Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J2431999-06-29029 June 1999 Informs That Author Received Call from NRR on Dirt Spreading Ltr & Questions Re Cover Ltr Statement Where Util Asks to Be Allowed to Dispose of Future Soil in Same Manner Provided Same Acceptance Criteria Met ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195C5891999-05-27027 May 1999 Forwards Response to NRC 990301 RAI Re GL 96-05 Program at Vermont Yankee Nuclear Power Station ML20195D5341999-05-27027 May 1999 Forwards Description of Vermont Yankees Plans for Insp of & Mods to Certain Reactor Vessel Internals BVY-99-074, Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld1999-05-26026 May 1999 Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld ML20195B4081999-05-24024 May 1999 Withdraws Licensee Commitment,Contained in ,To Reinitiate ITS Project Following Completion of FSAR Accuracy Verification Project.Util Will Continue to Modify Current TS with Number of Improvements BVY-99-067, Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License1999-05-21021 May 1999 Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License ML20196L1801999-05-18018 May 1999 Withdraws Licensee & Attachment,Containing Rev 2 to Vermont Yankee Operational QA Manual, from Further Consideration by Nrc.Summary of Commitments Encl ML20206K3201999-05-0707 May 1999 Forwards Response to RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206D3731999-04-27027 April 1999 Informs NRC of Changes in Recipients of NRC Docketed Correspondence ML20206B1401999-04-23023 April 1999 Forwards Replacement of Section 3(a) of NSHC Determination Provided by Re TS Proposed Change 208,suppl Section 6 ML20205S3381999-04-16016 April 1999 Submits Revised Schedule for Response to NRC 990226 RAI Re 980630 Submittal of IPEEE Rept.Info Will Be Submitted by 991231 ML20205S3891999-04-16016 April 1999 Forwards non-proprietary & Proprietary Revised Page to Holtec Rept HI-981932,supplementing TS Proposed Changed 207 Re Spent Fuel Pool Storage Capacity Expansion ML20205S3031999-04-15015 April 1999 Forwards Revised TS Bases Pages 90,227,164 & 221a,accounting for Change in Reload Analysis from Yaec to GE Methodology, Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20205P9291999-04-14014 April 1999 Requests That Rev to NRC 821029 SER for NUREG-0737,Item II.K.3.24,be Issued to Clarify Util Installed RCIC & HPCI HVAC Configuration,As Discovered During Preparation of DBDs for Sys ML20205P8191999-04-13013 April 1999 Forwards Rev 2 to COLR for Vermont Yankee Cycle 20, Dtd Feb 1999,IAW TS Section 6.7.A.4 ML20205M3191999-04-0707 April 1999 Forwards 1998 Annual Rept of Results of Individual Monitoring, Per 10CFR20.2206(b).Licensee Is Submitting Matl to Only Addressee Specified in 10CFR20.2206(c).Without Encl ML20205K0351999-03-31031 March 1999 Informs That Certain Addl Corrections Warranted for 990121 SER for Amend 163 to License DPR-28 Re Suppression Pool Water Temp.Suggested Corrections Listed ML20205K1821999-03-31031 March 1999 Informs of Modifications That Util Made to CO(2) Fire Suppression Sys,Due to Sen 188 Which Occurred at Ineel on 980728.Compensatory Actions Will Remain in Place Until Modifications Are Complete & Systems Are Returned to Svc ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee 1999-09-29
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059J2831990-09-10010 September 1990 Forwards Updated Operator Licensing Exam Schedule for FY91, FY92,FY93 & FY94,per Generic Ltrs 90-07 & 89-12 ML20059D9831990-08-28028 August 1990 Forwards fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71.NRC Review of Data Will Provide Realization That Positive Testing Rate Extremely Low & Limited to pre-access Testing Population BVY-90-087, Forwards Addl Info on Use of RELAP5YA Program for LOCA Analyses.Proprietary Encl Withheld1990-08-28028 August 1990 Forwards Addl Info on Use of RELAP5YA Program for LOCA Analyses.Proprietary Encl Withheld BVY-90-086, Responds to NRC Re Violations Noted in Insp Rept 50-271/90-06.Corrective Actions:Incident Rept Initiated & All Required Locking Devices in Place by 