April 1, 1986 i

Docket Nos. 50-275, 50-323 Pacific Gas and Electric Company 77 Beale St.

San Francisco, CA 94106 Attention:

J. Shiffer Gentlemen:

We have completed a review of Revision 3, Change 5 to the Diablo Canyon Power Plant Emergency Plan submitted under your cover letter of December 24, 1985 (Ref: DCL-85-374).

Our review indicates that the Diablo Canyon Power Plant Emergency Plan, as changed, continues to meet the standards in 10 CFR 50.47(b) and the requirements of 10 CFR Part 50, Appendix E.

Sincerely, Raymond F. Fish, Chief Emergency Preparedness Section cc:

W. Fuijomoto, PG&E W. Keyworth, Diablo Canyon, PG&E S. Elkins, FEMA RIX bec: RSB/ Document Control Desk (RIDS)

State of CA Resident Inspector RV Brown:rc Fish 04/01/86 04/01/86 8604o9o063 e604 PDR ADOCK 3o00275 PDR

/

)