APR 111986
Docket No. 50-461
Illinois Power Company
ATTN: Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
~
This refers to the routine safety inspection conducted by Messrs. S. G. DuPont
-and G. O'Dwyer of this office on February 24 through March 13, 1986, of
activities at Clinton Power Station authorized by NRC Construction Permit
- Ho. CPPR-137 and to the discussion of our findings with Mr. J. S. Perry and
others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. .Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice. A written response
is required.
In your response, please address your program for ensuring that
safety-related equipment is not degraded or damaged during the period following
completion of testing and prior to issuance of an operating license.
Certain other activities, set forth in the enclosure to this letter, appear
to be a deviation from certain' guides, codes and standards which have been
endorsed by the Commission.
Please advise us in writing within thirty days
of the date of this. letter of the corrective action you have taken or plan to
take, showing the estimated date of completion with regard to this deviation.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice (Order)
are not subject to the clearance procedures of the Office of Management
and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
8604170468 860411
hDR
ADOCK 05000461
l
$30/
__ - _ _ _ _ _ _ _ -
,:
.
Illinois Power Company
2
APR 111986
We will gladly ciscuss any questions yct. have concerning this inspection.
Sincerely,
ORIGINAL SIGNED BY CARL J. PAPERIEl.L0
Carl J. Paperiello, Director
Division of Reactor Safety
Enclosures:
l
1.
2.
Notice of Deviation
-3.
Inspection Report
No. 50-461/86013(DRS)
cc w/ enclosure:
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
Gary N. Wright, Manager-
. Nuclear Facility Safety
Jean Foy, Prairie Alliance
Mark Jason, Assistant
Attorney General,
Environmental Control Division
H. S. Taylor, Quality Assurance
Division
~
-
RIII Y
I
RIII
II
RIII
RIIff
"$
" Wa
&
D
t jlk
O'Dwyer
Ring
D
uin
d
Hehl
Pa ' r'iello
04/09/86
qit ' fD
m