ML20154P928
| ML20154P928 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 03/07/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20154P931 | List: |
| References | |
| NUDOCS 8603200456 | |
| Download: ML20154P928 (2) | |
See also: IR 05000298/1986006
Text
r
.
MAR 0 71906
In Reply Refer To:
Docket:
50-298/86-06
Nebraska Public Power District
ATTN:
J. M. Pilant, Manager, Technical
Staff-Nuclear Power Group
P. O. Box 499
Columbus, Nebraska
68601
Gentlemen:
This refers to the inspection conducted by Mr. W. M. McNeill of this office
during the period February 3-7, 1986, of activities authorized by NRC Operating
License DPR-46 for Cooper Nuclear Station, and to the discussion of our findings
with Mr. G. R. Horn and other members of your staff at the conclusion of the
inspection.
The area examined during the inspection was action you have taken with regard to
previously identified inspection findings.
Within this area, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspector.
These findings
are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
One unresolved item is identified in paragraph 2 of the enclosed inspection
report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
1
( RI':RP /A
RP A
RPB
e/
'
Neill/tw
JPJajt don
JEGaglia do
7
g/9/86
y p/86
y6/8l5!
pg83 28MR SI8S$;o
hb
\\
o
,
I \\
l
<
r
,
.
.
Nebraska Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Crk,iad Sbned By
J. E. GGcliardo
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/86-06
cc w/ enclosures:
G. R. Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- RPB
DRSP
- Resident Inspector
R. D. Martin, RA.
- SectionChief(RPB/A)
- D. Weiss, LFMB (AR-2015)
- R&SPB
- RSB
- MIS System
- W. M. McNeill
- RIV File
- RSTS Operator
- w/766
!
l
k