 DATA CAPABILITY 10/22/85C M53676 B-86 SALEM ATHS 2.2 S-R COMPONENTS 12/31/86 M53759 B-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS (Mbh h $

M53842 B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS 12/06/85C M54069 B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FEATURES-12/31/86 M53986 B-93 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES 12/31/86

'M49994 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE I 09/01/84C H52232 C-15 CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPA 04/04/85C M55863 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 10/03/86 M57393 F-05 I.C.1.2/3.8 PROCEDURES GENERATION PACKAGES (NUREG 07/31/86 1

l l

Q-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PACE N FACILITY IMPLEMENTATION GRAND GULF 1 (CONTINUATION)

~

LIC ACT LICENSEE TAC NO.

MPA 3 TITLE COMPLETE STATUS DAIE M51164 F-08 I.D.1.1. DETAILED CONTROL ROOM DESIGN REVIEW PROGRA 08/01/85C M51244 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 07/15/86 M49993 F-12 II.B.3 POST ACCIDENT SAMPLING 09/01/84C M54587 F-14 II.D.1 RV AND SV TRAININO 08/15/85C M49459 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE 03/18/85C M56447 F-48 II.K.3.18 ADS ACTUATION 07/18/86 M49992 F-55 II.K 3.28 QUALIFICATION OF ADS ACCUMULATORS 11/22/85C M57390 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 07/25/86 M57391 F-64 III.A.I.2 OPERATIONAL SUPPORT CENTER 07/25/86 M57392 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 07/25/86 M56127 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FDLLONUP TO 11/28/86 e

i This request is covered by 0MB Clearance Number 3150-0011, which' expires September 30, 1986.

Sincerely, Original signed by L. L. Kintner, Project Manager BWR Project Directorate.No. 4 Division of BWR Licensing

Enclosure:

As stated i

cc: See next page DIS"RIBUTION peclat m je; NRC PDR Local'PDR PD#4 Reading RBernero Young, OELD JPartlow EJordan BGrimes l

LKintner M0'Brien ACRS(10)_

HSmith SScott i

$h k.

PD#4/PM PD#4/D LKintner:lb WButler

/jc/86

[/g /86 4

w

-m a,.,

-,ry-

~-r,,

1,

,wnw w