ML20155A894

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/88-24 on 880716-0812 & Notice of Violation
ML20155A894
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/19/1988
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20155A895 List:
References
NUDOCS 8810060109
Download: ML20155A894 (2)


See also: IR 05000302/1988024

Text

_ _ _ _ _ _ _ _ _ _ - _ _ - _ _ -

_ - - _ _ _ - - _ _ _ _

_ _ - _ _ _ _ _ _ _

.,

,,

\\

,

'

SEP 191988

Docket No. 50-302

License No. DPR-79

e

,

f:

,

Flcrida Pcwer Corporation

'

Mr. W. S. Wilgus

9

Vice President Nuclet- Operations.

ATTN: Manager, Nuclear Licensing

P. O. Box 219

Crystal River, FL 32629

Gentlemen:

<

SUBJECT: NOTICE OF VIOLATION

-

(NRC INSPECTION REPORT NO. 50-302/88-24)

This refers to the Nuclear Regulatory Comission (NRC) inspcation conducted by

P. Holmes-Ray on July 16 - August 12, 1988. ~Ihe inspection inc1"ded a review

of activities authorized for your Crystal River facility. At the conclusion of

the inspection, the findings were discussed wich those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

4

and representative records, interviews with personnel, and observation of

,

activities in progress.

l

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

The violations, references to pert 1nent requirements, and

,

elements to be included in your response.are described in the enclosed Notice

of Violation.

Your attention is invited to the unresolved items identified in the inspection

report.

These issues are potentially significant to the plant design bases in

a cumulative manner and warrant your attention.

They concern incoming

technical vendor information that may rot have been appropriately controlled

and evaluated in regard to their effect on the functionality of the applicable

,

!

components and systems (paragraphs 8 and 9).

These matters will be pursued

!

during future inspections,

i

In acdordance with ' . ction 2.790 of the NRC's "Rules of Practice," Part 2

Title 10 Code of Fe oral Regulations, a copy of this letter and its enclosures

'

will be placed in the NRC Public Document Room.

'

1

The responses direated by this latter and the enclosures are not subject to the

!.

clearance. procedum of the Office of Management and Budget as required by the

l

Paperwork Reduct' a act of 1980, Pub. L. No.96-511.

!

i

D

I

4

e

l

.EEc/

_-_ _ ____ ____

.

.

.

.

Florida Power Corporation

2

CEP 191933

Should you have any questions concerning this letter, please contact us.

Sincerely.

Original signed by

Luis ... Reyes, Director

,

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encis:

P. F. McKee, Director, Nuclear Plant

Operations

E. C. Simpson, Director, Nuclear

Site Support

State of Florida

bec w/encls:

NRC Resident inspector

DRS. Technical Assistant

Document Control Desk

I

Nj Sz

MLewis:ser

RCr!)enj ak

b h on

09/7 /88

09/j'p/88

09/pf/88

l

.

--

- - , - , . , - .

- -

-

-

- - - - - - - - - -

-

n

---_.-.. .

m-

,

,--.,--...-.,-----n-.


- --, -- - - ---,--

.