ML20155D565

From kanterella
Jump to navigation Jump to search
Forwards SPDS Rept for Calvert Cliffs Nuclear Power Plant & Remote I/O Equipment Hardware Acceptance Test Procedure for NUS Corp/Bge Calvert Cliffs Data Acquisition Sys, Per 850204 Commitment.Spds Displayed Data Deemed Adequate
ML20155D565
Person / Time
Site: Calvert Cliffs  
Issue date: 09/30/1988
From: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20155D568 List:
References
RTR-NUREG-0737, RTR-NUREG-737 GL-82-33, NUDOCS 8810110304
Download: ML20155D565 (2)


Text

-

I B ALTIMORE OAS AND ELECTRIC i

CHARLES CENTER a P. O. BOX 1475 ' BALTIMORE. MARYLAND 21203 t

i JostpH A.TIERNAN j

w et Persione t NucWan ENgacy j

September 30, 1988 t

U. S. Nuclear Regulatory Commission Washington, DC 20555 i

ATTENTION:

Document Control Desk i

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Safety Parameter Disclav System Report

REFERENCES:

(a) Letter from hir. A. E. Lundvall, Jr. (BG&E) to hir. J. R. hiiller (NRC), dated June 6,1984, SPDS Safety Analysis (b) Letter from hir A. E. Lundvall, Jr. (BG&E) to hir. J. R. hiiller i

(NRC), dated February 4, 1985, Safety Parameter Display System i

(SPDS) j Gentlemen:

Supplement I to NUREG-0737 (Generic Letter 82-33) requires each licensee to submit for NRC review a safety analysis and an implementation plan for the installation and l

operation of the Safety Parameter Display System (SPDS). Reference (a) satisfied this requirement. We provided you with additional information in Reference (b) and j

committed to incorporate that information into the SPDS Report. The Enclosure satisfies this commitment, reflects design improvements made during implementation, updates operational status and supplies additional test information on isolation modules. The SPDS has met the July i,1988 operational deadline date established for both Units 1 and 2.

The Safety Evaluation contained in your hiarch 24, 1986 letter used information from References (a) and (b) to confirm that SPDS displayed data is adequate, valid and readily perceived and comprehended, in addition, the SPCS was found to be suitably l

isolated from safety-related systems. The basis for this determination was that the power input to the Data Acquisition System (DAS) remote input / Output (I/0) cabinets is I

Class IE, You further state that a confirmatory review of the isolation modules would be required if the power input is non-Class IE. Since we are using a non-Class IE power supply, we hase included additional test information to confirm that the modules can withstand the mar.imum credible fault without degrading the Class IE side. This additional information should be sufficient for you to confirm that the isolation moduln are suitably qualified as isolators.

J l

(,

8810110304 880930 PDR ADOCK 05000317 P

PDC i

Document Control Desk September 30, 1988 Page 2 Should you have any further questions regarding this matter, we will be pleased to i

discuss them with you.

I i

Very truly yours, l