MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] |
Text
pf l
l
==
{]
Log # TXX-98223 File # 10010 l
916 7UELECTRIC Ref. # 10 CFR 50.90 10 CFR 50.36
- c. Imc. nny senior vice Praiden October 21,1998
& PrincipalNuclear Oficer U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 TECHNICAL SPECIFICATION CONVERSION APPLICATION ADDITIONAL INFORMATION FOR SECTION 3.7 REF: 1) TU Electric letter, logged TXX-97105, from C. L. Terry to the NRC dated May 15,1997
- 2) NRC letter from T. A. Polich to C. L. Terry dated August 14,1998, concerning !
section 3.7 Gentlemen:
TU Electric requested an amendment to the CPSES Unit 1 facility operating license (NPF-87) and Unit 2 facility operating license (NPF-89) by incorporating changes to the CPSES Units 1 and 2 Technical Specifications (TS) as provided in reference 1. The NRC staff requested additionalinformation regarding Section 3.7," Plant Systems," of the proposed TS changes in reference 2. The requested information is provided in the attachment to this letter as are any additional changes needed for Sections 3.7 as identified by TU Electric.
This letter and the attachment are not a supplement to reference 1. A supplement to reference 1 will be provided at a later date. Any deviations from the responses provided in this letter will be discussed in the supplement.
l The only commitment contained in this letter is to provide a supplement to reference 1 at a later date. l
\
\
\
9810270185 981021 oO PDR ADOCK 05000445 () ' \
P PDR COM4NCliE PEAK ST[ AM E1.ECTRIC STATION P.O. Box 1002 Glen Rose. Texas 76N3-1002 l
l
TXX-98223 l
Page ?. of 2 If you have any questions concerning the content of this letter, please contact Mr. Bob Dacko (254-897-0122).
Sincerely, i
C. L. Terry By:
D. R. Woodlan Docket Licensing Manager BSD/bd Attachment 1. Section 3.7, " Plant Systems" l
I c- E. W. Merschoff, Region IV J.1. Tapia, Region IV Resident inspectors, CPSES T. J. Polich, NRR J. N. Donohew, NRR l Mr. Arthur C. Tate Bureau of Radiation Control Texas Department of Public Health
, 1100 West 49th Street Austin, Texas 78704
l l
Attachment 1 to TXX-98223 Page 1 of 8 1
I l
1 l
JLS CONVERSION TO IMPROVED TECHNICAL SPECIFICATIONS .
l CTS 3/4.7 - PLANT SYSTEMS ITS 3.7 - PLANT SYSTEMS RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION AND LICENSEE INITIATED ADDITIONAL CHANGES e
l l
l l
i l
i m
l Attachment 1 to TXX-98223 Page 2 of 8 1
INDEX OF ADDITIONAL INFORMATION I ADDITIONAL INFORMATION APPLICABILITY ENCLOSED NUMBER 3.7.G-1 DC, CP, WC, CA YES 3.7.1-1 DC, CP, WC, CA YES 3.7.1-2 CP YES 3.7.1-3 DC NA 3.7.1-4 DC, CP, WC, CA YES 3.7.1-5 DC, CP, WC, CA YES 3.7.1-6 WC NA 3.7.1 -7 DC, CP, WC, CA YES 3.7.1-8 WC, CA NA 3.7.1-9 DC NA 3.7.1-10 DC NA 3.7.2-1 CP, WC, CA YES
- 3.7.2-2 WC, CA NA
.3.7.2-3 DC, CP, WC, CA YES ,
3.7.2-4 CP YES 3.7.3-1 DC NA 3.7.3-2 CP YES 3.7.3-3 DC, CP, WC, CA YES 3.7.3-4 WC, CA NA 3.7.3-5 DC NA 3.7.3-6 CP YES l 3.7.4-1 DC,CP YES 3.7.4-2 DC NA :
3.7.4-3 DC NA 3.7.4-4 WC, CA NA 3.7.4-5 CP, WC, CA YES 3.7.4-6 CP,CA YES 3.7.4-7 CP, WC, CA YES 3.7.4-8 CP YES 3.7.4-9 CP YES 3.7.5-1 CP YES 3.7.5-2 WC, CA NA 3.7.5-3 CA NA 3.7.5-4 WC, CA NA 3.7.5-5 CP YES 3.7.5-6 CP, WC, CA YES 3.7.5-7 CP, WC, CA YES
. 3.7.5-8 DC,CP YES 3.7.5-9 DC, CP, WC, CA YES 3.7.5-10 DC,CP YES 3.7.5-11 DC NA
i i
Attachment 1 to TXX-98223 Page 3 of 8 lNDEX OF ADDITIONAL INFORMATION (cont)
ADDITIONAL INFORMATION APPLICABILITY ENCLOSED NUMBER 3.7.5-12 DC NA' 3.7.6-1 WC NA 3.7.6-2 CP, WC, CA YES 3.7.6-3 CP YES 3.7.6-4 WC, CA NA 3.7.G-5 CP YES 3.7.6-6 CA NA 3.7.6-7 DC NA 3.7.7-1 WC, CA NA 3.7.7-2 DC, CP, WC, CA YES 3.7.7-3 WC, CA NA 3.7.7-4 CP YES 3.7.7-5 DC NA 3.7.7-6 DC NA .
