ML20154S821

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/86-06 & 50-457/86-05 on 860127-0329.No Violation Noted
ML20154S821
Person / Time
Site: Braidwood  
Issue date: 04/04/1986
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20154S826 List:
References
NUDOCS 8604080162
Download: ML20154S821 (2)


See also: IR 05000456/1986006

Text

..

Nh46

,

.

.

APR - 4 1986

.

!

.

Docket No. 50-456

,

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

. Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr.

W. J. Kropp of

this office on January 27, 1986 through March-29, 1985, of activities at the

Braidwood Station, Units 1 and 2, authorized by NRC Construction Permits

No. CPPR-132 and No. CPPR-133 and to.the discussion of our findings with

J

Mr. M. Wallace at the conclusion of the inspection.

t

'

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

i

examination of procedures and representative records, obse'rvations, and

l

interviews with personnel.

,

' No violations of NRC requirements were identified during the course of this

irspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

-letter, the enclosures, and your response to this letter will be placed in the

'

HEC Public Document Room.

,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

9604080162 860404

<

PDR

ADOCK 05000456

c

G

PDR

,

William S. Little, Director

Braidwood Project

Enclosure:

Inspection Reports

,

.No. 50-456/86006(DRP);

No. 50-457/86005(DRF)

See Attached Distribution

-

4)

.

'

.

RIQ

RIII

VitY

l

bM

e ke/bls-

  1. br

Danielson

L

1

b.ar M

blrh

f d let

al')Ib

i b

4hh6

'

t\\

.

.

.

.

.

.

-

.

-

-

-- m.

.

.

- - -

-

- -

- -

- - - -

- - - -

- - - - -

- -

- -

- -

- - - - - -

- - - - - - - -

-

-

__

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - .

.

.

. Commonwealth Edison Company

2

APR - 4 m

Distribution

cc w/ enclosure:

cc w/ enclosure:

D. L. Farrar, Director

.of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superinttndent

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

.The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

u_ .