ML20154R488

From kanterella
Jump to navigation Jump to search
Forwards TR-119, Oyster Creek Core Spray Sys Insp Program - 17R, Per TS Section 6.9.3.d & Paragraph 2.C.(5) of Plant Operating License.Nrc Approval Is Requested to Be Docketed by 981030,in Order to Support Scheduled 981102 Restart Date
ML20154R488
Person / Time
Site: Oyster Creek
Issue date: 10/22/1998
From: Roche M
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20154R491 List:
References
1940-98-20624, NUDOCS 9810270047
Download: ML20154R488 (1)


Text

_ _ _ - _ _ _ _ _ - _ _ _ - - _ _ _ _ _ _ - _ _ _ _ _

)

j GPU Nuclear, Inc.

(

U.S. Route #9 South NUCLEAR Post Office Box 388 Forked River, NJ 08731-0388 Tel 609-9714000 October 22,1998 1940-98-2 % 24 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Core Spray Sparger - 17R Inspections The Oyster Creek Nuclear Generating Station Operating License paragraph 2.C.(5), and Technical Specification Section 6.9.3.d, require that a special report presenting the results of the In-Service Inspection of the core spray spargers be submitted to the USNRC prior to restart from a refueling outage. Commission approval is required for restart.

Enclosed with this letter is Topical Report TR-119, which provides the information referenced above. In order to support a scheduled restart date of November 2,1998, NRC approval is requested to be docketed by October 30,1998.

If any additional information or assistance is required, please contact Mr. John Rogers of my staff at 609.971.4893.

Very truly yours, 1%sJ/6OfLc_.

Michael B. Roche Vice President and Director l

Oyster Creek q'

MBR/JJR J

i Enclosure OOJ cc:

Administrator, Region I

)

NRC Project Manager Senior Resident Inspector 9810270047 991022" PDR ADOCK 05000219 G

PDR r