^
3.7.8-1 CP YES 3.7.8-2 CP YES 3.7.8-3 CP YES 3.7.8-4 CP YES 3.7.8-5 CP YES 3.7.8-6 DC NA 3.7.8-7 DC NA 3.7.8-8 DC NA 3.7.8-9 DC NA e 3.7.8-10 DC NA 3.7.8-11 WC, CA NA 3.7.8-12 WC, CA NA 3.7.8-13 WC -
NA 3.7.8-14 WC, CA NA 3.7.8-15 WC, CA NA 3.7.8-16 CA NA 3.7.8-17 CA NA 3.7.9-1 DC NA 3.7.9-2 DC NA 3.7.9-3 CP YES 3.7.9-4 CP YES 3.7.9-5 WC NA 3.7.9-6 CA NA 3.7.9-7 CA NA 3.7.9-8 CA NA 3.7.10-1 DC NA 3.7.10-2 DC NA
i Attachment 1 to TXX-98223 Page 4 of 8 INDEX OF ADDITIONAL INFORMATION (cont)
ADDITIONAL INFORMATION APPLICABILITY ENCLOSED NUMBER 3.7.10-3 DC NA 3.7.10-4 DC, WC, CA NA 3.7.10-5 DC NA 3.7.10-6 DC NA 3.7.10-7 DC, WC, CA NA 3.7.10-8 DC, WC,, CA NA 3.7.10-9 DC, CP, WC, CA YES 3.7.10-10 DC NA 3.7.10-11 CP YES 3.7.10-12 DC NA 3.7.10-13 CA NA 3.7.10-14 CP, WC, CA YES 3.7.10-15 WC, CA NA 3.7.10-16 WC, CA NA .,
3.7.10-17 WC, CA NA 3.7.10-18 DC, WC, CA NA 3.7.10-19 CP, WC, CA YES 3.7.11-1 CP YES 3.7.12.1-1 CP YES 3.7.12.1-2 CP YES 3.7.12.1-3 CP YES 3.7.12.1-4 CP YES 3.7.12.1-5 CP YES 1 3.7.12.1-6 CP YES 3.7.13.1-1 DC NA 3.7.13.1-2 DC NA 3.7.13.1-3 DC NA 3.7.13.1-4 DC NA 3.7.13.1-5 DC NA 3.7.13.1-6 DC NA
- 3.7.13.1-7 DC NA 3.7.13.1-8 DC NA 3.7.13.2-1 WC, CA NA 3.7.13.2-2 WC, CA NA 3.7.13.2-3 WC, CA NA 3.7.13.2-4 WC, CA NA 3.7.13.2-5 CA NA 3.7.13.2-7 WC, CA NA 3.7.13.2-8 WC, CA NA
- 3.7.13.2-9 WC, CA NA 3.7.13.2-10 WC, CA NA
Attachment 1 to TXX-98223 Page 5 of 8 INDEX OF ADDITIONAL INFORMATION l (cont) l ADDITIONAL INFORMATION APPLICABILITY ENCLOSED NUMBER
\
3.7.15-1 DC, CP, WC, CA YES 3.7.15-2 WC, CA NA {
3.7.15-3 CP YES 3.7.16-1 DC NA 3.7.16-2 DC NA 3.7.16-3 CP, WC, CA YES i 3.7.17.1-1 WC, CA NA 3.7.17.1-2 CP, WC, CA YES 3.7.17.1-3 WC, CA NA 4 3.7.17.1-4 WC, CA NA 3.7.17.1-5 WC, CA NA 3.7.17.1-6 WC, CA NA l 3.7.17.1-7 CP YES 3.7.17.2-1 DC NA ,
3.7.17.2-2 DC NA 3.7.17.2-3 DC NA 3.7.i7.2-4 DC NA 3.7.17.2-5 DC NA 3.7.17.3-1 DC NA 3.7.17.3-2 DC NA 3.7.17.3-3 DC NA 3.7.17.3-4 DC NA 3.7.17.3-5 DC NA e 3.7.17.3-6 DC NA 3.7.18-1 CP YES 3.7.19-1 CP YES 3.7.19-2 CP YES 3.7.19-3 CP YES 3.7.19-4 CP YES 3.7.19-5 CP YES 3.7.20-1 CP YES 3.7.20-2 CP YES 3.7.20-3 CP YES 3.7.20-4 CP YES 3.7.20-5 CP YES 3.7.20-6 CP YES 3.7 R DOCS DC, CP, WC, CA YES TR 3.7-001 DC, CP, WC, CA YES TR 3.7-002 DC, CP, WC, CA YES TR 3.7-005 DC, CP, WC, CA YES
_ .-_ ~ - .-_._~ . - . _ _ . . _ . - . . . - - . . -.
Attachment 1 to TXX-98223 Page 6 of 8 INDEX OF ADDITIONAL INFORMATION (cont)