9007061990-08-24024 August 1990 Responds to NRC Re Violations Noted in Insp Rept 50-271/90-06.Corrective Actions:Incident Rept Initiated & All Required Locking Devices in Place by 900706 ML20059F6681990-08-22022 August 1990 Comments on Review of Amend 115 to License DPR-28,including Safety Evaluation.Requests Explanation of Statement in NRC Re How NRC Considers Comments & What Resolution Could Be for Each Util Comment in BVY-90-085, Informs That Sys Testing & Operator Training Successfully Completed & SPDS Declared Operable on 900813.Util Intends to Operate SPDS in Parallel W/Original Honeywell Gepac Plant Computer Until mid-Nov 19901990-08-15015 August 1990 Informs That Sys Testing & Operator Training Successfully Completed & SPDS Declared Operable on 900813.Util Intends to Operate SPDS in Parallel W/Original Honeywell Gepac Plant Computer Until mid-Nov 1990 BVY-90-084, Notifies NRC of Intentions to Install Test Fuel Assemblies & Test Control Blades During Cycle 15 Refueling Outage in Sept 19901990-07-24024 July 1990 Notifies NRC of Intentions to Install Test Fuel Assemblies & Test Control Blades During Cycle 15 Refueling Outage in Sept 1990 BVY-90-082, Informs That Effective 900723 Facility Implemented Rev 4 of Procedure Generating Package & Corresponding Revs to Eops. Revs Developed Per Rev 4 of BWR Owners Group Emergency Procedure Guidelines1990-07-24024 July 1990 Informs That Effective 900723 Facility Implemented Rev 4 of Procedure Generating Package & Corresponding Revs to Eops. Revs Developed Per Rev 4 of BWR Owners Group Emergency Procedure Guidelines BVY-90-071, Forwards Rev 2 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)1990-07-20020 July 1990 Forwards Rev 2 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) BVY-90-078, Forwards List of Refs for Proposed Change 161 to Facility OL & Tech Specs1990-07-17017 July 1990 Forwards List of Refs for Proposed Change 161 to Facility OL & Tech Specs BVY-90-072, Forwards Supplemental Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters 1989,Including Annual Radiological Impact on Man for 19891990-06-27027 June 1990 Forwards Supplemental Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters 1989,Including Annual Radiological Impact on Man for 1989 ML20043G4351990-06-15015 June 1990 Requests Temporary Waiver of Compliance from Tech Spec Requirements for Limiting Conditions for Operation for Certain post-accident Monitoring Instrumentation Listed in Tech Spec Table 3.2.6.Parameters Listed ML20043E4011990-06-0808 June 1990 Responds to Second Request for Addl Info on Use of RELAP5YA. Explanation Re Why More Accurate View Factor Calculation Not Included in Huxy Code Addressed ML20043C6131990-06-0101 June 1990 Forwards YAEC-1659-A, Simulate-3 Validation & Verification. ML20043C5991990-06-0101 June 1990 Forwards Accepted Version of YAEC-1683-A, MICBURN-3/ CASMO-3/TABLES-3/SIMULATE-3 Benchmarking of Vermont Yankee Cycles 9 Through 13. ML20043C4821990-05-30030 May 1990 Informs of Three Organizational Changes That Will Become Effective on 900601.WP Murphy,Jp Pelletier & DA Reid Will Be Senior Vice President of Operations,Newly Created Vice President of Engineering & Plant Manager,Respectively ML20043B7561990-05-23023 May 1990 Informs That Util Intends to Utilize Relationship Between Frosstey & FROSSTEY-2 to Support Cycle 15 Calculations.Nrc Approval of FROSSTEY-2 Needed by Aug 1990 for LOCA Analysis Program ML20043B6481990-05-17017 May 1990 Forwards Rev 19 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) BVY-90-058, Forwards Public Version of Vermont Yankee Nuclear Power Station Emergency Response Preparedness Exercise 1990. Exercise Scenario Package Includes All Info Pertinent to Performance of Exercise Scheduled for 9007181990-05-17017 May 1990 Forwards Public Version of Vermont Yankee Nuclear Power Station Emergency Response Preparedness Exercise 1990. Exercise Scenario Package Includes All Info Pertinent to Performance of Exercise Scheduled for 900718 ML20042G9061990-05-10010 May 1990 Forwards Proprietary Supplemental Info to 900419 Response to NRC 900309 Ltr Re FROSSTEY-2 