ML20155C293
| ML20155C293 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 06/09/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20155C296 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.05, TASK-TM NUDOCS 8806140151 | |
| Download: ML20155C293 (2) | |
See also: IR 05000285/1988013
Text
_ _ _ _ _ _ .
-
.
.
.
,
t.
. /
0-
MMf
_ . g=
.,
In Reply Refer To:
Docket:
50-285/88-13
4g
Omaha Public Power District
ATTN:
R. L. Andrews, Division' Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Messrs.
D. H. Harroll, T. Reis, and
R. P. Mullikin of this off. ice during the period April 1-30, 1988, of activities
authorized by NRC Operating License DPR-40 for the Fort Calhoun Station, and to
the discussion of our findings with you and other members of your staff at th-
conclusion of the inspection.
Areas examined during the inspection included followup on previously identified
items, licensee event report followup, operational safety verification, plant
tours, safety-related system walkdown, monthly maintenance observations,
monthly surveillance observations, security observations,- radiological
protection observations, in-office review of periodic and special reports,
followup on the licensee's program for sampling the emergency diesel generator
fuel oil supplies, followup on NUREG-0737 (TMI) Item II.K.3.5 concerning
tripping of reactor coolant pumps.after a loss-of-coolant accident and followup _
on the potential for inadvertent dilution of the reactor coolant system via the
sodium hydroxide tank.
Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Concequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rules of Practh.e," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclused with this letter.
[
We have also examined actions you have taken with regard to previously
!
identified inspection findings.
The status of these items is identified in
'
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
b
C: DRP/B
)RP
RI
RIV
TReis/nc
PHHarell
RPMullikin
TFWesterman
LJCallan
l
6 /7 /88
6 /-( /88
/, /3 /88
- /6 /88
G /q /88
!
{C[al
8806140151 880609
ADOCK 05000285
Q
nnn
Tf
.,,
-. .~
._ _._ ~_.,,
_ - , _ _
. . _
-
_
.
.
.
. .
'
s.
>
Omaha Public Power District
-2 '
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
eginal Signed By.
L .~J. CallM
L. J. Callan, Director
Division c.' Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix 6 - NRC Inspectio,' Report
50-285/88-13
cc w/ enclosures:
W. G. Gates, Manager
Fort Calhoun Station
P. O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, DC 20036
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
R. D. Martin, RA
- MIS System
- Section Chief (DRP/B)
- DRP
l
- RIV File
- Project Engineer (DRP/B)
l
- RSTS Operator
- A. Bournia, NRR Project Manager
'
- Lisa Shea, RM/ALF
- RRI
"DRS
- TSS
- w/766
1
<