ADDITIONAL INFORMATION APPLICABILITY ENCLOSED NUMBER CA 3.7-ED CA NA CA 3.7-003 CA NA CA 3.7-004 CA NA CA 3.7-005 CA NA CA 3.7-008 CA NA CA 3.7-009 CA NA CP 3.7-ED CP YES CP 3.7-004 CP YES CP 3.7-005 CP YES CP 3.7-008 CP,WC YES CP 3.7-009 CP,WC YES CP 3.7-012 CP YES CP 3.7-013 CP YES .
^
CP 3.7-014 CP YES CP 3.7-015 CP YES DC 3.7-ED DC NA DC ALL-001 (3.7 changes only) DC NA DC ALL-002 (3.7 changes only) DC NA DC ALL-003 (3.7 changes only) DC NA DC 3.7-008 DC NA y DC 3.7-009 DC NA DC 3.7-0010 DC NA WC 3.7-001 WC NA WC 3.7-002 WC NA WC 3.7-003 WC NA WC 3.7-004 WC NA WC 3.7-005 WC NA WC 3.7-006 WC NA WC 3.7-007 WC NA
l l
Attachment 1 to TXX-98223 Page 7 of 8 JOINT LICENSING SUBCOMMilTEE METHODOLOGY FOR PROVIDING ADDITIONAL INFORMATION The following methodology is followed for submitting additionalinformation:
- 1. Each licensee is submitting a separate response for each section.
- 2. If an RAI does not apply to a licensee (i.e., does not actually impact the information that l defines the technical specification change for that licensee), "NA" has been entered in i the index column labeled " ENCLOSED" and no information is provided in the response for that licensee.
- 3. If a licensee initiated change does not apply,"NA" has been entered in the index column labeled " ENCLOSED" and no information is provided in the response for that licensee.
- 4. The common portions of the " Additional Information Cover Sheets" are identical, except for brackets, where applicable (using the same methodology used in enclosures 3A, 3B,4,6A and 6B of the conversion submittals). The list of attached pages will va,ry to match the licensee specific conversion submittals. A licensee's FLOG response may not address all applicable plants if there is insufficient similarity in the plant specific responses to justify their inclusion in each submittal. In those cases, the response will be prefaced with a heading such as " PLANT SPECIFIC DISCUSSION."
- 5. Changes are indicated using the redline / strikeout tcol of Wordperfect or by using a hand markup that indicates insertions and deletions, if the area being revised is not clear, the affected portion of the page is circled. The markup techniques vary as necessary, based on the specifics of the area being changed and the complexity of the changes, to e provide the clearest possible indication of the changes.
- 6. A marginal note (the Additional Information Number from the index) is added in the right margin of each page being changed, adjacent to the area being changed, to identify the source of each change.