Fuel Performance Code.Info Withheld ML20042F6471990-05-0404 May 1990 Ack That NRC Will Issue Supplementary Info to NRC 900307 Request for Installation of Neutron Flux Monitoring Instrumentation That Conforms to Requirements of Reg Guide 1.97 & 10CFR50.49 at Plant ML20042E7291990-04-23023 April 1990 Forwards Pages Omitted from 900314 Revs 16-18 to Physical Security Plan.Revs Withheld ML20012F3511990-03-30030 March 1990 Provides Supplemental Response to Station Blackout Rule (10CFR50.63).Util Will Use Alternate Ac Power Source Available within 10 Minutes of Onset of Station Blackout to Meet Requirements of Station Blackout Rule ML20012D0301990-03-19019 March 1990 Forwards Response to Generic Ltr 89-19 Re Resolution of USI A-47.Feedwater Sys Trip Relays,Interfacing W/Feedwater Pump Control Circuitry,Powered from Supplies Originating from safety-related Dc Sources ML20012D0241990-03-16016 March 1990 Forwards Supplemental Info Re Feedwater Check Valve V28B Flaws Evaluation,Per NRC Request.Util Remains Committed to Replacement of Subj Valve During Upcoming 1990 Refueling Outage ML20012C6381990-03-15015 March 1990 Forwards Vermont Yankee Nuclear Power Corp Financial Statements 891231,1988 & 1987. ML20012C6071990-03-15015 March 1990 Forwards Method for Generation of One-Dimensional Kinetics Data for RETRAN-02, Per NUREG-0393 & 891211 Request ML20012B8311990-03-0909 March 1990 Forwards Proprietary Vermont Yankee Evaluation Model Sample Problem 0.7 Ft(2) Break in Recirculation Discharge Loop, in Response to 900208 Telcon.Rept Withheld (Ref 10CFR2.790) ML20012B6131990-03-0909 March 1990 Informs of Schedular Changes Made W/Regard to Plant Licensed Operator Requalification Training Program ML20006E8871990-02-15015 February 1990 Provides NRC W/Results of Licensee Review of Design Bases & Operability Status of torus-to-reactor Bldg Vacuum Breakers ML20011E6791990-02-0505 February 1990 Responds to Weaknesses Noted in SALP Rept 50-271/88-99 for Jul 1988 to Sept 1989.Implementation of Emergency Response Facility Info Sys Nearing Completion & Remaining Safety Class Vendor Manuals Will Be Completed During 1990 ML20006D1571990-02-0202 February 1990 Responds to 891226 Request for Addl Info Re YAEC-1683 on MICBURN-3/CASMO-3/TABLES-3/SIMULATE-3 Benchmarking.Hot Eigenvalue Std Deviation on Table 5.7 of YAEC-1683 Reduced to 0.00098 w/SIMULATE-3 ML20006B1351990-01-22022 January 1990 Forwards Responses to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment.Establishment of Program Revs Prior to Startup from Next Refueling Outage, Scheduled for Fall 1990,planned ML20006A4441990-01-16016 January 1990 Forwards Revised Page 127 of Tech Specs to Clarify Proposed Change 134, Rev of Pressure Suppression - Reactor Bldg Vacuum Breaker Sys Operability Requirements. Change Involves Adoption of Language Consistent W/Bwr STS ML19354E8001990-01-16016 January 1990 Forwards Addl Info Re Testing of Cable Vault C02 Suppression Sys During 891031-1102,per NRC 890518 & 0821 Requests.Encl Final Test Rept Demonstrates That Carbon Dioxide Sys Will Satisfy Design Bases for Greater than 10 Minutes in Room ML20005G0841990-01-10010 January 1990 Responds to NRC Bulletin 89-002 Re Stress Corrosion Cracking of high-hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design ML20005E8201990-01-0202 January 1990 Forwards Minutes of NRC 890907 Meeting W/Util in Rockville,Md Re Util LOCA Analysis Program.List of Attendees Also Encl ML20005F0551990-01-0202 January 1990 Informs That Util Has Implemented Fitness for Duty Program, in Compliance w/10CFR26 ML20005E3531989-12-28028 December 1989 Forwards Response to Generic Ltr 89-10 Re safety-related motor-operated Valve Testing & Surveillance.Util Intends to Extend Existing IE Bulletin 85-003 Program to Cover motor- Operated Valves within Scope of Ltr ML20005E3191989-12-28028 December 1989 Responds to Violations Noted in Insp Rept 50-271/89-17 on 890906-1016.Corrective Actions:Plant Procedures Revised & Addl Meetings Between Plant Manager,Dept Supervisors & Personnel to Take Place ML19332G1791989-12-12012 December 1989 Forwards Rev 0 to Vermont Yankee