ML20155A522

From kanterella
Jump to navigation Jump to search
Rev 30 to Procedure T30-22, ECCS Valve Tests
ML20155A522
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 04/06/1988
From: Horon J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20155A519 List:
References
T30-22, NUDOCS 8806100108
Download: ML20155A522 (16)


Text

-...

. ~.. -......

1

,s ATTACIOiENT 4 Consumers Power Company Big-Rock Point Plant-Docket 50-155 PROCEDURE T30-22 June 2, 1988 89C6100108 880602 15 Pages PDF<

ADOCK 05000155 0

DCD OC0588-0028-NLO4 c

e m

,-w

+-

-n 4y

,,-.,---en----,',,,r--v

~ -, ~.

eeg-pvr

--r v ~

~~

l PROCEDURE APPROVAL AND AUTHORIZATION Procedure No.

T30-22 Rev No.

'30 Procedure Title EMERGENCY CORE COOLING SYSTEM VALVE TESTS CURRENT PIVISION STATUS Author JDHoron Date 04/06/88 Quality Review Form No. 1347-87 APPLICABILITY ISSUE HISTORY Revision No.

30 Date 04/06/88 Quality Review Form No. 1347-87 Approved for use Procedure Sponsor / Designate Date Authorized Period of Use through NOTE: Authorized period shall not exceed two years from date of last Review for Applicability.

When applicable:

PROCEDURE IMPLEMENTATION HISTORY Reviewed for System or Component Operability Performed by Completed / Reviewed by Method of Verification Title Title a Functional Test a Physical Inspection Date Time Date Time a Administrative Review MAINTENANCE ORDER NO. (if applicable)

T30-22-BA05

l l

Revision 30' Page 1 of 14 Init Date T30-22 EMERGENCY CORE COOLING SYSTEM VALVE TESTS 1.0 PURPOSE 1.1 Verify the operability of M0-7051,'MO-7061, M0-7066, M0-7070, M0-7071 and MO-7080 by remote manual operation.

1.2 Provide valve timing documentation per ASME Boiler and Pressure Vessel Code Section XI, IWV Testing.

1.3 Verify the deluge isolation valve, CV-4101 closes anytime a core spray valve opens and automatically reopens when all core spray valves are closed.

1.4 Verify that check valves VPI-303 and VPI-304 adequately seat, thereby preventing leakage from the high pressure coolant system into the low pressure core spray system.

2.0 PRECAUTIONS AND LIMITATIONS 2.1 When stroking motor-operated valves during this test, only one valve (of the valves being tested) may be open at a time.

2.2 During testing when MO-7051, MO-7061, M0-7070 and M0-7071 are opened, the substation deluge isolation valve CV-4101 will close to remove fire suppression capability for transformer sprays and the local trouble alarm will sound for FPS trouble.

2.3 If the fire main pressure increases to > 170 psig, as indicated on PI-338/PR-52, immediately close the core spray valve that was opened. A momentary pressure increase is normal, but a continued increase may indicate leakage of reactor coolant into the fire main.

4 I

T30-22-BA05

Rsvision 30 T30-22 Page 2 of 14 Init Date 2.4 The storm drain located northeast of the escape lock directs the discharge of the core spray heat exchanger-to the lake.

If the drain culvert becomes plugged, the discharge of the heat exchanger will flood out of the drain box into the yard.

Under'this condition, the capacity of the heat exchanger is not affected unless freezing conditions exist and the water in the drain box is allowed to freeze.

If the culvert becomes plugged initiate a Maintenance Order to clean it out.

If this condition occurs in freezing weather, steps shall be taken to prevent freezing and to remove the standing wate from the drain box.

3.0 PREREQUISITES 3.1 The fire water system shall be operable and CV-4101 open.

(SS) 3.2 During refueling with M0-7070 and MO-7071 tagged out, delete Steps 5.23 through 5.32.

Yes No (SS) 3.3 INSTRUMENT CALIBRATION DUE DATES PR-52 PI-338 PI-412 (SS) 3.4 Shift Supervisor's permission to perform test.

