ML20154Q599

From kanterella
Jump to navigation Jump to search
Forwards Corrected NRC Forwarding Insp Repts 50-324/88-16 & 50-325/88-16 Due to Date Inadvertently Omitted from Ltr
ML20154Q599
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/23/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20154Q604 List:
References
NUDOCS 8806070068
Download: ML20154Q599 (1)


See also: IR 05000324/1988016

Text

p-

-l

. . . .

$

MAY 2 31968

CJrolina Power and Light Company

MTTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-325/88-16 AND 50-324/88-16

The above-subject inspection report was transmitted to you by letter.

It has

come to our attention that the date was inadvertently omitted from the letter.

A dated, signed letter is enclosed.

Please delete the superseded letter and

insert the corrected letter with your copy of the report.

Please contact us if you have any questions concerning the matter.

Sincerely,

%%

A

Alan R. Herdt, Chief

Engineering Branch

Division of Reactor Safety

i

Enclosure:

As Stated

cc w/er.cl:

tV. W. Howe, Vice President

(G(BrunswickNuclearProject

R. Dietz, Plant General Manager

bec w/ encl:

LNRt Resident Inspector

DRS, Technical Assistant

Document Control Desk

State of North Carolina

H. L. Whitener, RII

B. B. Desai, RII

RII

RI fs

EldQ)

HWniterer:gb

FJape

05/2f/88

05

8

'

8806070060 880523

gg

PDR

ADOCK 05000324

O

DCD

b

yo g

.