Nuclear Power Station Cycle 14 Core Operating Limits Rept. ML19332F2781989-11-30030 November 1989 Forwards Rev 1 to YAEC-1693, Application of One-Dimensional Kenetics to BWR Transient Analysis Methods, Per 891106 Ltr.Rept Presents Methodology,Verification & Justification for Application of RETRAN-02 One Dimensional Option ML19332E3511989-11-29029 November 1989 Forwards Annual Cashflow Statements for 1989 as Evidence of Util Maint of Approved Guarantee,Per Requirements of 10CFR140.21 Re Licensee Guarantees of Payment of Deferred Premiums ML19332E5281989-11-28028 November 1989 Requests Removal of Change B to Proposed Change 148 Re Rev to Pages 5b & 6a Correcting Administrative Error in Tech Spec 2.1 ML19332D3801989-11-22022 November 1989 Responds to NRC Generic Ltr 89-21 Re Request for Info Re Status of Implementation of USI Requirements.Encl Table Details Implementation Status for USIs for Which Final Technical Resolution Achieved ML19324C1501989-11-10010 November 1989 Responds to NRC Bulletin 88-010,Suppl 1 Re Molded Case Circuit Breakers.Program Initiated to Ensure That Breakers Can Perform Safety Functions ML19324C2201989-11-0606 November 1989 Requests Change in Review & Approval Basis from Facility Specific to Generic Because Methods Described in YAEC-1693 & YAEC-1694 Applicable to All BWRs ML19325F0261989-11-0606 November 1989 Responds to Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Util Has Evaluated Listed Considerations,Including Safe Standoff Distances for Vital Equipment ML19324B7431989-10-30030 October 1989 Responds to Generic Ltr 89-16 Re Installation of Hardened Wetwell Vent.Util Expects to Establish Specific Design Criteria to Install Enhanced Containment Overpressure Protection Capability by End of 1992 Refueling Outage ML19324B8481989-10-30030 October 1989 Provides NRC W/Test Acceptance Criteria for Alternate Test of CO2 Suppression Sys,Per 891025 Meeting.Ability to Contain CO2 at Appropriate Concentration for Required Duration,As Well as Ability to Withstand Dynamics of Discharge,Verified 1990-09-10
[Table view] |
Text
- .
VERMONT YANKEE NUCLEAR POWER CORPORATION FVY 88-84
.. AD 5, Box 169, Ferry Road, Brattleboro, VT 05301 ,,
y ENGINEERING OFFICE 1671 WORCESTER ROAD
- FR AMING HAM. M ASSACHUSETTS 01701
- Ttt tPMoNt eir 472-8100 September 29, 1988 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn Document Control Desk
References:
a) License No. OPR-28 (Docket No. 50-271) b) Letter, USNRC to All Holders of Operating Licenses for Nuclear Power Reactors, NVY 88-125, NRC Bulletin No.
88-08, dated 6/22/88 c) Letter, USNRC to All Holders of Operating Licenses for Nuclear Power Reactors, NVY 88-126, NRC Bulletin No.
88-08, Supplement 1, dated 6/24/88 d) Letter, USNRC to All Holders of Operating Licenses for Nuclear Power Reactors, NVY 88-158, NRC Bulletin No.
88-08, Supplement 2, dated 8/4/88
Dear Sir:
Subject:
Vermont Yankee Response to NRC Bulletin No. 88-08: Thermal Stresses in Piping Connected to Reactor-Coolant Systems By letter dated June 22, 1988 (Reference b)), the NRC's Office of Nuclear Reactor Regulation requested that licensees: 1) review their Reactor Coolant System (RCS) to identify any connected, unisolable piping that could be sub-jected to temperature distribution which would result in unacceptable thermal stresses: and 2) take action where such piping is identified to ensure that the piping will not be subjected to unacceptable thermal stresses.
In accordance with the subject Bulletin, as supplemented by letters dated June 24, 1988 and August 4, 1988 (References c) and d)), the following infor-mation is provided.
BACKGROUNO NRC Information Notice No. 88-01, "Safety Injection Pipe Failure," iden-tified an unisolable leak on Emergency Core Cooling System (ECCS) piping at an operating Pressurized Water Reactor (PWR). The NRC subsequently issued NRC Bulletin 88-08, "Thermal Stresses in Piping Connected to Reactor Coolant Systems (RCS)", which addressed the possible cause of the leakage at the affected plant, and identified required actions and documentation from all light water-cooled power reactore.