(SS) 3.5 Stopwatch used for timing valves:

Serial Number Calibration Due Date (0P)

T30-22-BA05

.m

Revision 30 T30-22 Page 3 of 14 Init Date 3.6 For the following motor-operated valves place the thermal-overload bypass keyed selector switch to the "inservice" position:

(/)

M0-7066 (HS-5418-1) Core Spray Pump Room M0-7070 (HS-B163-1) Behind 480V Load Ctr MO-7071 (HS-B152-1) Behind 480V Load Ctr MO-7080 (HS-3411-01) MCC 2B Breaker (OP) i

4.0 REFERENCES

AND ATTACHMEhTS 4.1 Big Rock Point Technical Specifications, Section 11.4.1.4u, Emergency Core Cooling System 4.2 Big Rock Point Technical Specifications, Sec.. ion 9.3, Inservice Inspection and Testing Specifications 4.3 Big Rock Point P&ID 0740G40123, Fire System 4.4 Big Rock Point P&ID 0740G44008, Post-Incident System Valve Lineup 4.5 Big Rock Point P&ID 0740G44019, Fire Protection System Valve Lineup 4.6 Big Rock Point Volume 3, SOP-8, Post-Incident System 4.7 Letter From NRC To DABixel Dated January 16, 1978 4.8 Letter From DABixel To NRC Dated February 1, 1979 l

4.9 Big Rock Point Technical Data Book 15.5.E.1, M0-7070 vs M0-7071 Opening Times 4.10 ASME B&PV Code Section XI, Rules For Inservice Inspection of Nuclear Power Plant Componenta 4.11 Big Rock Point Procedure TV-30, ASME Boiler and Pressure Vessel Code Section XI, IWV & IWP Testing Program l

T30-22-BA05

1 i

1 R9 vision 30 T30-22 Page 4 of 14 l

Init Date 4.12 EA-TV-30-02, Establishment Of Stroke Times For Valves In The ASME Section XI Valve Program 4.13 Letter From NRC Regarding SEP Topic V-11.A Dated August 12, 1982 4.14 Attachment 1, Independent Component Alignment Verification 5.0 PROCEDURE 5.1 Place the diesel fire pump control to the "Off" position.

(OP) 5.2 Station an observer at the storm drain, located at the discharge canal west bank during stroking of M0-7066 and M0-7080.

If the drain culvert cannot handle the flow, notify the Shift Supervisor (Refer to Step 2.4).

(0P) 5.3 NOTE:

Do not leave M0-7066 open any longer than absolutely necessary.

Stroke and time M0-7066 (RMC-5521).

M0-7066 Acceptance Acceptable Time Criteria Yes No Opening

< 29 see Closing

< 27 sec (0P) 5.4 After the electric fire pump starts, place the diesel fire pump control to the "Auto" position.

(OP)

T30-22-BA05

6 i

Revision 30 T30-22 Page 5 of 14 Init Date 5.5 NOTE: Do not leave MO-7080 open any longer than absolutely necessary.

Stroke and time M0-7080 (RMC-5591).

MO-7080 Acceptance Acceptable Time Criteria Yes No Opening

< 23 see Closing

< 17 sec (OP) 5.6 Record the initial pressure readings from, and standby, the diesel fire pump control panel to observe PI-338 and PR-52 during ECCS valve stroking.

PI-338 psig i

PR-52 psig (0P) 5.7 Close PT-186 instrument valve VIP-165, located in the inside cable penetration area.

(0P) 5.8 Block operation of M0-7061 by placing RMC-5501 in the "Pull-To-Stop" position.

(0P)

T30-22-BA05 l

~

Revision 30 T30-22 Page 6 of 14 Init Date

5.9 CAUTION

If fire main pressure increases to

> 170 psig during this step, immediately close M0-7051 and abort the test after returning the system to normal.

Stroke and time M0-7051 (RMC-5519) and verify operation of substation deluge valve, CV-4101.

M0-7051 Acceptance Acceptable CV-4101 Time Criteria Yes No Position Opening

< 27 see Closed Closing

< 26 see Opened (0P) 5.10 Core spray flow recorder "Red" light and chart drive "On."

(0P) 5.11 With M0-7051 closed verify that the leakage from the telltale between MO-7051 and M0-7061 has decayed to less than a steady stream, as observed from the hose at the sample sink in the recire pump instrument room.

