Text
..
Nh46
,
.
.
APR - 4 1986
.
!
.
Docket No. 50-456
,
Docket No. 50-457
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
. Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr.
W. J. Kropp of
this office on January 27, 1986 through March-29, 1985, of activities at the
Braidwood Station, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-132 and No. CPPR-133 and to.the discussion of our findings with
J
Mr. M. Wallace at the conclusion of the inspection.
t
'
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
i
examination of procedures and representative records, obse'rvations, and
l
interviews with personnel.
,
' No violations of NRC requirements were identified during the course of this
irspection.
- In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
-letter, the enclosures, and your response to this letter will be placed in the
'
HEC Public Document Room.
,
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
9604080162 860404
<
ADOCK 05000456
c
G
,
William S. Little, Director
Braidwood Project
Enclosure:
Inspection Reports
,
.No. 50-456/86006(DRP);
- No. 50-457/86005(DRF)
See Attached Distribution
-
4)
.
'
.
RIQ
RIII
VitY
l
bM
e ke/bls-
- br
Danielson
L
1
b.ar M
blrh
f d let
al')Ib
i b
4hh6
'
t\\
.
.
.
.
.
.
-
.
-
-
-- m.
.
.
- - -
-
- -
- -
- - - -
- - - -
- - - - -
- -
- -
- -
- - - - - -
- - - - - - - -
-
-
__
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - .
.
.
. Commonwealth Edison Company
2
APR - 4 m
Distribution
cc w/ enclosure:
cc w/ enclosure:
D. L. Farrar, Director
.of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Superinttndent
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J. Moore, ELD
G. Berry, ELD
J. Stevens, NRR
.The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
u_ .