1 NOCK ,
I l s VERMONT YANKEE NUCLEAR POWER CORPORATION U.S. Nuclear Regulatory Commission September 29, 1988 Page 2 NRC Bulletin No. 88-08 required all operating plants to 1) review systems connected to the RCS to determine whether unisolable sections of piping could be subjected to stresses from temperature stratification or temperature ost i'lations induced by valve leakage, and were not evaluated in the design analysis of the piping: and 2) take action where such piping is identified to ensure that tue piping will not be subjected to unacceptable thermal stresses. This letter documents the results of the required review for Vermont Yankee.
DISCUSSION ,
The leak identified in Bulletin No. 88-08 is believed to have been caused by thermal fatigue of unisolable piping connected to the RCS. The fatigue possibly occurred because the piping was isolated from the RCS by a leaking block valve. The pressure upstream from the block valve was higher than RCS pressure, and the temperature upstream was significantly cooler than RCS temperature.
These adverse conditions of temperature stratification and fluctuations is believed to have resulted in crack initiation and leakage at an operating PWR.
To evaluate the effect of Bulletin No. 88-08 as it applies to Vermont Yankee, a review was conducted to identify all applicable systems connected to the RCS. Criteria used in this evaluation were:
o pressure available to allow loakage across valve to RCS: and o temperature differential between two systems.
Also considered in the evaluation was the fact that the affected plants identified in NRC Bulletin No. 88-08 all used dual purpose charging pumps, which are used for charging the RCS with coolant during normal operation, and injecting emergency coolant at high pressure following an accident. This con-dition is consistent with PHR operation and is not prevalent in BWR plants.
However, as stated in the Bulletin, valve leakage could occur in any power reac-tor and susceptibility to this condition should be determined.
During normal operation, the following systems at Vermont Yankee can inject to the RCS and could have the required temperature and pressure differentials of concern identified in Bulletin No. 88-08:
System Line Number _
]
Reactor Water Clean-up 4"-CUW-55 Control Rod Drive 2-%"-CRD-9 High Pressure Coolant Injection 14"-HPCI-15B Reactor Core Isolation Cooling 4"-RCIC-8B Standby Liquid Control 1-1%"-SLC-11 Feedwater 16"-FDW-15 The following is a discussion of each of these systems: !
e VERMONT YANKEE NUCLEAR POWER CORPORATION U.S. Nuclear Regulatory Commission l September 29, 1988 Page 3 o Reactor Water Clean-Up The Reactor Water Clean-Up (RWCU) System normally operates at a pressure ,
I equal to or higher than reactor pressure, and at a slightly lower tem- '
perature. However, this system is in continuous operation and its return water enters the RCS through the Feedwater System via a thermal sleeve.
This thermal sleeve has been designed to accommodate, without excessive stresses, the maximum temperature differential that could occur between the -
two fluid streams under any mode of plant operation. Therefore, this system is not subjected to the unanalyzed stresses of concern identified in Bulletin No. 88-08, o Control Rod Drive The Control Rod Drive (CRD) System operates at high pressure and also at somewhat lower temperatures than the reactor. However, this system is nor-mally operating and injects into the RCS through the RWCU System and the i thermal sleeve identified above and the CRD mechanisms at the bottom of the vessel. Therefore, because this system has been designed to inject cool 4
water into the reactor, the CR0 Svetem is not subjected to the unanalyzed stresses of concern identified in the subject Bulletin. i o Hiah Pressure Coolant Infection I The High Pressure Coolant Injection (HPCI) is a high pressure system which can be connected to the RCS through feedwater piping at Vermont Yankee. !
However, during normal operation, feedwater pump discharge pressure is maintained up to a testable valve in this system, while upstream of this valve is kept filled the pressure is insufficient to overcome RCS pressure
- and inject water into the RCS. Additionally, although these systems are 1
tested monthly, any leakage during testing would inject into the Feedwater System upstream of two check valves and one manually operated valve, causing considerable mixing prior to reaching any portion of the feedwater lines which would not be isolable from the RCS. Therefore, the HPCI System is not subjected to the stresses of concern identified in the subject Bulletin.
o Reactor Core Isolation Coolina 3 The Reactor Core Isolation Cooling (RCIC) System is a high pressure system !
3 which is connecteo to the RCS through feedwater piping similar to HPCI. As 1
i in the case of HPCI, any leakage from the RCIC System would inject into an operating Feedwater System thereby causing considerable fluid mixing prior to reaching any unisolable sections of feedwster lines. Therefore, the RCIC System is not subjected to the stresses of concern identified in the subject Bulletin.