(0P) 5.12 Return RMC-5501 for M0-7061 to its neutral position and check the following:

M0-7051 Closed CV-4101 Open (0P) 5.13 Block operation of MO-7051 by placing RMC-5519 in the "Pull-To-Stop" position.

(OP) i T30-22-BA05 l

Revision 30 T30-22 Page 7 of 14 Init Date 5.14 CAUTION:

If fire main pressure increases to

> 170 psig during this step, immediately close M0-7061 and abort the test after returning the system to normal.

Open and time M0-7061 (RMC-5501) and verify operation of substation deluge valve, CV-4101.

M0-7061 Opening Time seconds; Acceptance Criteria < 30 seconds.

CV-4101 Closed Results Acceptable: Yes No (0P) 5.15 While M0-7061 is open, verify that check valve VPI-304 is adequately seated by checking for flow through telltale between M0-7051 and M0-7061.

Adequately Seated: Yes No (0P) i 5.16 Close and time M0-7061 (RMC-5501) and verify operation of substation deluge valve CV-4101.

M0-7061 Closing Time seconds; Acceptance Criteria < 16 seconds CV-4101 Opened Results Acceptable: Yes No (0P) 5.17 Return RMC-5519 for M0-7051 to its neutral position and check the following:

M0-7061 Closed CV-4101 Opened (0P) 5.18 Remove the cap and attach a hose to the tee between VPI-185 and PT-186.

NOTE:

Use a bucket to contain the flow expected in the next step.

(OP)

T30-22-BA05

Revision 30

.T30-22 Page 8 of 14 Init Date i

5.19 CAUTION:

Flow through the hose may be rapid initially, but should subside to a few drops a second, or stop, after approximately one minute.

Slowly open PT-186 instrument valve VPI-165.

Flow acceptable after 1 minute, go to Step 5.20.

Flow substantial after 1 minute, close VPI-165 and notify the Control Room.

(0P) 5.20 Close FT-186 instrument valve VPI-165.

(0P) 5.21 Replace cap on tee located between PT-186 and its instrument valve VPI-165.

(OP) 5.22 Slowly open and then seal open VPI-165.

(0P) 5.23 Block operation of h0-7071 by placing RMC-5528 in the "Pull-To-Stop" position.

(0P) 4 4

4 T30-22-BA05

r----

Revision 30 T30-22 Page'9 of 14 Init Date 5.24 CAUTION:

If fire main pressure increases to

> 170 psig during this step, immediately close M0-7070 and abort the test after returning the system to normal.

Stroke and time M0-7070 (RMC-5527) and verify operation of uubstation deluge valve CV-4101.

NOTE: Opening times < 12 seconds may indicate i

failure of full valve stroke. The valve is to be visually observed during subsequent restroking.

M0-7070 Acceptance Acceptable CV-4101 Time Criteria Yes No Position Opening Step 5.32 N/A N/A Closed Closing

< 24 sec Opened Indicate whether M0-7070 was observed visually to verify full open travel and results:

___ N/A (OP) 5.25 Vith MO-7070 closed verify that leakage from the te21 tale between MO-7070 and M0-7071 has decayed to less than a steady stream of water as observed on the reactor Jack.

(OP) 5.26 Return RMC-5528 for MO-7071 to its neutral position and check the following:

MO-7070 Closed CV-4101 Open 5.27 Block operation of M0-7070 by placing RMC-5527 in the "Pull-To-Stop" position.

(OP)

T30-22-BA05

Revision 30 T30-22 Page 10 of 14 Init Date.

\\

5.28 CAUTION:

If fire main pressure increases to

>-170 psig during this step, immediately close M0-7071 and abort the test after-returning the system to normal.

Open and time M0-7071 (RMC-5528) and verify operation of substation deluge valve, CV-4101.

NOTE: Opening times < 12 seconds may indicate failure of full valve stroke. The valve is to be visually observed during subsequent restroking.

M0-7071 Opening Time seconds (Acceptance Criteria per Step 5.32)

CV-4101 Closed Indicate whether MO-7071 was observed visually to verify full open travel and results:

N/A (0P) 5.29 While M0-7071 is open, verify'that check valve VPI-303 is adequately seated by chec!;ing for flow through telltale located between MO-7070 and M0-7071.

