ML20154Q599
| ML20154Q599 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 05/23/1988 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20154Q604 | List: |
| References | |
| NUDOCS 8806070068 | |
| Download: ML20154Q599 (1) | |
See also: IR 05000324/1988016
Text
p-
-l
. . . .
$
MAY 2 31968
CJrolina Power and Light Company
MTTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-325/88-16 AND 50-324/88-16
The above-subject inspection report was transmitted to you by letter.
It has
come to our attention that the date was inadvertently omitted from the letter.
A dated, signed letter is enclosed.
Please delete the superseded letter and
insert the corrected letter with your copy of the report.
Please contact us if you have any questions concerning the matter.
Sincerely,
%%
A
Alan R. Herdt, Chief
Engineering Branch
Division of Reactor Safety
i
Enclosure:
As Stated
cc w/er.cl:
tV. W. Howe, Vice President
(G(BrunswickNuclearProject
R. Dietz, Plant General Manager
bec w/ encl:
LNRt Resident Inspector
DRS, Technical Assistant
Document Control Desk
State of North Carolina
H. L. Whitener, RII
B. B. Desai, RII
RII
RI fs
EldQ)
HWniterer:gb
FJape
05/2f/88
05
8
'
8806070060 880523
gg
ADOCK 05000324
O
b
yo g
.