! [
I
VERMONT YANKEE NUCLEAR POWER CORPORATION
~
U.S. Nuclear Regulatory Commission September 29, 1988 Page 4 o Standby Liquid Control The Standby Liquid Control (SLC) System is connected to the RCS directly through a 1-14 inch line which is isolated during normal operation by explosive squib valves. Upstream of these valves is depressurized during normal operation and would be pressurized only during monthly pump discharge testing. However, leakage through these "zero leakage" valves during testing is an unlikely event since these valves are designed such that no leakage will occur. Therefore, this system is not subjected to the stresses of concern identified in the subject Bulletin.
o Feedwater Feedwater Line 16"-FDW-15 injects into the RCS directly through the con-tinuation of the Feedwater System. This system is designed to continuously inject make-up water into the RCS and is isolated from the RCS by dual con-tainment isolation valves: therefore, this part of the Feedwater System is not subjected to the stresses of concern identified in the subject Bulletin.
SUMMARY
The above systems were evaluated for normal operation and hot standby con-ditions when reactor pressure is high. Vermont Yankee also evaluated low pressure systems to ensure that unanalyzed temperature gradients which could result in unacceptable thermal stresses are not possible during cold shutdown.
The two systems evaluated were 1) Core Spray; and 2) Low Pressure Coolant Injection, o Core Spray !
The Core Spray (CS) System is a low pressure system and would only be in I operation during testing. Leakage past the CS injection valve could only occur when reactor pressure is lower than the CS pump discharge line pressure. This could occur only during cooldown and shutdown of the reac-tor when the pressurizing line keeps the pump discharge piping pressurized to approximately 75 to 85 psig. However, the temperature differentials at the time are much smaller than identified in the Bulletin. Additionally, these injection valves, MOV-14-12A and MOV-14-128, are currently included in Type C leak-rate testing during each reactor shutdown for refueling. !
An evaluation has been conducted to analyze the effect of leakage of "cool" water through the CS Injection Valves MOV-14-12A and MOV-14-12B, during cold shutdown on the CS piping downstream of the Check Valve V12-13A/8.
This evaluation has determined that no unacceptable thermal stresses occur durng cold shutdown.
o Low Pressure Coolant injection The Low Pressure Coolant Injection (LPCI) System is a subsystem of the i Residual Heat Removal System at Vermont Yankee. Leakage past the LPCI !
l
a .~
VERMONT YANKEE NUCLEAR POWER CORPORATION U.S. Nuclear Regulatory Commission September 29, 1988 Page 5 injection valves could only occur when reactor pressure is lower than the RHR pump discharge line pressure. This could occur during cooldown and shutdown conditions duo to pressurizing the pump discharge piping as in the CS System. During this condition, the temperature differentials are much smaller than those of concern in the Bulletin.
As for the CS System, an evaluation was completed to analyze the effect of the LPCI Injection Valves MOV-10-27A and MOV-10-27B, leaking "cool" water through the Check Valve V10-46A/B. The evaluation showed no unacceptable thermal stresses occur during cold shutdown. '
CONCLUSION l In accordance with NRC Bulletin No. 88-08, Vermont Yankee has reviewed the Reactor Coolant Systems at Vermont Yankee to identify any connected, unisolable piping that could be subjected to temperature distribution that would result in unacceptable thermal stresses. As a result of this review, Vermont Yankee has determined that during normal operation, hot standby and cold shutdown con-ditions there are no unisolable sections of piping connected to the RCS which could be subjected to stresses from temperature stratification or temperature oscillations induced by valve leakage, and which were not evaluated in the design analysis of the piping.
We trust that the information provided is responsive to the subject Bulletin however, should you have any questions or require additional information, please contact us.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION kss---
Warren P.
kmf urphy y '
Vice Pres dent and
/dm Manager of Operations cci USNRC Regional Administrator, Region I USNRC Resident Inspector, VYNPS l
4 STATE OF VERMONT)
)ss l WINDHAM COUNTY )
Then per {
eared before me, Warren P. Murphy, who, being duly sworn, did Yankee N 1 haf $ Vice President and Manager of Operations of Vermont r Power Corpor tion, that he is duly authorized to execute and file the for going d {
t in th name and on the behalf of Vermont Yankee Nuclear '
Power rpora hat th statemen erein are true to the best of his
' ** '"*Q r
g g n Y' L Diane M. McCue [ Notary Public My Commission Expires February 10, 1991 1
1 COU Nd'
, - . _. - _ _ . .