r-ATTACISIENT PROPOSED CHANGE TO APPENDIX A TECHNICAL SPECIFICATION TO OPERATING LICENSES NPF-11 AND NPF-18 REVISED PAGES:
NPF-11 NPF-18 3/4 1-10 3/4 1-10 8604170125 860404 PDR ADOCK 05000373 P
PDR 1497K
- ;r REACTIVITY CONTROL SYSTEM SURVEILLANCE REQUIREMENTS 4.1.3.5 Each control rod scram accumulator shall be determined OPERABLE:
a.
At least once per 7 days by verifying that the indicated pressure is greater than or equal to 940 psig unless the control rod is inserted and disarmed or scrammed.
b.
At least once per 18 months by:
1.
Performance of a:
a)
CHANNEL FUNCTIONAL TEST of the leak detectors, and b)
CHANNEL CALIBRATION of the pressure detectors, with the alarm setpoint 940 e M ig on decreasing pressure.
l J
1 LA SALLE - UNIT 1 3/4 1-10 Amendment No. 28 n
f-g,,. *
(
REACTIVITY CONTROL SYSTEM SURVEILLANCE RECUIREMENTS Each control red scram accumulator shall be determined OPERA 8i.E:
4.1.3.5 At least once per 7 days by verifying that the indicated pressure is a.
greater than or equal to 940 psig unless the control rod is inserted and disarmed or scrammed.
b.
At least once per 18 months by:
1.
Performance ef a:
a)
CHANNEL ~UNCTIONAL TEST of the leak detectors, and b)
CHANNEL CA'IBRATION of the pressure detectors, with the alarm setpoint 940 N -UJpsig on decreasing pressure.
j f
l I'
LA SALLE - UNIT 2 -
3/4 1-10 Amendment No. 6 l