Text
_
6-M MM Log # TXX-88720 2
File # 10130 Ref. # 10CFR2.201 IR 8 ~2' NELECTRIC ggcg September 30, 1988 U. S. Nuclear Regulatory Commission Attn: Document Control Desk l
Washington, D.C.
20555 i
SUBJECT:
COMANCHEPEAKSTEAMELECTRICSTATION(CPSES)
DOCKET NO. 50-445 SEISMIC QUAllflCATION OF THE REACTOR COOLANT PUMP LUBE OIL COLLECTION SYSTEM INSPECTION REPORT ITEM NO. 50-445/8722-0-01 REF:
TV Electric letter TXX-88558 from W. G. Counsil to NRC dated July 15, 19S8 Gentlemen:
In order to keep the NRC staff apprised of changes to the implementation j
schedule for actions addressing items identified from inspection report 50-445/87-22, TV Electric is providing the following update to open item 50-445/8722-0-01.
i l
Per the above referenced letter, TV Electric's schedule for completion of the l
engineering activities for the seismic qualification of the Reactor Coolant Pump Lube Oil Collection System (RCPLOCS) is September 30, 1988.
Currently, i
the seismic qualification of the RCPLOCS is continuing with engineering i
activities estimated to be complete by October 31, 1988.
Very truly yours, c
W. G. Counsil
- d. b>
By:
_. Beck V ce President, Nuclear Engineering JDS/grr j
c - Mr. R. D. Martin, Region IV l
Resident Inspectors, CPSES (3) cs10030260 wuv,$u PDR ADOCK 05000445
[U O/
PDC O
0 j
400 knh Obw Suret LB of Mu. Tew H.41 l