Adequately Seated: Yes No (0P)

. 30 Close and time M0-7070 (RMC-5528) and verify operation of substation deluge valve CV-4101.

MO-7071 Closing Time seconds; Acceptance Criteria < 24 seconds C4'-4101 Opened _

Results Acceptable: Yes No (OP) 5.31 Return RMC-5527 for M0-7070 to its neutral position

)

and check the f ilowing:

j i

MO-7071 Closed CV-4101 Open (OP)

T30-22-BA05

~ Revision 30 T30-22 Page 11 of 14.

Init Date

.l'.

5.32 M0-7070 and MO-7071 have met the Acceptance Criteria as shown on Table 15.5.E.1 of the Big Rock Point Technice.1 Data Book, Volume 15.

Yes No N/A (0P) 5.33 Check VPI-9 locked open.

(0P) 5.34 Turn core spray flow recorder selector switch to the "Reset" position.

Red Light Extinguished Chart drive stopped. Return core spray flow recorder selector switch to "Auto" position.

(0P) 5.35 Record pressure reading from PI-412, core spray ring header pressure.

psig NOTE: A pressure > 170 psig may indicate leakage from the primary system through M0-7061.

(0P) 5.36 Stop the electric fire pump.

(0P) 5.37 Reset auto test clock on RDS Cabinet "SCA", and RDS auto test fault alarm if applicable.

(OP) 5.38 Ensure "FPS" deluge isolation valve CV-4101 is open.

(OP)

T30-22-BA05

Revision 30 T30-22 Page 12 of 14 Init

_Date 5.39 Return the thermal overload keyed selector switches to the "Bypassed" position for the following (Refer to Step 3.6):

M0-7066 l

M0-7080 M0-7070 M0-7071 (0P) 1 5.40 Have a second Operator independently check component alignment and complete Attachment 1.

(0P) 5.41 Test Completed By:

(0P)

Date (OP)

Date (OP)

__ Date 6.0 REVIEWS 6.1 List all corrective actions necessary to complete this procedure (ie, M0s, DRs, ERs, etc).

None (SS) 6.2 Test logged in TV-30.

(SS) 4:e T30-22-BA05

Revision 30 T30-22 Page 13 of 14 Init Date 6.3 Test reviewed by:

w (SS)

Date~

(OTA)

Date (OPS SUPV/ SUPT)

Date 6.4 Route completed procedure to ISI Coordinator for data trending and review for compliance with ASME B&PV Code IW-3413(C).

(ISI COORD)

Date ;

1 l

l l

I

(

)

1 1

1 6

T30-22-BA05

P, l

.s e ATTACHMENT 1 Revision 30 T30-22 INDEPENDENT COMPONENT ALIGNMENT VERIFICATION Page 14 of 14 Component Name Position Initial MO-7051 Primary Core Spray Closed MO-7061 Primary Core Spray Closed MO-7070 Back-Up Core Spray Closed MO-7071 Back-Up Core Spray Closed MO-7066 Core Spray Heat Exchanger Cooling Inlet Closed M0-7080 MO-7066 Bypass Closed RMC-5519 h0-7051 Handswitch Normal (Not Pulled)

RMC-5501 M0-7061 Handswitch Normal (Not Pulled)

RMC-5527 MO-7070 Handswitch Normal (Not Pulled)

RMC-5528 M0-7071 Handswitch Normal (Not Pulled)

RMC-5521 MO-7066 Handswitch No rmal (Not Pulled)

CV-4101 Substation Deluge Isolation Open FR-2108 Core Spray Flow Recorder Selector Switch Auto HS-5418-1 Thermal Overload For MO-7066 Bypassed HS-B163-1 Thermal Overload For MO-7070 Bypassed HB-B152-1 Thermal Overload For M0-7071 Bypassed HS-3411-01 Thermal Overload For M0-7080 Bypassed ICS Diesel Fuel Pump Control Switch Auto VPI-165 PT-186 Instrument Valve Sealed Open Test Tee PT-186 Sensing Line Vent Capped COMPLETED BY:

(OP)

Date (0P)

Date i

T30-22-BA05

_ _ _ _ _ - _ - _ - _ _ _ _._ _ - _ -