- 7. Some changes are not applicab'e to one licensee but still require changes to the Tables provided in Enclosures 3A,38,4,6A, and 6B of the original license amendment request to reflect the changes being made by one or more of the other licensees. These changes are not included in the additiona' kJormation for the licensee to which the l change does not apply, a the chr.ges are only for consistency, do not technically l affect the request for that hansee, and are being provided in the additionalinformation l being provided by the licensees for which the change is applicable. The complete set of l changes for the license amendment request will be provided in a licensing amendment request supplement to be provided later.
Attachment 1 to TXX-98223 Page 8 of 8 l
JOINT LICENSING SUBCOMMITTEE METHODOLOGY FOR PROVIDING ADDITIONALINFORMATION (continued)
- 8. The item numbers are formatted as follows:
[ Source][lTS Section]-[nnn]
Source = Q - NRC Question CA- AmerenUE DC-PG&E WC - WCNOC CP - TU Electric TR - Traveler j ITS Section = The ITS section associated with the item (e.g.,3.3). If all sections are potentially impacted by a broad change or set of changes, "ALL" is used for the section number.
nnn = a three digit sequential number 1
l l
t l
l
ADDITIONAL INFORMATION COVER SHEET ADDITIONAL INFORMATION NO: O 3.7.G-1 APPLICABILITY: DC, CP, WC, CA REQUEST: ITS 3.7.X Bases General There have been a number of instances that the specific changes to the STS Bases are not properly identified with redline or strikeout marks.
Comment: Perform an audit of all STS Bases markups and identify instances where additions and/or deletions of Bases were not properly identified in the original submittal. I FLOG RESPONSE: The submitted ITS Bases markups for Section 2.0 have been compared to the STS Bases. Some differences that were identified were in accordance with the markup methodologies (e.g., deletion of brackets and reviewer's notes). Most of the differences were editorialin nature and would not have affected the review. Examples of editorial changes are:
- 1) Capitalizing a letter with only a " redline" but not striking out the lower case letter that it replacc'
- 2) Chanyng a verb from singular to plural by adding an "s" without " redlining" the "s".
- 3) Deleting instead of striking-out the A, B, C,.. etc. following a specification title (e.g., '
SR3.6.6A.7). .
- 4) Changing a bracketed reference (in the reference section) with only a " redline" for^the new reference but failing to include the strike-out of the old reference.
- 5) In some instances the brackets were retained (and struck-out) but the unchanged text within the brackets was not redlined.
- 6) Not redlining a title of a bracketed section. The methodology calls for the section title to be redlined when an entire section was bracketed.
- 7) Additional text not contained in the STS Bases was added to the ITS Bases by the lead FLOG member during the development of the submittal. Once it was determined to not be applicable, the text was then struck-out and remains in the ITS Bases mark-up. e Differences of the above editorial nature will not be provided as attachments to this response.
The pages requiring changes that are more than editorial and are not consistent with the markup methodology are attached.
ATTACHED PAGES:
Enci 58 B 3.7 Failed to redlined STS bracketed items (5 locations)
B 3.7 Failed to redlined STS bracketed item B 3.7 Failed to redlined STS bracketed item B 3.7 Failed to redlined STS bracketed frequency and Note 1. Also added and B 3.7 33a back Note 2 (struckout) which was inadvertently replaced with a duplicate struckout Note 1.
B 3.7 Added back deleted text that should have been struckout instead of being deleted.
B 3.7 Failed to redlined STS bracketed item and added back deleted text that should have been struckout instead of being deleted.
. _ . ._ _.. _ . __ . _ _ _ . . . . - - - . _ . . _ _ . _ _ . . . _ _ . - _ . . . . ~ . . _ _ _ . . . . _ . . . . _ . . . -
B 3.7 Failed to redlined STS bracketed item B 3.7 Failed to redlined STS bracketed text B 3.7 Failed to redlined STS bracketed text (3 locations)
B 3.7 Added back deleted text that should have been struckout instead of being deleted.
B 3.7 Failed to redlined STS bracketed text B 3.7 Failed to redlined STS bracketed text 4
. B 3.7 Failed to redlined STS bracketed references (2 locations) - )
B 3.7 Failed to redlined STS bracketed text 1 I
- B 3.7 Failed to redlined STS bracketed text i B 3.7 Failed to redlined STS bracketed text {